Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.2 LAccepted-AOC M 46 HOUSING BOARD UNIT MATHAYANKUTTAI METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹19.2 L Quoted ₹18.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹19.2 LRejected-AOC 150 1ST STREET THOTTILPATHY SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹19.2 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Mino and co L1 | SATHISH ENGINEERING L2 |
|---|---|---|---|---|---|
| 1.00 | Draining of Mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. After inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (Department vehicle will be provided for drawl of oil at free of cost). | 2 | Mills | 9,615 ₹19,230 Lowest | 9,820 ₹19,640 |
| 2.00 | Charges for cleaning the gearbox internals like worm shaft and worm wheel. Draining the cooling water from cooling coil, cleaning and inspection of worm wheel teeth, cleaning the cooling coil Arresting the leakages in the water line, assembling back the cooling coil covers, filling the gearbox oil up to normal level. | 6 | Mills | 22,435 ₹1,34,610 Lowest | 23,200 ₹1,39,200 |
| 3.00 | Charges for providing wedges between lower skirt and Mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. Lowering the thrust bearings and reassembling of all the above parts, providing SS shims at the bottom cover flange. Blue matching the worm shaft and worm wheel engagement till we get 20 to 50% pattern by trial method releasing/ providing thin SS shim at the bottom cover flange and to get proper running clearance and centering of engagement. | 6 | Mills | 27,000 ₹1,62,000 Lowest | 28,000 ₹1,68,000 |
| 4.00 | Charges for dismantling and removing worn out thrust bearing of Mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft and assembling back Old/new thrust bearing after heating the racer in oil bath.(If necessary) | 2 | Mills | 15,260 ₹30,520 Lowest | 15,700 ₹31,400 |
| 5.00 | Charges for Renewal of thrust bearing adopter by oil heating and using necessary fixture for assembling the adopter in correct position after positioning the shims below the worm gear hub lock nut. Removing the thrust bearing adopter (worn out) and assembling the Old/new adopter by heating (If necessary) | 2 | Mills | 12,230 ₹24,460 Lowest | 12,500 ₹25,000 |
| 6.00 | Charges for Dismantling of upper skirt assembly, lower skirt assembly, Mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of Mill bottom cover, upper bearing housing cover, oil seals etc., Complete overhauling, assembling back the lower skirt assembly, scrapper assembly and arresting the oil leakages in the return line and also spillage’s at the rear side of gearbox to prevent Mill fire including cleaning and tapping the threaded holes. | 6 | Mills | 29,250 ₹1,75,500 Lowest | 30,100 ₹1,80,600 |
| 7.00 | Charges for dismantling the triangular liners, cutting the bulged Mill bottom plate, applying refractory cement at the Mill bottom plate 1 set by providing bolts and welding in Mills. (If necessary) | 6 | Mills | 34,500 ₹2,07,000 Lowest | 36,000 ₹2,16,000 |
| 8.00 | Charges for removing the old coupling halves from the motor and worm shaft ends. The charges includes gas heating the new/old coupling halves in the motor shaft and worm shaft and assembling the new/ old coupling in motor shaft and worm shaft. (If necessary) | 2 | Mills | 21,850 ₹43,700 Lowest | 22,300 ₹44,600 |
| 9.00 | Charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc. | 6 | Mills | 32,780 ₹1,96,680 Lowest | 33,400 ₹2,00,400 |
| 10.00 | Charges for checking the bearing clearance after dismantling the thrust bearing and radial bearing housing covers, removing the bushes, springs etc. thoroughly cleaning the bearing housings and other components inspecting the thrust bearings, resetting the axial clearance by reducing the thickness of shims in the thrust bearing housing cover, providing of new shims and by trial method adjusting the clearance to 0.10 mm to 0.15 mm. Assembling back the thrust and radial bearing housing properly and renewing the gland studs and gland packing in the worm shaft assembly. | 6 | Mills | 44,780 ₹2,68,680 Lowest | 45,900 ₹2,75,400 |
Tender Value
Refer Docs
EMD Value
₹18,700
Closing Date
16 Feb 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant I Complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in Mills 1A to 1F during AOH
2026_EB_649709_1
CE / MTPS-I / SE / M-I / MP /OT.507/ 2025-26
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹18,700
Yes
6 Aug 2026
2 Feb 2026
17 Feb 2026
2 Feb 2026
16 Feb 2026
2 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Draining of Mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. After inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (Department vehicle will be provided for drawl of oil at free of cost). | 2 | Mills | - | - |
| 2 | Charges for cleaning the gearbox internals like worm shaft and worm wheel. Draining the cooling water from cooling coil, cleaning and inspection of worm wheel teeth, cleaning the cooling coil Arresting the leakages in the water line, assembling back the cooling coil covers, filling the gearbox oil up to normal level. | 6 | Mills | - | - |
| 3 | Charges for providing wedges between lower skirt and Mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. Lowering the thrust bearings and reassembling of all the above parts, providing SS shims at the bottom cover flange. Blue matching the worm shaft and worm wheel engagement till we get 20 to 50% pattern by trial method releasing/ providing thin SS shim at the bottom cover flange and to get proper running clearance and centering of engagement. | 6 | Mills | - | - |
| 4 | Charges for dismantling and removing worn out thrust bearing of Mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft and assembling back Old/new thrust bearing after heating the racer in oil bath.(If necessary) | 2 | Mills | - | - |
| 5 | Charges for Renewal of thrust bearing adopter by oil heating and using necessary fixture for assembling the adopter in correct position after positioning the shims below the worm gear hub lock nut. Removing the thrust bearing adopter (worn out) and assembling the Old/new adopter by heating (If necessary) | 2 | Mills | - | - |
| 6 | Charges for Dismantling of upper skirt assembly, lower skirt assembly, Mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of Mill bottom cover, upper bearing housing cover, oil seals etc., Complete overhauling, assembling back the lower skirt assembly, scrapper assembly and arresting the oil leakages in the return line and also spillage’s at the rear side of gearbox to prevent Mill fire including cleaning and tapping the threaded holes. | 6 | Mills | - | - |
| 7 | Charges for dismantling the triangular liners, cutting the bulged Mill bottom plate, applying refractory cement at the Mill bottom plate 1 set by providing bolts and welding in Mills. (If necessary) | 6 | Mills | - | - |
| 8 | Charges for removing the old coupling halves from the motor and worm shaft ends. The charges includes gas heating the new/old coupling halves in the motor shaft and worm shaft and assembling the new/ old coupling in motor shaft and worm shaft. (If necessary) | 2 | Mills | - | - |
| 9 | Charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc. | 6 | Mills | - | - |
| 10 | Charges for checking the bearing clearance after dismantling the thrust bearing and radial bearing housing covers, removing the bushes, springs etc. thoroughly cleaning the bearing housings and other components inspecting the thrust bearings, resetting the axial clearance by reducing the thickness of shims in the thrust bearing housing cover, providing of new shims and by trial method adjusting the clearance to 0.10 mm to 0.15 mm. Assembling back the thrust and radial bearing housing properly and renewing the gland studs and gland packing in the worm shaft assembly. | 6 | Mills | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_778947.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].