Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 LAccepted-Finance | ₹19.2 L | L1 | Accepted-Finance 1 st lowest Amount Quated |
| 2 | L2₹19.4 LRejected-Finance | ₹19.4 L | L2 | Rejected-Finance 2 nd lowest Amount Quated |
| Sl No | Description | Qty | Unit | V Balaji L2 | Kumaran Agency L1 |
|---|---|---|---|---|---|
| 1.00Construction Of New Anganwadi Building in Gunreddy Village @ Palamarathur Panchayat | |||||
| 1.01 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | 39.82 | cu.m | 380 ₹15,131.6 | 369 ₹14,693.58 Lowest |
| 1.02 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 30.03 | cu.m | 350 ₹10,510.5 | 310 ₹9,309.3 Lowest |
| 1.03 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 10.98 | cu.m | 7,122 ₹78,199.56 Lowest | 7,122 ₹78,199.56 Lowest |
| 1.04 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 32.66 | cu.m | 7,277 ₹2,37,666.82 Lowest | 7,277 ₹2,37,666.82 Lowest |
| 1.05 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 20.45 | sq.m | 11,585 ₹2,36,913.25 Lowest | 11,585 ₹2,36,913.25 Lowest |
| 1.06 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 38.76 | sq.m | 737 ₹28,566.12 Lowest | 737 ₹28,566.12 Lowest |
| 1.07 | Column Below Gbeam | 29.77 | sq.m | 737 ₹21,940.49 Lowest | 737 ₹21,940.49 Lowest |
| 1.08 | Lintel bottom Sides Roof & Roof Beam | 79.14 | sq.m | 1,474 ₹1,16,652.36 Lowest | 1,474 ₹1,16,652.36 Lowest |
| 1.09 | Shunshade | 13.01 | cu.m | 1,474 ₹19,176.74 Lowest | 1,474 ₹19,176.74 Lowest |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
3 Aug 2026, 3:00 pmClosed
BDO BP JAWADHU HILLS
BDO BP JAWADHU HILLS
Construction of New Anganwadi building in Nachamalai Village at Palamarathur Panchayat
2026_RDTN_686163_1
Roc. No. A6/1770/2025Dt.29.04.2026003
Open Tender
Civil Works
Item Rate
180 days
Jawadhu hills
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
21 Aug 2026
16 Jul 2026
3 Aug 2026
16 Jul 2026
3 Aug 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction Of New Anganwadi Building in Gunreddy Village @ Palamarathur Panchayat | |||||
| 1.01 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | - | cu.m | - | - |
| 1.02 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | - | cu.m | 100 | - |
| 1.03 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | - | cu.m | 53 | - |
| 1.04 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 1 | cu.m | 10 | ₹9.99 |
| 1.05 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 1 | sq.m | 11 | ₹10.99 |
| 1.06 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 1 | sq.m | 10 | ₹9.99 |
| 1.07 | Column Below Gbeam | 1 | sq.m | - | - |
| 1.08 | Lintel bottom Sides Roof & Roof Beam | - | sq.m | 100 | - |
| 1.09 | Shunshade | 1 | cu.m | 53 | ₹52.95 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.72 MB
BOQ_824819.xls
BOQ • 0.38 MB
BDO.pdf
PDF • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].