RequiredExperience with Government
RequiredAnnual Turnover
RequiredCertificate (Requested in ATC)
RequiredOEM Authorization Certificate Bid to RA enabled No Television TV ( 4 pieces ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) Specifications Type LED Backlit LCD LED Backlit LCD 1/29 Screen Size (Inches) 43 42
Required43
Required47
Required49
Required50
Required52
Required55
Required60
Required65
Required70
Required75
Required77
Required80
Required82
Required85
Required86
Required90
Required95
Required98
Required100 Or higher Resolution (Pixels) (1920 x 1080) Full HD (1920 x 1080) Full HD
Required(3840x2160) UHD Or higher Category Smart Smart Or higher Operating System in case of Smart TV Web OS * Static contrast Ratio 1200 : 1 * Typical Brightness 400 - 500 400 - 500 Or higher Screen Mirroring Yes * Mount Type Both table and wall mount * Inbuilt Speakers Yes * If Yes
RequiredWattage of Speakers 10W x 2 10W x 2
Required12W x 2
Required20W x 2 Or higher Sub Woofers No * Power Consumption (Watts) 59 * Ports & Connectivity Number of HDMI Ports 3 * Number of USB Ports 2 * Number of VGA Ports 0 * Number of Ethernet Ports 1 * Built-in Wi-fi Yes * Wi-fi Direct Yes * Input Composite Input Yes * Component Input Yes * RF Input Yes * Accessories Built-in set-top Box Yes * Details of accessories (included in the scope of supply) Remote Control
RequiredConnecting Cable
RequiredBatteries * Certification BIS Registration as per CRS of Meity Yes * BIS Registration Number - * Energy Star Rating in line with the Government of Indiia Notification number S O 1896(E) and S O 1 1
Required2
Required3
Required4
Required5 Or higher 2/29 1897(E) Generic Minimum Operating Temperature (Degree C) - * Maximum Operating Temperature (Degree C) - * Minimum Operating Humidity (%RH) - * Maximum Operating Humidity (%RH) - * Dimensions (Length x Breadth x Depth) (mm x mm x mm ) - * Weight (Kg) - * Warranty Warranty(Years) 3 3
Required4
Required5 Or higher * Specifications highlighted in bold are the Golden Parameters. * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer.