Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | ₹2.1 L Quoted ₹5.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.9 LRejected-AOC | ₹5.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | C Maria Cross L2 | TAMILMARAN ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Sweeping and cleaning of floors in the Chemical house, Oil filter shed & DG building (working day) and workshop building, Hydrogen Gas cylinder room (Alternate days) including cost of all materials required for sweeping and cleaning materials, Tools and plants, labour charges, lead and lift and safety appliance etc., complete | |||||
| 1.10 | Sweeping for working days | 2,99,968 | m2 | 0.55 ₹1.6 L | 0.51 ₹1.5 L |
| 1.20 | Sweeping for Alternate days | 58,568 | m2 | 0.55 ₹32,212.40 | 0.51 ₹29,869.68 |
| 2.00Moping and cleaning of floors in Chemical house (Working days) and workshop building (Once in a week) including cost of all materials required for Moping and cleaning materials, Tools and plants, labour charges, lead and lift and safety appliance etc., complete | |||||
| 2.10 | Moping for working days | 25,281 | m2 | 0.75 ₹18,960.75 | 0.7 ₹17,696.70 |
| 2.20 | Moping for once in a week | 15,352 | m2 | 0.75 ₹11,514 | 0.7 ₹10,746.40 |
| 3.00 | Cleaning of cobwebs and coal dust etc., in the ceiling walls, columns and structures etc., in the Chemical house, workshop building, Hydrogen Gas cylinder room & Oil filter shed cost of all required cleaning materials, Tools and Plants, labour charges, leads and lift, scaffolding & safety appliances etc., complete (Once in Two Month) | 13,653 | m2 | 4.83 ₹65,943.99 | 4.49 ₹61,301.97 |
| 4.00 | Cleaning of drains, around the Chemical house, Oil filter shed & Workshop building, removal and disposal of silt, slush 1 Km away from the site, including cleaning bushes and debries etc., whenever necessary as directed by the Engineer at site including cost of all labour charges, all lead and lift, all T&P's safety appliances etc, complete (Monthly two times) | 6,087 | RM | 4.53 ₹27,574.11 | 4.22 ₹25,687.14 |
| 5.00 | Up keeping of toilets by cleaning water closet, urinals, wash basins, cistem tank, side walls, flooring and passage etc, by applying detergents such as cine fresh Phenoyl (two cleaning per toilets per day) as directed by the Engineer at site including cost of using tools like bucket, brooms, etc., and labour charges complete but excluding the cost of bleaching powder, Naphthalene balls, cine fresh phenoyl and cleaning strainer. The water will be used at free of cost | 2,144 | Nos | 127.65 ₹2.7 L | 118.77 ₹2.5 L |
Tender Value
Refer Docs
EMD Value
₹4,800
Closing Date
24 Feb 2025, 2:00 pmClosed
SE CM NCTPS II
Office of CE NCTPS II chennai 120
NCTPS II Civil Maintenance Circle Civil Maintenance Division Sweeping and Moping the floors cleaning the partitions doors windows removal of cobwebs and cleaning of drains at Chemical house Workshop building Hydrogen Gas cylinder room Oil filter
2025_EB_525464_1
CE/NCTPS-II/SE/CM/92 /2024-25
Open Tender
Civil Works
90 days
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,800
Yes
2 Mar 2026
17 Feb 2025
25 Feb 2025
17 Feb 2025
24 Feb 2025
17 Feb 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid