Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.4 LAccepted-AOC | 1 | Accepted-AOC final | |
| 2 | 2₹24.4 L+₹2,162.45 (0.09%)Rejected-Finance | 2 | Rejected-Finance QUOTED AMOUNT ABOVE THE TENDER | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-this GHANA ENGINEERS AND INFRA PRIVATE LIMITED other state llimited |
| Sl No | Description | Qty | Unit | N.MUTHUKUTTI L1 | N Chadrasekar L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete. | 172.57 | cum | 263.75 ₹45,515.34 Lowest | 265 ₹45,731.05 |
| 2.00 | Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete. | 44.89 | cum | 5,644.7 ₹2,53,390.58 Lowest | 5,646 ₹2,53,448.94 |
| 3.00 | For Shuttering - Below Sill Level | 114.21 | sqm | 547.5 ₹62,529.98 Lowest | 548 ₹62,587.08 |
| 4.00 | For Shuttering - Above Sill Level | 230.52 | sqm | 547.4 ₹1,26,186.65 Lowest | 548 ₹1,26,324.96 |
| 5.00 | For Deck Slab Centering | 102.04 | sqm | 1,095 ₹1,11,733.8 Lowest | 1,098 ₹1,12,039.92 |
| 6.00 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 161.26 | cum | 5,914.5 ₹9,53,772.27 Lowest | 5,918 ₹9,54,336.68 |
| 7.00 | Rein forced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 48.15 | cum | 9,255.5 ₹4,45,652.33 Lowest | 9,258 ₹4,45,772.7 |
| 8.00 | Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification. | 4,291.5 | kg | 91.85 ₹3,94,174.28 Lowest | 92 ₹3,94,818 |
| 9.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 6.43 | cum | 6,935.5 ₹44,595.27 Lowest | 6,938 ₹44,611.34 |
| 10.00 | Supplying and filling with excavated earth including all cost and conveyance and all labour charges for watering, ramming etc., complete. | 84.56 | cum | 45.5 ₹3,847.48 Lowest | 46 ₹3,889.76 |
Tender Value
₹29.3 L
EMD Value
₹29,250
Closing Date
25 Feb 2026, 4:00 pmClosed
persistent, Brammadesam Village Panchayat
persistent, Brammadesam Village Panchayat
Construction of Minor Bridge at Nathiunni kalvai Keela street in Brammadesam Panchayat of Ambasamudram panchayat union.
2026_RDTN_662272_2
B3/1675/2025 BDM
Open Tender
Civil Works
Works
Brammadesam Panchayat Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹29,250
Yes
28 Sept 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete. | 172.57 | cum | - | - |
| 2 | Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete. | 44.89 | cum | - | - |
| 3 | For Shuttering - Below Sill Level | 114.21 | sqm | - | - |
| 4 | For Shuttering - Above Sill Level | 230.52 | sqm | - | - |
| 5 | For Deck Slab Centering | 102.04 | sqm | - | - |
| 6 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 161.26 | cum | - | - |
| 7 | Rein forced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 48.15 | cum | - | - |
| 8 | Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification. | 4,291.5 | kg | - | - |
| 9 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 6.43 | cum | - | - |
| 10 | Supplying and filling with excavated earth including all cost and conveyance and all labour charges for watering, ramming etc., complete. | 84.56 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_795099.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_795099.xls
BOQ • 0.32 MB
bpt.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .