Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.5 L+₹2,730 (1.10%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.5 L+₹4,690 (1.89%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
22 Sept 2026, 12:00 pmClosed
E.E.C BR-X
28, PRINCE ANWAR SHAH ROAD KOLKATA-700033
MAINTENANCE OF UTTARAN SANITARY LATRINE AT 63 ,79A KUMAR PARA LANE ETC IN WARD NO-091 BR-X
2026_KMC_1041881_1
X/091/10/26-27
Open Tender
CIVIL WORKS
Percentage
60 days
WARD-091
PLEASE REFER TENDER DOCUMENTS.
5 documents required · 5 mandatory
₹0
₹5,000
25 Sept 2026
15 Sept 2026
24 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof. | 1.44 | M3 | 1,956 | ₹2,816.64 |
| 2 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%. | 14.44 | SQM | 335 | ₹4,837.4 |
| 3 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.I. SAIL/ TATA/RINL. | 0.64 | MT | 58,249 | ₹37,279.36 |
| 4 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 1.44 | M3 | 5,498 | ₹7,917.12 |
| 5 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(17)18 mm. to 22 mm. thick, kota stone slab set in 20 mm thick (avg) cement mortar (1:4) in floor, stair & lobby including pointing in cement slurry with admixture of pigment matching the stone shade, including grinding & polishing as per direction of Engineer - in - charge to match with the existing work. [Slurry for bedding @ 4.4 kg/Sq.m and pointing @2.0 kg/Sq.m](Add extra for each addl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 of subhead A. (I) upto 4 th floor- Rs. 12/-per Sq.m II) above 4th floor -Rs. 16/- per Sq.m | 19.64 | SQM | 1,016 | ₹19,954.24 |
| 6 | BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 35. Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (C) Floor. With Polymerised Adhesive and Epoxy grout pointing including spacer- 2 mm ( When Tiles are laid over existing hard ready surface) (a) Area of each tile upto 0.09 Sq.m [using adhesive 3 mm thick] (ii) Other than Coloured decorative including white. Note:- 1 . If Cement grout is used in place of epoxy grout then deduct Rs 115/ Sq.m for item 35 (C) [a] & 35 (D) [a] and Rs 87/ Sq.m for item 35 (C) [b] & 35 (D) [b]of subhead A. : 2. Add extra for each addl, floor over the rate for item 35 & 36 of subhead A. (i) upto 4 th floor-Rs 5/ Sq.m (i) above 4 th floor-Rs 6.25/ Sq.mcement mixed with colouring oxide if required to match the colour of tiles including | 24.48 | SQM | 736 | ₹18,017.28 |
| 7 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 67.8 | SQM | 19 | ₹1,288.2 |
| 8 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (b) 20 mm thick plaster | 67.8 | SQM | 167 | ₹11,322.6 |
| 9 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A.BRICK WORKS 6 (a) Brick work with 1st class bricks in lime and surki mortar (1:3) ( 1 lime putty/paste: 3 surki) lime to be slaked at site and the mortar to be prepared with such lime putty and first class surki made from kiln burnt bricks having its fineness modulus between 2 and 2.5 and which passes through B.S. sieve No 8 with correspondes to I.S sieve No 200 with considerable grinding and pugging it complete. b) In Super structure, Ground Floor. Notes:-(a) For lime surki brick work in foundation below G.L. hydraulic lime as per specification should be used. In other lime-surki brick work (above G.L.) fat lime as per specification will be used. (b) In all items of works viz. brick work, plastering, lime terracing etc. involving use of lime, the proportion of lime in all such items indicating its measurement by volume is of putty/paste form, which may be obtained from unslaked lime in the following rate, i.e. 633 kg of unslaked lime form 1.00 Cu.m by volume of lime putty/paste. | 0.14 | M3 | 5,658 | ₹792.12 |
| 10 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 4.Colour washing with any shade with Stainers, as required including cleaning and smoothening surface thoroughly : (i) Internal surface (All floors) (b) Two coats (on new works only). (b) Two coats (on new works only). (i) Other than yellow, pink. | 0.61 | %SQ | 2,061 | ₹1,257.21 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
TF91010.pdf
Tender Documents • 0.58 MB
civil.pdf
Additional Documents • 4.88 MB
BOQ_2557788.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .