Loading…
Loading…
Tender Value
₹5.1 L
EMD Value
₹12,800
Closing Date
7 Jun 2026, 9:30 pm2d left
Karnataka Forest Department
Advance work at Bommanahalli Sy.No.15 -5Ha, Bommanahalli Sy.No.18-5Ha -in Mandagadde Range during 2026-27 under CAMPA, Extent 10.00 Ha
302268
KFD/2026-27/OW/WORK_INDENT39111/CALL-3
Open
Other Works
KFD ACF Territorial Sub Division Office Ayanur
4 documents required · 0 mandatory · 4 optional
Upload all documents as per tender documents
₹500
₹12,800
30 May 2026
30 May 2026
8 Jun 2026
6 Jun 2026
MODEL -2 - ANR FOR MALNAD, COASTAL AND TRANSITIONAL ZONES
DATASHEET NO. 25 - ADVANCE WORK DURING 2026-27 (WITH FENCING)
No. of Plants - 400 seedlings 8"x12" Size, pits - 0.60 x 0.60 x0.60 cum Extent : 1 Ha
No. of PBS - 400 + 40 = 440. Espacement: 5m x5m
Sl. No. CSSR Item NO. Particulars of the Work Qnty. Rate Per Amount
1 100(a) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with thick under growth 72 Rmtrs 3,904.09 Km 281.09 25 400
2 Sub Estimate BARBED WIRE FENCING WITH WOODEN POLES 12,300.00
3 29 (b) Aligning in the planting area and marking for pit (without staking) (Aligning of pit in Stagerred design) 400 Pits 580.08 1000 232.03
4 29 (c) (ii) Excavation of pits of size 0.6 Mtr. x 0.6 Mtr. x 0.6 Mtr. with vertically cut edges to make an uniform cube and heaping the excavated soil (1/3rd top soil on the upper side & 2/3rd on the lower side) in Hard Soil. (400 pits x 0.60 cum 1 pit = 86.40 cum) 86.40 Cum. 307.85 1 26,598.24 86.4
5 Sub Estimate Cost of Raising 8" x 12" PB seedling, including 10% Casuality Replacement 440 Seedl. 26.634 1 11,718.96
6 LS / RQ Miscellaneous & rounding off 69.674
Total 51,200.000
Note : Item of Works can be modified by the DCF based on the field requirement with the concurrence of CCFs with in same cost norm.
Principal Chief Conservator of Forests,
(Head of Forest Force), Bengaluru.
MODEL -3 - ANR MODEL FOR DRY ZONES
DATASHEET NO. 29 ADVANCE WORKS(WITH FENCING) DURING 2026-27
No. of Plants - 278 seedlings 10"x16" Size, pits - 0.75 x 0.75 x0.75 cum
No. of PBS - 278 + 28 =306 Espacement: 6m x 6m Extent: 1 Ha.
Sl. No. CSSR Item NO. Particulars of work Qty. Rate Per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 72 Rmtrs. 1,542.78 Km 111.08 36
2 38(i) Excavation of pits by mechanical means of size by 0.75m x 0.75m x 0.75m with vertically cut edges to make a uniform cube and heaping the excavated soil (1/3rd top soil on the upper side & 2/3rd on the lower side) in Ordinary soil (278 pit) 117.28 Pits 155.91 Cum 18,285.32 117.28125 277.777777777778
3 Sub Estimate BARBED WIRE FENCING WITH WOODEN POLES 1 Ha 1 12,300.00
4 Sub Estimate Cost of 10"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 306 Seedl. 61.326 1 18,765.76
5 LS SMC works @ 7% of advance work 1 ha 3,462.35 1 3,462.35
6 LS / RQ Miscellaneous & rounding off. 75.494
Note : 1. Item of Works can be modified by the DCF based on the field requirement with the concurrence of CCFs with in same cost norm.
2. Sl. No. 5 - The SMC works shall be taken up based on the soil conditions, runoff, slope.
Principal Chief Conservator of Forests,
(Head of Forest Force), Bengaluru.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Spill over tender work list 26-27_260530_142142.pdf
Tender Document • 0.40 MB
Notification Call-3.pdf
Tender Document • 1.15 MB
51200.xlsx
Tender Document • 0.02 MB
Download all tender documents and submit your bid