Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹10.6 L−₹6,362.13 (0.60%)Accepted-Finance | ₹10.6 L−₹6,362.13 (0.60%) | H2 | Accepted-Finance LER |
| 2 | H1₹10.6 LRejected-Finance | ₹10.6 L | H1 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | KR CHANDRAN H1 | K Alagappan H2 |
|---|---|---|---|---|---|
| 1.00Name of the work: Strengthening The Sali Road in O.Siruvayal KM 0/0 - 0/365 (R502) | |||||
| 2.00 | Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 394.2 | SQM | 7 ₹2,759.4 | 5.5 ₹2,168.1 Lowest |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 131.4 | CUM | 132 ₹17,344.8 | 131.2 ₹17,239.68 Lowest |
| 4.00 | Existing BT surface Picking including cost and conveyance of all albour charges etc complete | 369.43 | m2 | 23 ₹8,496.89 | 21.8 ₹8,053.57 Lowest |
| 5.00 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | 21.9 | CUM | 806 ₹17,651.4 | 805.4 ₹17,638.26 Lowest |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 | 166.25 | CUM | 2,464 ₹4,09,640 | 2,462.5 ₹4,09,390.62 Lowest |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it. | 1,108.3 | SQM | 83 ₹91,988.9 | 81.5 ₹90,326.45 Lowest |
| 8.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,108.3 | SQM | 20 ₹22,166 | 19.2 ₹21,279.36 Lowest |
| 9.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09cum of 11.20mm IRC HBG machine crushed chips with 14.60kg of bitumen for 10sqm | 1,108.3 | m3 | 299 ₹3,31,381.7 | 297.7 ₹3,29,940.91 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,62,257 ₹1,62,257 | 1,61,287 ₹1,61,287 Lowest |
Tender Value
₹10.8 L
EMD Value
₹10,750
Closing Date
25 Jun 2025, 3:00 pmClosed
The Block Development Officer (VP)
Sakkottai
Strengthening The Sali Road in O.Siruvayal KM 0/0 - 0/365 (R502)
2025_RDTN_571598_1
SKT/Iyothee/25-26/BT/siruvayal
Open Tender
Civil Works - Roads
Item Rate
180 days
Sakkottai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,750
19 Nov 2025
20 Jun 2025
25 Jun 2025
20 Jun 2025
25 Jun 2025
20 Jun 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_682857.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .