| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹3.1 LAccepted-AOC | L 1 | Accepted-AOC Due to L1 bidder ,contract alloted | |
| 2 | L-2₹3.5 L+₹25,880 (8.09%)Rejected-AOC | L-2 | Rejected-AOC Due to L 2,contract not alloted | |
| 3 | L 3₹3.5 L+₹29,465 (9.21%)Rejected-AOC 00 VIDYUT NAGAR MEERANPUR SADDARALI TANDA AMBEDKAR NAGAR UTTAR PRADESH 224238 | AMBEDKAR NAGAR | UTTAR PRADESH | 224238 | L 3 | Rejected-AOC Due to L3 ,contract not alloted |
Tender Value
₹3.1 L
EMD Value
₹6,255
Closing Date
22 Oct 2020, 5:00 pmClosed
OFFICE OF SE OMC 4 BTPS PTPP PARICHHA JHANSI
OFFICE OF SE OMC 4 BTPS PTPP PARICHHA JHANSI
Overhauling of Lighting Transformer, NLPs, MLDBs , fabrication of welding recepticals and other miscellaneous work during O/H of U#4 of 2x210 MW PTPP Parichha
2020_RVUNL_513965_1
ET-14/EMD-II/BTPS/PTPP/2020-21
Open Tender
Electrical Works
Fixed-rate
90 days
parichha jhansi
As per PQC
3 documents required · 3 mandatory
₹590
DY CAO PTPP PARICHHA JHANSI
₹6,255
4 Dec 2020
22 Sept 2020
23 Oct 2020
22 Sept 2020
22 Oct 2020
23 Sept 2020
Amount
Overhauling of Lighting transformer (Isolation Transformer).
Overhauling of Main Lighting distribution board (MLDB) .
Providing Lighting staff for providing Temporary connection to different Division (TMD/BMD-I /II /CAMD/EMD-I)during over hauling period of Unit No. 4 .(One job consist 08 hrs working period with two no electrician)
Providing assistance for load test of 02 No. battery banks of Unit No. 4 during OH period. (Total cells 220 Nos. , per cell voltage 2V, 1800 amp hour). .
Installation and commissioning of 200 amp /400 Amp MCCB with Bus bar chamber with cable connection.
Supply of 100 amp four pole G frame MCCB (fixed thermal and magnetic setting) with 10 KA breaking capacity along with SS enclosure . (MAKE: Bajaj /Havells/Philips/Anchor/C&S/Crompton greaves/Schneider)
Salvaging/laying of LT cable per meter 3CX185&3CX150mm square
Salvaging/laying of LT cable per meter 3CX120 & 3CX 95mm square
Relugging of of LT cable 3CX185&3CX150 mm square
Relugging of of LT cable 3CX120&3CX 95mm square
Overhauling of NLP(Normal Lighting panel)..
Installation and commissioning of Normal Lighting panel (NLP) with cable connection.
Installation and commissioning of 63 amp Triple Pole Main Switch (01 no) and 100 amp four pole G frame MCCB (01 no) with cable connection.(One job consist of 01 no Main switch and 01 MCCB with enclosure)
M/S MRP CONSTRUCTIONS
M/S PRIYA CONSTRUCTION CO.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .