Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹10.3 L+₹44,968 (4.57%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical 208 L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹19,800
Closing Date
6 Sept 2021, 3:00 pmClosed
CWA(WnS)II
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE CHIEF WATER ANALYST (WnS)- II HAIDERPUR WATER WORKS DELHI 110085
Replacement of 02 Nos. HDPE Tank (10,000 Ltr. Capacity each) with accessories connects to existing PAC network and also cleaning / flushing of old PAC storage HDPE Tank No. 01 to 32 at HP-I.
2021_DJB_207725_1
NIT No. 05(21-22)/Re-invite/CWA(WnS)II HP
Open Tender
Miscellaneous Works
Works
90 days
HAIDERPUR WATER WORKS
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Online subpaisa portal Allahabad Bank
₹19,800
Yes
22 Oct 2021
28 Aug 2021
6 Sept 2021
28 Aug 2021
6 Sept 2021
28 Aug 2021
Providing 50 mm PVC ball valve assembly with PVC cut flanges, gaskets, S.S. Nuts & bolts, washer. (Make: Parth/Prince)
(i)Providing of 2" PVC pipe in 10 Kg/cm2. (Make : Prince)
(ii) Providing of PVC fittings. Make: Prince
(iii) Laying of 2" PVC pipeline underground/overground of 50 mtrs as required.
Supply/Installing of Rotax make 10,000/- litres HDPE tank with 12 mm average thickness.
Providing of Level Indicator system for 10,000 litre HDPE Rotax tanks.
Cleaning of 10,000 litre HDPE Rotax tanks filled with solidified PAC ranging 1-2 ft. Height. The scrapping has to be done with utmost care as not to damage the side walls of old HDPE tanks whose side have hardened over time. The work to be done under the supervision of manufacturer's personnel. Make : ROTAX
Providing civil foundation for 02 HDPE tanks size of foundation size : 22 ft x 10 ft x 3 ft
Testing commissioning of the whole system and looking after the same for 12 months.
HIMTECH VENTURES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .