Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC KOTA BASTI SHAKTINAGAR P O SHAKTINAGAR DISTT SONBHADRA U P 231222 | SONBHADRA | UTTAR PRADESH | 231222 | ₹1.4 Cr | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2 BIDDER DUE TO NOT L1 BIDDER |
| 2 | L2₹1.5 Cr+₹5.2 L (3.62%)Rejected-Finance C O VOLTAS LIMITED SPARE PARTS DEPOT OLD HUTMENT COLONY NCL NIGAHI SINGRAULI M P 486884 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486884 | ₹1.5 Cr+₹5.2 L (3.62%) | L2 | Rejected-Finance REJECTED AS NOT L1 BIDDER |
| Sl No | Description | Qty | Unit | MOTI ENGINEERING WORKS L1 | Universal MEP Projects & Engineering Services Limited L2 |
|---|---|---|---|---|---|
| 1.00Periodic/Scheduled/Preventive Maintenance, Repair/Replacement Activities Required for 190T Dumper Fleet of Khadia Project for a period of 02 Years | |||||
| 1.01 | Charges for daily checking, minor repairs including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 02 Nos. Skilled Manpower (Fitter), 02 Nos. Skilled Manpower (Electrician), 01 No. Skilled Manpower (Welder) , 02 Nos. Semi-Skilled Manpower and 04 Nos. Un-Skilled Manpower per shift in 01 Shift for 01 Job. b. Total no. of daily checking, minor repair in 2 years = 720. | 720 | Job | 8,566.2 ₹61,67,664 | 7,700 ₹55,44,000 Lowest |
| 1.02 | Charges for weekly maintenance including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 0.5 shift for 01 Job. b. Total no. of weekly maintenance in 2 years per machine = 104. c. Total no. of weekly maintenance in 2 years for 15 nos. 190T Dumpers = 104 X 15 = 1560. | 1,560 | Job | 2,700 ₹42,12,000 | 2,000 ₹31,20,000 Lowest |
| 1.03 | Charges for schedule maintenance(500/1000/2000/4000 hrs) including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 01 shift for 01 Job. b. Total no. of schedule maintenance in 2 years per machine = 22. c. Total no. of schedule maintenance in 2 years for 15 nos. 190T Dumpers = 22 X 15 = 330. | 330 | Job | 2,700 ₹8,91,000 Lowest | 3,000 ₹9,90,000 |
| 1.04 | Charges for preventive 8000 to 12000 hrs maint. (cooling line, spider work etc.) including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 07 shifts for 01 Job. b. Total no. of preventive maintenance in 2 years for 15 nos. 190T Dumpers = 21. | 21 | Job | 2,700 ₹56,700 Lowest | 15,000 ₹3,15,000 |
| 1.05 | Charges for rear suspension overhauling including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 02 shifts for 01 Job. b. Total no. of rear suspension overhauling in 2 year per machine = 02. c. Total no. of rear suspension overhauling in 2 years for 15 nos. 190T Dumpers = 02 X 15 = 30. | 30 | Job | 2,700 ₹81,000 Lowest | 4,500 ₹1,35,000 |
| 1.06 | Charges for front suspension overhauling including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 03 Nos. Un-Skilled Manpower per shift in 04 shifts for 01 Job. b. Total no. of front suspension overhauling in 2 years per machine = 02. c. Total no. of front suspension overhauling in 2 years for 15 nos. 190T Dumpers = 02 X 15 = 30. | 30 | Job | 3,200 ₹96,000 Lowest | 4,500 ₹1,35,000 |
| 1.07 | Charges for hoist cylinder overhauling including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 03 shifts for 01 Job. b. Total no. of hoist cylinder overhauling in 2 years per machine = 02. c. Total no. of hoist cylinder overhauling in 2 years for 15 nos. 190T Dumpers = 02 X 15 = 30. | 30 | Job | 2,700 ₹81,000 Lowest | 4,500 ₹1,35,000 |
| 1.08 | Charges for steering system overhauling including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 05 shifts for 01 Job. b. Total no. of steering system overhauling in 2 years per machine = 01. c. Total no. of steering system overhauling in 2 years for 15 nos. 190T Dumpers = 01 X 15 = 15. | 15 | Job | 2,700 ₹40,500 Lowest | 4,500 ₹67,500 |
| 1.09 | Charges for viscous clutch repair including tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 04 shifts for 01 Job. b. Total no. of viscous clutch repair in 2 years per machine = 01. c. Total no. of viscous clutch repair in 2 years for 15 nos. 190T Dumpers = 01 X 15 = 15. | 15 | Job | 2,700 ₹40,500 Lowest | 3,000 ₹45,000 |
Tender Value
₹1.5 Cr
EMD Value
₹1.9 L
Closing Date
11 Apr 2025, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P-231222
Offloading of Periodic, Scheduled, Preventive Maintenance, Repair, Replacement Activities Required for 190T Dumper Fleet of Khadia Project for a period of 02 Years.
2025_NCL_333033_1
KHD/G.M. (Excv)/E-Tender/24-25/1151
Open Tender
Excavation Department Work
Item Rate
730 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
7 documents required · 7 mandatory
₹1.9 L
1 Sept 2025
20 Mar 2025
12 Apr 2025
20 Mar 2025
11 Apr 2025
21 Mar 2025
20 Mar 2025 - 29 Mar 2025
Amount
Periodic/Scheduled/Preventive Maintenance, Repair/Replacement Activities Required for 190T Dumper Fleet of Khadia Project for a period of 02 Years
Charges for daily checking, minor repairs including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 02 Nos. Skilled Manpower (Fitter), 02 Nos. Skilled Manpower (Electrician), 01 No. Skilled Manpower (Welder) , 02 Nos. Semi-Skilled Manpower and 04 Nos. Un-Skilled Manpower per shift in 01 Shift for 01 Job. b. Total no. of daily checking, minor repair in 2 years = 720.
Charges for weekly maintenance including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 0.5 shift for 01 Job. b. Total no. of weekly maintenance in 2 years per machine = 104. c. Total no. of weekly maintenance in 2 years for 15 nos. 190T Dumpers = 104 X 15 = 1560.
Charges for schedule maintenance(500/1000/2000/4000 hrs) including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 01 shift for 01 Job. b. Total no. of schedule maintenance in 2 years per machine = 22. c. Total no. of schedule maintenance in 2 years for 15 nos. 190T Dumpers = 22 X 15 = 330.
Charges for preventive 8000 to 12000 hrs maint. (cooling line, spider work etc.) including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 07 shifts for 01 Job. b. Total no. of preventive maintenance in 2 years for 15 nos. 190T Dumpers = 21.
Charges for rear suspension overhauling including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 02 shifts for 01 Job. b. Total no. of rear suspension overhauling in 2 year per machine = 02. c. Total no. of rear suspension overhauling in 2 years for 15 nos. 190T Dumpers = 02 X 15 = 30.
Charges for front suspension overhauling including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 03 Nos. Un-Skilled Manpower per shift in 04 shifts for 01 Job. b. Total no. of front suspension overhauling in 2 years per machine = 02. c. Total no. of front suspension overhauling in 2 years for 15 nos. 190T Dumpers = 02 X 15 = 30.
Charges for hoist cylinder overhauling including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 03 shifts for 01 Job. b. Total no. of hoist cylinder overhauling in 2 years per machine = 02. c. Total no. of hoist cylinder overhauling in 2 years for 15 nos. 190T Dumpers = 02 X 15 = 30.
Charges for steering system overhauling including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 05 shifts for 01 Job. b. Total no. of steering system overhauling in 2 years per machine = 01. c. Total no. of steering system overhauling in 2 years for 15 nos. 190T Dumpers = 01 X 15 = 15.
Charges for viscous clutch repair including tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 04 shifts for 01 Job. b. Total no. of viscous clutch repair in 2 years per machine = 01. c. Total no. of viscous clutch repair in 2 years for 15 nos. 190T Dumpers = 01 X 15 = 15.
Charges for engine replacement including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 02 Nos. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 12 shifts for 01 Job. b. Total no. of engine replacement in 2 years per machine = 01. c. Total no. of engine replacement in 2 years for 15 nos. 190T Dumpers = 01 X 15 = 15.
Charges for transmission replacement including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 03 shifts for 01 Job. b. Total no. of transmission replacement in 2 years per machine = 01. c. Total no. of transmission replacement in 2 years for 15 nos. 190T Dumpers = 01 X 15 = 15.
Charges for TC replacement including tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 02 shifts for 01 Job. b. Total no. of TC replacement in 2 years per machine = 01. c. Total no. of TC replacement in 2 years for 15 nos. 190T Dumpers = 01 X 15 = 15.
Charges for PTO Repair & Pump Replacement including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 03 shifts for 01 Job. b. Total no. of PTO Repair & Pump Replacement in 2 years per machine = 01. c. Total no. of PTO Repair & Pump Replacement in 2 years for 15 nos. 190T Dumpers = 01 X 15 = 15.
Charges for Front Brake Overhauling including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 03 shifts for 01 Job. b. Total no. of Front Brake Overhauling in 2 years per machine = 02. c. Total no. of Front Brake Overhauling in 2 years for 15 nos. 190T Dumpers = 02 X 15 = 30.
Charges for Rear Brake Overhauling including tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 05 shifts for 01 Job. b. Total no. of Rear Brake Overhauling in 1 year per machine = 02. c. Total no. of Rear Brake Overhauling in 2 years for 15 nos. 190T Dumpers = 02 X 15 = 30.
Charges for Differential Overhauling including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 08 shifts for 01 Job. b. Total no. of Differential Overhauling in 2 years per machine = 01. c. Total no. of Differential Overhauling in 2 years for 15 nos. 190T Dumpers = 01 X 15 = 15.
Charges for Final Drive Overhauling including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 04 shifts for 01 Job. b. Total no. of Final Drive Overhauling in 2 years per machine = 02. c. Total no. of Final Drive Overhauling in 2 years for 15 nos. 190T Dumpers = 02 X 15 = 30.
Charges for Front Wheel Bearing Replacement including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower(Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 01 shift for 01 Job. b. Total no. of Front Wheel Bearing Replacement in 2 years per machine = 02. c. Total no. of Front Wheel Bearing Replacement in 2 years for 15 nos. 190T Dumpers = 02 X 15 = 30.
Charges for Air Line Overhauling & Brake Cylinder Repair including charges for tools, tackles, safety items and contractor's profit . . Note: a. It includes 01 No. Skilled Manpower (Fitter), 01 No. Semi-Skilled Manpower and 02 Nos. Un-Skilled Manpower per shift in 02 shifts for 01 Job. b. Total no. of Air Line Overhauling & Brake Cylinder Repair in 2 years per machine = 01. c. Total no. of Air Line Overhauling & Brake Cylinder Repair in 2 years for 15 nos. 190T Dumpers = 01 X 15 = 15.
Total impact of GST for the purpose of CTC
Universal MEP Projects & Engineering Services Limited (BID ID -1146836)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .