Tender Value
₹37.5 L
EMD Value
₹75,000
Closing Date
18 Jan 2021, 4:00 pmClosed
ER. JOGINDER PAUL
The Executive Engineer, J and K, Sports Council, Const. Division Jammu.
Completion of Boxing Ring by way of construction of wall, Chainlink Fencing, Constt. of drain and left over nallah in Sports Stadium at poonch.
2021_SPORT_113292_7
E-26/26 OF 2020-21 Dt. 08-01-2021.
Open Tender
Civil Works
Item Rate
90 days
POONCH
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,100
Yes
Executive Engineer, JK State Sports Council
₹75,000
Yes
Executive Engineer, JK Sports Council Jammu
9 Feb 2021
8 Jan 2021
19 Jan 2021
8 Jan 2021
18 Jan 2021
9 Jan 2021
16 Jan 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil including disposal.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all lead lift and carraige complete
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including all lead lift and carraige complete
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)including all lead lift and carraige complete
Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc.
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for Lintel, beams, plinth beams, girders, bressumers and cantilevers.
Centering and shuttering including strutting, propping etc. and removal of form work for pended floors, roofs, landings, balconies and access platforms
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete including all lead lift and carraige complete
Edges of slabs and breaks in floors and walls Under 20 cm wide
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:4 ( 1 cement : 4 coarse sand) including all lead lift and carraige complete
Structural steel work Welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On steel work
Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6mm, with 40mm dia, steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer
15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 fine sand) including all lead lift and carraige complete
Finishing walls with acrylic smooth exterior paint of required shade on New work (Two or more coats applied @ 1.67 liter/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge made of G.I. wire of dia 4 mm
Clearance of existing nallah bed in soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.
Note :- 1) Any Tropical error shall be consider as per sanction schedule of rates/ estimates.
Mohd Bashir
GHULAM NABI MIR
Abhinav Sudan
ZAFFAR JAVAID
M/S NISAR AND CO.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .