| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-Finance | 1 | Accepted-Finance found eligible | |
| 2 | 2₹3.3 L+₹27,200 (8.89%)Accepted-Finance BHAGWATI NAGAR JAMMU | 2 | Accepted-Finance found eligible | |
| 3 | 3₹3.6 L+₹56,600 (18.5%)Accepted-Finance BHAGWATI NAGAR JAMMU | 3 | Accepted-Finance found eligible |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
10 Mar 2021, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowshera
Fabrication/Installation ,testing and commissioning of various components of mechanical regulatory gates with allied works at New Pratap canal,Garkhal canal and Pargwal canal.
2021_IFC_119104_1
131/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
8 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor/Nowshera
₹8,000
Yes
Office of the Executive Engineer MID Akhnoor/Nowsh
13 Mar 2021
3 Mar 2021
10 Mar 2021
3 Mar 2021
10 Mar 2021
3 Mar 2021
5 Mar 2021
Replacement by way of Providing / fitting and installation of new winch machine complete with stem rod, cover, rain pipe and base plate - (3ton capacity ) . The job involves extraction of damaged winch machine by using skilled/unskilled labour and suitable tools and tackles. , shifting of the new material to be fitted to the site of installation followed by fitment of the winch machine on the hoistings, lowering of the stem rod, fastening and aligning it with the gate for smooth uni-axial vertical up and down travel and testing the complete system.The job includes cleaning of the newly provided winch assembly and gate structure with emery paper followed by application of one coat of red oxide primer and two coats of paint and also greasing work. The job covers the cost of hire charges of tools ,tackles, welding rods, labour charges, fabrication charges, cost of material,to& fro carriage charges etc. DO 22500 ,DO 32700, DO 35000, DO 40000, DO 44000, DO 56000 , Mattoo – I & Mattoo-III of D-7 .
Strengthening of Escape of D-7 on installed at NPC by way of dismantling it from its hoisitngs and extraction of gate using chain pulley block, tripod and manual labour from the embodiment blocks. The job involves strengthening to leaf by patch welding of new MS sheet 6 mm thick, assembly of the gate at site . Shifting of the material to site, followed by lowering of gate structure in the embodiments, fitment of the winch machine on the hoisting, lowering of the stem rod, fastening and aligning it with the gate for smooth uni-axial vertical up and down travel and testing the complete system. The job includes cleaning of the winch assembly and gate structure with emery paper followed by application of one coat of red oxide primer and two coats of paint and also greasing work.The job covers the cost of hire charges of tools, tackles, welding rod, gas & oxygen cylinder, labour charges, fabrication charges, cost of material, to& fro carriage charges etc.
Strengthening of DO 53400 on installed at NPC by way of dismantling it from its hoisitngs and extraction of gate using chain pulley block, tripod and manual labour from the embodiment blocks. The job involves strengthening to leaf by patch welding of new MS sheet 6 mm thick, assembly of the gate at site . Shifting of the material to site, followed by lowering of gate structure in the embodiments, fitment of the winch machine on the hoisting, lowering of the stem rod, fastening and aligning it with the gate for smooth uni-axial vertical up and down travel and testing the complete system. The job includes cleaning of the winch assembly and gate structure with emery paper followed by application of one coat of red oxide primer and two coats of paint and also greasing work.The job covers the cost of hire charges of tools, tackles, welding rod, gas & oxygen cylinder, labour charges, fabrication charges, cost of material, to& fro carriage charges etc.
Strengthening of gate installed at NPC by way of dismantling it from its hoisitngs and extraction of gate using chain pulley block, tripod and manual labour from the embodiment blocks. Replacement by way of Providing / fitting and installation of new winch machine complete with stem rod, cover, rain pipe and base plate - (3ton capacity ) . Strengthening of the the gate leaf and peripheral angular sections by welding of broken ends and removal of bends/dents on the leaf surface. Assembly of the gate at site Shifting of the material to site, followed by lowering of gate structure in the embodiments, fitment of the winch machine on the hoisting, lowering of the stem rod, fastening and aligning it with the gate for smooth uni-axial vertical up and down travel and testing the complete system. The job includes cleaning of the winch assembly and gate structure with emery paper followed by application of one coat of red oxide primer and two coats of paint and also greasing work.The job covers the cost of hire charges of tools, tackles, welding rod, gas & oxygen cylinder, labour charges, fabrication charges, cost of material, to& fro carriage charges etc. Sainth minor gate , chack rama gate , D – 8 , D -11 Complete Job
BEE AAR ENTERPRISES
PERFECT ELECTRICAL WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .