| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L | L1 | Accepted-AOC LER |
| 2 | L2₹1.6 LRejected-Finance | ₹1.6 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | T K CONSTRUCTION L2 | RAMAMOORTHY CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Part 01: Repairs to P.U.E.School Girls Toilet at Medayakollai Habitation in Kilamangalam Panchayat. | |||||
| 2.00 | Dismantling RCC by manual / by using deploying
machineries including cost of steel and binding wire also in all floors etc., complete | 0.18 | Sqm | 4,320 ₹777.60 | 4,308 ₹775.44 |
| 3.00 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. | 2.64 | Sqm | 950 ₹2,508 | 929 ₹2,452.56 |
| 4.00 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 0.02 | MT | 89,890 ₹1,797.80 | 89,883 ₹1,797.66 |
| 5.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works including cost of steel and binding wire also in all floors etc., complete | 0.18 | Cu.m | 9,400 ₹1,692 | 9,374 ₹1,687.32 |
| 6.00 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. | 1.21 | Sqm | 50 ₹60.50 | 33 ₹39.93 |
| 7.00 | Distempering two coats over one coat of primer inculding cost and conveyance of all materials to site and all labour charges etc complete | 4.87 | Sqm | 200 ₹974 | 178 ₹866.86 |
| 8.00 | Painting two coats with Emulsion Paint over the one coat of Priming coat inculding cost and conveyance of all materials to site and all labour charges etc complete | 12.9 | Sqm | 250 ₹3,225 | 231 ₹2,979.90 |
| 9.00 | Painting two coats over New steel Door works using synthetic enamel paint inculding cost and conveyance of materials and all labour charges etc.,complete | 4.8 | Sqm | 150 ₹720 | 138 ₹662.40 |
| 10.00 | Supply and fixing of steel door including inculding cost and conveyance of materials and all labour charges etc.,complete (Door-0.60mx1.40m) | 3 | No's | 1,800 ₹5,400 | 1,794 ₹5,382 |
Tender Value
₹2.0 L
EMD Value
₹2,020
Closing Date
17 Jul 2025, 3:00 pmClosed
Block Development Officer (B.P), Thiruvonam
Panchayat Union Office, Thiruvonam
Part 01 Repairs to PUESchool Girls Toilet at Medayakollai Habitation in Kilamangalam Panchayat Part 02Repairs to PUESchool RCC Two Classroom Building at Medayakollai Habitation in Kilamangalam panchayat Part
2025_RDTN_575510_1
RcNo9052025A2dated27062025
Open Tender
Civil Works
90 days
Panchayat Union Office, Thiruvonam
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹2,020
23 Dec 2025
8 Jul 2025
17 Jul 2025
8 Jul 2025
17 Jul 2025
8 Jul 2025
Amount
Part 01: Repairs to P.U.E.School Girls Toilet at Medayakollai Habitation in Kilamangalam Panchayat.
Dismantling RCC by manual / by using deploying machineries including cost of steel and binding wire also in all floors etc., complete
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works including cost of steel and binding wire also in all floors etc., complete
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Distempering two coats over one coat of primer inculding cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat inculding cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over New steel Door works using synthetic enamel paint inculding cost and conveyance of materials and all labour charges etc.,complete
Supply and fixing of steel door including inculding cost and conveyance of materials and all labour charges etc.,complete (Door-0.60mx1.40m)
Part 02: Repairs to P.U.E.School RCC Two Classroom Building at Medayakollai Habitation in Kilamangalam Panchayat.
Chipping and clean removal of plastered from wall surfacev including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 10 Sqm
Painting the walls with two coats of Exterior Emulsion Paint over one coat of primer as instructed by the department officers including preparation of surface curing
Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Black board Painting two coats using black oxide for Old blackboard including cost and conveyance of paint and all labour charges etc complete
Provision for Electrification
Provision for Light Point (SD 18)
Provision for TubeLight (4.36W)
Provision for Fan Point (SD 18)
Provision for Fan (SD 110)
Provision for Teachers Cubboard
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved
Provision for Chappal rack
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Painting the walls with two coats of Exterior Emulsion Paint over one coat of primer as instructed by the department officers including preparation of surface curing
Supply and providing 20/30 mm tk polished kadappa slab for Lunch box cubboard top, including laying in correct allignment with necessary. cemer morter and black powder etc complete .
Provision for Rain water Harvesting
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supply and filling Materials as per standard and specification etc complete
60mm dia RCC Ring
60mm dia RCC cover
40mm metal
20mm metal
Supplying and fixing PVC Rain water Down fall pipes of following dia meter etc.., complete
Part 03: Repairs to P.U.E.SCHOOL Boys Toilet at Medayakollai Habitation in Kilamangalam Panchayat.
Dismantling RCC by manual / by using deploying machineries including cost of steel and binding wire also in all floors etc., complete
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works including cost of steel and binding wire also in all floors etc., complete
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Distempering two coats over one coat of primer inculding cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat inculding cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over New steel Door works using synthetic enamel paint inculding cost and conveyance of materials and all labour charges etc.,complete
Supply and fixing of steel door including inculding cost and conveyance of materials and all labour charges etc.,complete (Door-0.60mx1.40m)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
T K CONSTRUCTION (BID ID -1403787)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid