| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹53.1 L+₹20,814.36 (0.39%)Admitted-Finance RUPCHANDPUR MIRSHADPUR BADLAPUR JAUNPUR | JAUNPUR | UTTAR PRADESH | L2 | Admitted-Finance | |
| 3 | L3₹54.0 L+₹1.1 L (2.09%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | - | Rejected-Technical ENCLOSED | |
| 5 | Rejected-Technical 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | - | Rejected-Technical ENCLOSED |
| Sl No | Description | Qty | Unit | NAGENDRA PRATAP SINGH L2 | BALENDRA SINGH L1 | M/S Krishna Associate L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling bituminous road manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge | 216 | M2 | 40 ₹8,640 Lowest | 40 ₹8,640 Lowest | 167.9 ₹36,266.4 |
| 2.00 | Dry Earth work in foundation of masonry work on channels of discharge above 10 cumecs including all lead & lift including disposal and back filling with all cost of labour and T&P etc. | 1,042.63 | M3 | 80 ₹83,410.32 Lowest | 80 ₹83,410.32 Lowest | 85.37 ₹89,009.24 |
| 3.00 | Providing and Laying Plain Cement Concrete (M15 A20) 1:2:4 with stone grit in foundation including cost of material, labour, T&p etc, complete. | 37.08 | M3 | 9,500 ₹3,52,212.5 | 9,200 ₹3,41,090 | 8,579.13 ₹3,18,071.24 Lowest |
| 4.00 | Providing and Laying Plain Cement Concrete (M20 A20) 1:1.5:3 with stone grit curtain wall including cost of material, labour, T&p etc, complete. | 57.15 | M3 | 10,500 ₹6,00,075 | 10,500 ₹6,00,075 | 9,100.86 ₹5,20,114.15 Lowest |
| 5.00 | Providing and Laying Plain Cement Concrete (M25 A20) 1:1:2 with stone grit curtain wall including cost of material, labour, T&p etc, complete. | 131.37 | M3 | 10,500 ₹13,79,332.5 | 10,500 ₹13,79,332.5 | 10,445.98 ₹13,72,236.16 Lowest |
| 6.00 | Bending, Binding, Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work. | 9.63 | MT | 6,500 ₹62,582 | 6,000 ₹57,768 Lowest | 57,242.31 ₹5,51,128.96 |
| 7.00 | Centring and shuttering For C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2. | 22.79 | M2 | 705 ₹16,067.66 | 700 ₹15,953.7 | 466.71 ₹10,636.79 Lowest |
| 8.00 | Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2. | 556.52 | M2 | 705 ₹3,92,348.72 | 700 ₹3,89,566.1 | 591.92 ₹3,29,417.09 Lowest |
| 9.00 | Brick masonry in 1:4 Cement and sand mortar using class 150 bricks complete in all respect including all leads, lifts, all cost of material, labour and T&P etc. required for porper completion of the work. | 3.55 | M3 | 5,500 ₹19,525 | 5,000 ₹17,750 Lowest | 6,441.94 ₹22,868.89 |
| 10.00 | 15 mm Cement Plaster in 1:3 cement mortar including all cost of material, labour, T&P etc complete. | 22.46 | M2 | 205 ₹4,603.48 | 200 ₹4,491.2 | 178.24 ₹4,002.56 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
6 Feb 2021, 3:00 pmClosed
SE, QUALITY CONTROL CIRCLE, AYODHYA
SUPERINTENDING ENGINEER, QUALITY CONTROL CIRCLE, AYODHYA
Construction of Box Culvert at Km. 4.400 of Ramwapur Minor (LOT-01)
2021_UPIDC_549641_1
04/SE/2020-21
Open Tender
Civil Works - Canal
Lump-sum
45 days
BASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹1.1 L
Yes
15 Sept 2021
28 Jan 2021
6 Feb 2021
28 Jan 2021
6 Feb 2021
28 Jan 2021
Amount
Dismantling bituminous road manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge
Dry Earth work in foundation of masonry work on channels of discharge above 10 cumecs including all lead & lift including disposal and back filling with all cost of labour and T&P etc.
Providing and Laying Plain Cement Concrete (M15 A20) 1:2:4 with stone grit in foundation including cost of material, labour, T&p etc, complete.
Providing and Laying Plain Cement Concrete (M20 A20) 1:1.5:3 with stone grit curtain wall including cost of material, labour, T&p etc, complete.
Providing and Laying Plain Cement Concrete (M25 A20) 1:1:2 with stone grit curtain wall including cost of material, labour, T&p etc, complete.
Bending, Binding, Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work.
Centring and shuttering For C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2.
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2.
Brick masonry in 1:4 Cement and sand mortar using class 150 bricks complete in all respect including all leads, lifts, all cost of material, labour and T&P etc. required for porper completion of the work.
15 mm Cement Plaster in 1:3 cement mortar including all cost of material, labour, T&P etc complete.
Cement washing with portland cement slurry three coat over new surface including cost of all material labour T&P etc required for peoper completion of work.
B.O.E. Soling on approaches with sand blinding after surface preparation and its ramming complete in all respect including all cost of labour and T&P etc.
Providing and Laying stone Boulder in toe of bund and apron with all lead and lift including all cast of labour & T&P etc. required for proper complete in all respect.
Providing & Fixing 75mm dia PVC drainage spout complete in all respect including cost of all material, labour and T&P etc.
Providing and Placing 20mm thick joint filler board with all cost of material, labour and T&P etc. complete
Earth work in filling with all lead and lift including excavation, loading, unloading, manual compaction and dressing to profile etc. complete in all respect.
P/F sign board including all cost of labour and T&P etc. complete in all respect
Making temporary hutment (6.00MX4.00M) size including all cost of labour and T&P etc. complete in all respect
Construction of granular sub-base by providing Well graded material Grading-1, spreading in layers with motor grader on preparer surface, mixing by mix in place method with rotavor at OMC and compacting with Smooyh wheel roller to achieve the desired density, complete as per technical clause 401.
Providing, laying, spreading and compacting stone aggregates of 45-63 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 Km. in stages to proper grade and camber, akklying and brooming Stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.
Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 Km. in stages to proper grade and camber, akklying and brooming Stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405.
Brick edging 7 cm wide on both sides of the road by S.O. Bricks complete as per PWD detailes Specification no 20.15
NAGENDRA PRATAP SINGH
M/S Krishna Associate
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .