| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹1.8 LAdmitted-Finance | +2.00% | ₹1.8 L | H1 | Admitted-Finance |
| 2 | H2₹1.8 L−₹537.37 (0.29%)Admitted-Finance | +1.70% | ₹1.8 L−₹537.37 (0.29%) | H2 | Admitted-Finance |
| 3 | H3₹1.8 L−₹3,761.60 (2.06%)Admitted-Finance | -0.10% | ₹1.8 L−₹3,761.60 (2.06%) | H3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Rejected on request |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.8 L
EMD Value
₹3,600
Closing Date
6 Aug 2026, 4:00 pmClosed
Executive Engineer ED Handwara
Office of Executive Engineer ED Handwara
Shifting of 11kva line within the land of Mohammad Hamza Mir at Kalmoona Block Ramhal under CDF grants in the Juridiction of ED Handwara
2026_PDD_316567_2
e-nit 13 of 2026-27
Open Tender
Electrical Works
Turn-key
90 days
Office of Executive Engineer ED Handwara
Refer to SBD
2 documents required · 2 mandatory
₹200
Office of Executive Engineer ED Handwara
₹3,600
13 Aug 2026
21 Jul 2026
7 Aug 2026
21 Jul 2026
6 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 9 Mtr Long (410-SP-33) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 5 | No. | 18,476 | ₹92,380 |
| 2 | Supply , Carriage upto site , Laying , stringing, tensioning and binding of 50 mm2 ACSR Conductor (Rabbit) , including joints by PG clamps wherever required as per REC standard. | 0.51 | kms | 69,894 | ₹35,645.94 |
| 3 | Cement bottoming of S T Ploes 9Mtrs long in 1:2:4 mix , 0.48 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 5 | No | 3,524 | ₹17,620 |
| 4 | Supply and Painting of poles with one coat of redoxide and two coats of Aluminium paint of standard quality including Marking of Poles | 5 | No | 824 | ₹4,120 |
| 5 | Supply , installation ,testing & commissioning of pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm as per REC standard. | 5 | No | 2,233 | ₹11,165 |
| 6 | Supply & fixing of GI nuts and bolts of sizes | 5 | kgs | 479 | ₹2,395 |
| 7 | Supply , installation ,testing & commissioning of GI “V’ cross-arm (75x40x40x6)mm with Pole Top Bracket including back clamps of 50X8 mm for fixing V-Cross arm and pole top bracket as per REC standard. | 78 | Kgs | 151 | ₹11,778 |
| 8 | Supply , installation ,testing , commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mmas per REC specifications. | 15 | No | 268 | ₹4,020 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Tendernotice_2.pdf
PDF • 1.10 MB
BOQ_1037290.xls
BOQ • 0.38 MB
Corrign.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .