Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | ₹24.4 L Quoted ₹27.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹32.8 LRejected-AOC 4 94 M ETTAYAPURAM ROAD TUTICORIN 628002 | TUTICORIN | TAMIL NADU | 628002 | ₹32.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | VEL ENGINEERING L1 | SRINITHI ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Cost of M.S Angle 75 X 75 X 8 mm | 10,680 | Kg. | 8,01,000 ₹9.5 L | 9,07,800 ₹10.7 L |
| 2.00 | Cost of M.S Channel 125 X 65 | 3,425 | Kg. | 2,56,875 ₹3.0 L | 2,91,125 ₹3.4 L |
| 3.00 | Cost of M.S plate 12 mm thick | 2,826 | Kg. | 2,11,950 ₹2.5 L | 2,40,210 ₹2.8 L |
| 4.00 | Cost of M 20 X 90 mm full thread HT bolt with nut washer grade 10.9 | 500 | No. | 75,000 ₹88,500 | 80,000 ₹94,400 |
| 5.00 | Charges for temporary supports of top column for replacement of wornout side portion of brazing iron and steel structure (39 mtr level to 49 mtr level) | 30 | Column | 4,76,700 ₹5.6 L | 4,99,500 ₹5.9 L |
| 6.00 | Charges for dismantling the existing worn-out side portion of brazing iron and steel structure (39 mtr. level to 49 mtr. level) by the use gas cutting and transportation to stores for devolution. | 10,000 | Kg. | 1,20,000 ₹1.4 L | 2,00,000 ₹2.4 L |
| 7.00 | Charges for erection of new brazing iron and steel structure (39 mtr. level to 49 mtr. level), after dismantling existing corroded portion of brazing structure which works involves cutting, leading, lifting of materials from ground floor to top floor of secondary crusher house -I | 16,931 | Kg. | 7,11,102 ₹8.4 L | 9,31,205 ₹11.0 L |
| 8.00 | Charges for painting one coat of red oxide paint and two coats of smoke grey enamel paint in newly erected brazing iron and steel structure (39 mtr. level to 49 mtr. level) including cost of paint and other consumables etc, at secondary crusher house-I | 515 | Sq.mtr. | 1,18,450 ₹1.4 L | 1,26,175 ₹1.5 L |
Tender Value
Refer Docs
EMD Value
₹22,100
Closing Date
17 Dec 2025, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-I- Replacement of worn out portion of side brazing iron and steel structure (39 mtr. Level to 49 mtr. Level) by a new one and painting of newly erected brazing iron and steel structure at Secondary Crusher
2025_EB_628107_1
CE/TTPS/SE/MI/183/2025-2026
Open Tender
Miscellaneous Works
90 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,100
Yes
26 Mar 2026
2 Dec 2025
18 Dec 2025
2 Dec 2025
17 Dec 2025
2 Dec 2025
Cost of M.S Angle 75 X 75 X 8 mm
Cost of M.S Channel 125 X 65
Cost of M.S plate 12 mm thick
Cost of M 20 X 90 mm full thread HT bolt with nut washer grade 10.9
Charges for temporary supports of top column for replacement of wornout side portion of brazing iron and steel structure (39 mtr level to 49 mtr level)
Charges for dismantling the existing worn-out side portion of brazing iron and steel structure (39 mtr. level to 49 mtr. level) by the use gas cutting and transportation to stores for devolution.
Charges for erection of new brazing iron and steel structure (39 mtr. level to 49 mtr. level), after dismantling existing corroded portion of brazing structure which works involves cutting, leading, lifting of materials from ground floor to top floor of secondary crusher house -I
Charges for painting one coat of red oxide paint and two coats of smoke grey enamel paint in newly erected brazing iron and steel structure (39 mtr. level to 49 mtr. level) including cost of paint and other consumables etc, at secondary crusher house-I
SRINITHI ENGINEERING WORKS (BID ID -1536368)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_750952.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid