| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance | -1.00% | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.4 CrAdmitted-Finance D NO 1160 WEST END COLONY ANNA NAGAR WEST EXTENSION CHENNAI 600101 | CHENNAI | TAMIL NADU | 600101 | +0.00% | ₹3.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.5 CrAdmitted-Finance | +9.00% | ₹3.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹3.7 CrAdmitted-Finance | +3.51% | ₹3.7 Cr | L4 | Admitted-Finance |
| 5 | L5₹4.1 CrAdmitted-Finance NA | NA | NA | 121004 | +27.10% | ₹4.1 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CHANDINEE AND CO L3 | KABIL ENTERPRISES L1 | VIJAY GOWTHAM ENGINEERING WORKS L4 | APVK INFRA PRIVATE LIMITED L2 | PANCHAABHUTAM INFRA PVT LTD L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Deployment of Tractor with trolley for different maintenance related activities as directed by EIC including the cost of driver, lubrication and fuel charges etc complete | 600 | DAY | 2,000 ₹12,00,000 Lowest | 2,500 ₹15,00,000 | 2,800 ₹16,80,000 | 3,883 ₹23,29,800 | 3,200 ₹19,20,000 |
| 2.00 | Supplying water tanker of minimum 6000 liters for watering the grass turf sods for the entire length of the Ash dyke bund (3 trips per day) mounted on tractor with driver & filling arrangement including cost of all types of maintenance, spares, lubricant, operator/ driver, road taxes etc... required for.the same and any other cost for watering. The rate is inclusive of the fuel (diesel), driver, potable water etc... complete. (Good water supply is in the scope of the agency) | 900 | TRP | 750 ₹6,75,000 | 700 ₹6,30,000 Lowest | 750 ₹6,75,000 | 783 ₹7,04,700 | 1,200 ₹10,80,000 |
| 3.00 | Providing water tanker for water sprinkling in Ash dyke Roads & on hire basis (8 hours per shift) having minimum capacity of 6KL along with water filling arrangement including cost of all types of maintenance, spares, lubricant, operator/ driver, road taxes etc... required for the same and any other cost for running of vehicle and pump etc including the fuel (diesel), oil etc... complete. (Water to be drawn from NTECL OFL) | 3,200 | TRP | 350 ₹11,20,000 | 300 ₹9,60,000 Lowest | 350 ₹11,20,000 | 383 ₹12,25,600 | 550 ₹17,60,000 |
| 4.00 | Supply and application of herbicide (glyphosate based) in the locations identified after clearing all the vegetations/grass in the area as per the instruction of EIC. (@material usage 3liter for 10000 sqm, hence per 100sqm 30ml) | 1,20,000 | M2 | 1.5 ₹1,80,000 Lowest | 3 ₹3,60,000 | 3.5 ₹4,20,000 | 3 ₹3,60,000 | 4.6 ₹5,52,000 |
| 5.00 | Providing & placing HDPE bags filled with sand/ash and binding the ends with suitable twine/thread etc including the cost of HDPE bags, labor and placing in position with all leads and lifts complete and directed by EIC. | 5,000 | NO | 35 ₹1,75,000 Lowest | 50 ₹2,50,000 | 55 ₹2,75,000 | 53 ₹2,65,000 | 55 ₹2,75,000 |
| 6.00 | Deployment of backhoe loader like JCB)/EX-70 poclain excavator decided by EIC for cleaning works, debris clearing, levelling, drain clearing (small bucket attachement will be required) and other such activities as directed by EIC for 8 hours in a day including the cost of diesel and operator. | 450 | DAY | 7,000 ₹31,50,000 | 6,300 ₹28,35,000 Lowest | 7,500 ₹33,75,000 | 8,583 ₹38,62,350 | 7,200 ₹32,40,000 |
| 7.00 | Supply of un skilled man power for misc. works including tools and tackles for unforeseen works (Man day of 8 Hours) as directed by the ElC | 1,460 | MD | 1,100 ₹16,06,000 Lowest | 1,200 ₹17,52,000 | 1,300 ₹18,98,000 | 1,383 ₹20,19,180 | 1,150 ₹16,79,000 |
| 8.00 | Supply of semi skilled man power for misc. works including tools and tackles for unforeseen works (Man day of 8 Hours) as directed by the ElC | 700 | MD | 1,200 ₹8,40,000 Lowest | 1,300 ₹9,10,000 | 1,400 ₹9,80,000 | 1,483 ₹10,38,100 | 1,250 ₹8,75,000 |
| 9.00 | Deployment of qualified civil diploma supervisor for patrolling, dyke inspections, giving daily reports and to attend misc. works in Ash Pond area. | 600 | MD | 1,350 ₹8,10,000 Lowest | 1,400 ₹8,40,000 | 1,500 ₹9,00,000 | 1,583 ₹9,49,800 | 1,450 ₹8,70,000 |
| 10.00 | Dry brick pitching including pointing with CM 1:6 in half brick thick in the slopes of the bund for repariring of existing damaged/disturbed/settled brick lining, includingn the cost of removing the disturbed bricks, dressing and manually compacting the underneath surface and arranging the brick lining using the available removed bricks. (Carriage of any excess earth required shall be paid seperatle under relevant items). | 3,000 | M2 | 550 ₹16,50,000 | 200 ₹6,00,000 Lowest | 225 ₹6,75,000 | 313 ₹9,39,000 | 460 ₹13,80,000 |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
16 Jul 2026, 3:00 pmClosed
AGMCNM
NTPC Tamilnadu Energy Company Limited Vallur Thermal Power Project, Vellivoyal chavadi, Ponneri Taluk, Thiruvallur, Tamil Nadu - 600 103
BIENNIAL MAINTENANCE CONTRACT FOR ASH DYKE AT NTECL VALLUR
2026_NTECL_282008_1
CS6135
Open Tender
Civil Works
Works
730 days
NTECL VALLUR
as per tender documents
8 documents required · 8 mandatory
₹0
₹5 L
27 Aug 2026
25 Jun 2026
17 Jul 2026
25 Jun 2026
16 Jul 2026
3 Jul 2026
25 Jun 2026 - 2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Filling the available good earth in trenches, plinth, sides of foundation, rain cuts, temporary bund, depressions, scouring of bund area etc in layers not exceeding 20cm depth and all lift including carriage of earth/ ash by mechanical transport including loading,unloading and stacking, watering, ramming by hand rammer including all labour, materials, tools and tackles etc complete and as per direction of Engineer ln charge for a lead up to 50 m (soil to be transported from soil stack) | 2,000 | M3 | 0.2 | ₹398 |
| 2 | Carriage of Materials by Mechanical Transport - For a Lead upto 1 Km for Material Earth | 500 | M3 | 0.8 | ₹399.5 |
| 3 | Carriage of Materials by Mechanical Transport - For a Lead upto 2 Km for Material Earth | 500 | M3 | 0.2 | ₹100 |
| 4 | Carriage of Materials by Mechanical Transport - For a Lead upto 3 Km for Material Earth | 500 | M3 | 0.2 | ₹99.5 |
| 5 | Carriage of Materials by Mechanical Transport - For a Lead upto 4 Km for Material Earth | 75 | M3 | 0.8 | ₹60 |
| 6 | Carriage of Materials by Mechanical Transport - For a Lead upto 5 Km for Material Earth | 50 | M3 | 0.4 | ₹20 |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual
means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge (Pond ash may be used for forming roads inside ash dyke so dump deployment has been deducted in DSR rate)-All kinds of soil | 4,000 | M3 | 0.8 | ₹3,200 |
| 8 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. | 40,000 | M2 | - | - |
| 9 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 2,00,000 | M2 | 1 | ₹1,99,800 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size). | 150 | M3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
fqpbmc.pdf
Tender Documents • 1.23 MB
CS6135TDgepnic.pdf
Tender Documents • 2.19 MB
fraudandbanning.pdf
Tender Documents • 0.32 MB
BOQ_329126.xls
BOQ • 0.33 MB
CORRI2.pdf
PDF • 0.24 MB
corrigendum.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].