Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 106 GREEN AVANUE NAGAR AJMER ROAD GAJSINGHPURA JAIPUR RAJASTHAN 302021 | JAIPUR | RAJASTHAN | 302021 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical 0 322230 | KARAULI | RAJASTHAN | 322230 | Rejected-Technical Documents not Submited |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
18 Dec 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DCF IGNP STAGE-II- BIKANER
DCF IGNP STAGE-II- BIKANER
E-BID-NO-05- Barbad Wire work
2023_FORES_376208_2
E-BID-NO 05-2023-24
Open Tender
Civil Works
Percentage
30 days
DCF IGNP STAGE-II- BIKANER
E-BID-NO-05- Barbad Wire work
2 documents required · 2 mandatory
₹1,000
DCF IGNP STAGE-II- BIKANER
₹60,000
Yes
19 Dec 2023
12 Dec 2023
19 Dec 2023
12 Dec 2023
18 Dec 2023
12 Dec 2023
Amount
1. The mass in G/M shall be obtained by dividing the total mass of the reel by linear length in metres. Bundles should be about 50 Kg. 2. The Supply order in respect of 75mm +- 12 mm barbs distance. 3. The Un-Galvanised barbed wire shall be manufactured from mild steel wire conforming to IS:MS wire rod 8MM Grade 7887(latest amended). The Barbed wire shall be formed by twisting together two line wires. 4.The barbs shall be so finished that the four points are set and located or locked as far as possible at right angies to each other.The points shall be sharp and cut at an angle not greater than 35 to axis of the wire forming the barbs. 5.The line and point wire shall be circular in section, free from scales and other defects and shall be unifirmly galvanized. 6. The line wire shall be in continuous lengths and shall not contain any welds other than those in the rod before it is drawn. The distance between two seccessive welding in the line wise wire of finished barbed wire shall not be less than 15m.There shall be no Splicing.
Sharma Industries
SHREE BALA JI ENGINEERING WORKS
Jai Shivshakti Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .