Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance B2 TOWER 3RD FLOOR CEREBRUM IT PARK KALYANI NAGAR PUNE PUNE MAHARASHTRA 411014 | PUNE | MAHARASHTRA | 411014 | Admitted-Finance |
| 3 | Admitted-Finance HADAPSAR INDUSTRIAL ESTATE HADAPSAR INDUSTRIAL ESTATE HADAPSAR POST OFFICE HADAPSAR PUNE MAHARASHTRA 411013 | PUNE | MAHARASHTRA | 411013 | Admitted-Finance |
| 4 | Rejected-Technical 79 B T ROAD PANIHATI KOLKATA 700114 NORTH 24 PARGANAS WEST BENGAL 700114 | 24 PARAGANAS NORTH | WEST BENGAL | 700114 | Rejected-Technical Technically Rejected |
Tender Value
Refer Docs
Closing Date
5 Nov 2024, 2:00 pmClosed
Rajesh H.Ambawad.
Rajesh H.Ambawad. 5th floor,new service block,C-P15B
DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF Refrigeration Plant FOR MDL YARD 16401/02/03/04/05/06 OF PROJECT 06(six) NEXT GENERATION OFFSHORE PATROL VESSELS FOR INDIAN COAST GUARD.
2024_MDL_95695_1
1600002004
Limited
Miscellaneous Goods
Supply
Mazagondock ship builders limited, Doclyard road
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
4 Apr 2025
16 Sept 2024
6 Nov 2024
16 Sept 2024
5 Nov 2024
16 Sept 2024
Amount
Refrigeration Plant of 2.15TR capacity along with two condensers, 2 compressors, control panels, Commissioning Consumables (First charge of Oils, coolants, and Greases for the equipment) and all accessories and Instruments as per SOTR
Condenser cooling sea water pump with control panel and all accessories (including Pressure gauges with Protecting Cover for suction and discharge of the pumps along with three way cocks - One set for each pump) as per SOTR. ICG NGOPV
Push button for man locked alaram
Refrigerant cylinders for one complete filling.1 set= one complete filling
Instrumentation and Valves as per SOTR
Supply Of Piping & Cabling as per SOTR
On-board spares for Refrigeration Plant and pump
DOCUMENTATION OF REFRIGERATION PLANT
Air cooling Units for cold room and cool room including accessories (expansion valves, thermostats etc)
INSTALLATION SUPERVISION - DELIVERY DATE: 30TH NOV,2025 -STW - DELIVERY DATE: 31ST JULY,2026 -HAT's - DELIVERY DATE: 31ST AUG,2026 -COMMISSIONING
Manning Charges for 8 hr Shift -30 Shift
OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS
Extra Man-Days - 1st Year (From 01.05.2025 to 30.04.2026)
Extra Man-Days - 2nd Year (From 01.05.2026 to 30.04.2027)
RE-Preservation Charges - 0-6 months
RE-Preservation Charges - 7-12 months
Refrigeration Plant of 2.15TR capacity along with two condensers, 2 compressors, control panels, Commissioning Consumables (First charge of Oils, coolants, and Greases for the equipment) and all accessories and Instruments as per SOTR
Condenser cooling sea water pump with control panel and all accessories (including Pressure gauges with Protecting Cover for suction and discharge of the pumps along with three way cocks - One set for each pump) as per SOTR. ICG NGOPV
Push button for man locked alaram
Refrigerant cylinders for one complete filling. 1 set= one complete filling.
Instrumentation and Valves as per SOTR
Supply Of Piping & Cabling as per SOTR
On-board spares for Refrigeration Plant and pump
DOCUMENTATION OF REFRIGERATION PLANT
Air cooling Units for cold room and cool room including accessories (expansion valves, thermostats etc)
INSTALLATION SUPERVISION - DELIVERY DATE: 30TH APR 2026,STW - DELIVERY DATE: 31ST DEC 2026, HAT's - DELIVERY DATE: 30TH JAN,2027, COMMISSIONING
Manning Charges for 8 hr Shift -30 Shift
OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS
Extra Man-Days - 1st Year (From 01.10.2025 to 30.09.2026)
Extra Man-Days - 2nd Year (From 01.10.2026 to 30.09.2027)
RE-Preservation Charges - 0-6 months
RE-Preservation Charges - 7-12 months
Refrigeration Plant of 2.15TR capacity along with two condensers, 2 compressors, control panels, Commissioning Consumables (First charge of Oils, coolants, and Greases for the equipment) and all accessories and Instruments as per SOTR
Condenser cooling sea water pump with control panel and all accessories (including Pressure gauges with Protecting Cover for suction and discharge of the pumps along with three way cocks - One set for each pump) as per SOTR. ICG NGOPV
Push button for man locked alaram
Refrigerant cylinders for one complete filling. 1 set= one complete filling.
Instrumentation and Valves as per SOTR
Supply Of Piping & Cabling as per SOTR
On-board spares for Refrigeration Plant and pump
DOCUMENTATION OF REFRIGERATION PLANT
Air cooling Units for cold room and cool room including accessories (expansion valves, thermostats etc)
INSTALLATION SUPERVISION - DELIVERY DATE: 30TH SEP,2026,STW - DELIVERY DATE: 31ST MAY,2027,HAT's - DELIVERY DATE: 30TH JUN,2027,COMMISSIONING
Manning Charges for 8 hr Shift -30 Shift
OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS
Extra Man-Days - 1st Year (From 01.03.2026 to 28.02.2027)
Extra Man-Days - 2nd Year (From 01.03.2027 to 28.02.2028)
RE-Preservation Charges - 0-6 months
RE-Preservation Charges - 7-12 months
Refrigeration Plant of 2.15TR capacity along with two condensers, 2 compressors, control panels, Commissioning Consumables (First charge of Oils, coolants, and Greases for the equipment) and all accessories and Instruments as per SOTR
Condenser cooling sea water pump with control panel and all accessories (including Pressure gauges with Protecting Cover for suction and discharge of the pumps along with three way cocks - One set for each pump) as per SOTR. ICG NGOPV
Push button for man locked alaram
Refrigerant cylinders for one complete filling. 1 set= one complete filling.
Instrumentation and Valves as per SOTR
Supply Of Piping & Cabling as per SOTR
On-board spares for Refrigeration Plant and pump
DOCUMENTATION OF REFRIGERATION PLANT
Air cooling Units for cold room and cool room including accessories (expansion valves, thermostats etc)
INSTALLATION SUPERVISION - DELIVERY DATE: 28TH FEB,2027 -STW - DELIVERY DATE: 31ST OCT,2027 -HAT's - DELIVERY DATE: 30TH NOV,2027 -COMMISSIONING
Manning Charges for 8 hr Shift -30 Shift
OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS
Extra Man-Days - 1st Year (From 01.08.2026 to 31.07.2027)
Extra Man-Days - 2nd Year (From 01.08.2027 to 31.07.2028)
RE-Preservation Charges - 0-6 months
RE-Preservation Charges - 7-12 months
Refrigeration Plant of 2.15TR capacity along with two condensers, 2 compressors, control panels, Commissioning Consumables (First charge of Oils, coolants, and Greases for the equipment) and all accessories and Instruments as per SOTR
Condenser cooling sea water pump with control panel and all accessories (including Pressure gauges with Protecting Cover for suction and discharge of the pumps along with three way cocks - One set for each pump) as per SOTR. ICG NGOPV
Push button for man locked alaram
Refrigerant cylinders for one complete filling. 1 set= one complete filling.
Instrumentation and Valves as per SOTR
Supply Of Piping & Cabling as per SOTR
On-board spares for Refrigeration Plant and pump
DOCUMENTATION OF REFRIGERATION PLANT
Air cooling Units for cold room and cool room including accessories (expansion valves, thermostats etc)
INSTALLATION SUPERVISION - DELIVERY DATE: 31TH JULY,2027 -STW - DELIVERY DATE: 31ST MARCH ,2028 -HAT's - DELIVERY DATE: 30TH APR,2028 -COMMISSIONING
Manning Charges for 8 hr Shift -30 Shift
OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS
Extra Man-Days - 1st Year (From 01.01.2027 to 31.12.2027)
Extra Man-Days - 2nd Year (From 01.01.2028 to 31.12.2028)
RE-Preservation Charges - 0-6 months
RE-Preservation Charges - 7-12 months
Refrigeration Plant of 2.15TR capacity along with two condensers, 2 compressors, control panels, Commissioning Consumables (First charge of Oils, coolants, and Greases for the equipment) and all accessories and Instruments as per SOTR
Condenser cooling sea water pump with control panel and all accessories (including Pressure gauges with Protecting Cover for suction and discharge of the pumps along with three way cocks - One set for each pump) as per SOTR. ICG NGOPV
Push button for man locked alaram
Refrigerant cylinders for one complete filling. 1 set= one complete filling.
Instrumentation and Valves as per SOTR
Supply Of Piping & Cabling as per SOTR
On-board spares for Refrigeration Plant and pump
DOCUMENTATION OF REFRIGERATION PLANT
Air cooling Units for cold room and cool room including accessories (expansion valves, thermostats etc)
INSTALLATION SUPERVISION - DELIVERY DATE: 31ST DEC,2027,STW - DELIVERY DATE: 31TH AUG,2028,HAT's - DELIVERY DATE: 30TH SEPT,2028,COMMISSIONING
Manning Charges for 8 hr Shift -30 Shift
OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS
Extra Man-Days - 1st Year (From 01.06.2027 to 31.05.2028)
Extra Man-Days - 2nd Year (From 01.06.2028 to 31.05.2029)
RE-Preservation Charges - 0-6 months
RE-Preservation Charges - 7-12 months
Air Control And Chemical Engg. Co. Ltd. (BID ID -410968)
Johnson Controls (India) Private Ltd. (BID ID -411310)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Restricted Tender
This is a Limited tender. Documents are accessible only to bidders authorized by the issuing authority on the government portal.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .