Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹0.40Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L1₹0.40Accepted-AOC | L1 | Accepted-AOC L1 | |
| 3 | L1₹0.40Accepted-AOC | L1 | Accepted-AOC L1 | |
| 4 | L1₹0.40Accepted-AOC | L1 | Accepted-AOC L1 | |
| 5 | L1₹0.40Accepted-AOC PLOT NO 3 FIRST FLOOR SARHAUL OPP HIPA SECTOR 18 GURUGRAM 122001 HARYANA | GURUGRAM | GURUGRAM | HARYANA | 122001 | L1 | Accepted-AOC L1 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
27 Aug 2019, 5:00 pmClosed
Executive Engineer-I, W/S Division GMDA
Executive Engineer-I, W/S Division GMDA, Plot No.44, Sector-32, Gurugram.
Empanelment of Consultants with Gurugram Metropolitan Development Authority for the purpose of planning, designing and submission of DPR w.r.t Infrastructure Development i.e. water Supply, Storm Water Drainage Works etc
2019_HRY_90598_2
Job No.29/W/S Division/ GMDA
Open Tender
Civil Works
Works
365 days
Gurugram
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
GMDA
₹10,000
Yes
11 Mar 2020
5 Aug 2019
28 Aug 2019
5 Aug 2019
27 Aug 2019
5 Aug 2019
Amount
A) PROJECTS WITH ESTIMATE COST UPTO 10 CR
Water supply scheme including planning & designing of water supply distribution system, construction of OHSR, UGR and canal based water supply including pumping machinery complete in all respects. (Note:- Rate be quoted as % of total estimate cost e.g if 0.5 % of the total estimate cost , so rate be entered 0.5)
Design of sewerage scheme including its final disposal. (Note:-Rate be quoted as % of total estimate cost e.g if 0.5 % of the total estimate cost, so rate be entered 0.5)
Design of CETP/STP including provision of recycling of treated water in the area, green belts and to the industries for the use of washing, cooling and boilers etc . (Note:- Rate be quoted as % of total estimate cost e.g if 0.5 % of the total estimate cost, so rate be entered 0.5)
Design of Storm Water drainage scheme with provision of underground pipe network / open channel including its disposal. (Note:- Rate be quoted as % of total estimate cost e.g if 0.5 % of the total estimate cost, so rate be entered 0.5)
Design of rain harvesting system through development of water body of injection wells or any new technologies available in the industry. (Note:- Rate be quoted as % of total estimate cost e.g if 0.5 % of the total estimate cost, so rate be entered 0.5)
Rejuvenation works such as pond regeneration including its planning complete in all respect. (Note:- Rate be quoted as % of total estimate cost e.g if 0.5 % of the total estimate cost, so rate be entered 0.5)
A) PROJECTS WITH ESTIMATE COST UPTO 10 CR
Water supply scheme including planning & designing of water supply distribution system, construction of OHSR, UGR and canal based water supply including pumping machinery complete in all respects. (Note:- Rate be quoted as % of total estimate cost e.g if 0.5 % of the total estimate cost , so rate be entered 0.5)
Design of sewerage scheme including its final disposal. (Note:-Rate be quoted as % of total estimate cost e.g if 0.5 % of the total estimate cost, so rate be entered 0.5)
Design of CETP/STP including provision of recycling of treated water in the area, green belts and to the industries for the use of washing, cooling and boilers etc . (Note:- Rate be quoted as % of total estimate cost e.g if 0.5 % of the total estimate cost, so rate be entered 0.5)
Design of Storm Water drainage scheme with provision of underground pipe network / open channel including its disposal. (Note:- Rate be quoted as % of total estimate cost e.g if 0.5 % of the total estimate cost, so rate be entered 0.5)
Design of rain harvesting system through development of water body of injection wells or any new technologies available in the industry. (Note:- Rate be quoted as % of total estimate cost e.g if 0.5 % of the total estimate cost, so rate be entered 0.5)
Rejuvenation works such as pond regeneration including its planning complete in all respect. (Note:- Rate be quoted as % of total estimate cost e.g if 0.5 % of the total estimate cost, so rate be entered 0.5)
XPLORER CONSULTANCY SERVICES PVT LTD
Manav Consultant and constructions
saaksh degitech services private limited
GSI Planning and Management
G-Eng Advisory Services Pvt ltd
Suncon Engineers Private Limited
SMS Envocare Limited
Infrastructure Development Corporation (Karnataka) Limited (iDeCK)
wapcos limited
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .