Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance | ₹5.3 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical STATION ROAD KHALARI PO PS KHALARI DIST RANCHI 829205 | KHALARI | RANCHI | JHARKHAND | 829205 | - | - | Rejected-Technical Disqualified due to Non-compliance of Confirmatory Documents as per NIT. |
| 3 | Rejected-Technical AT MAIN ROAD DAKRA KHALARI DIST RANCHI JHARKHAND PIN 829210 | RANCHI | JHARKHAND | 829210 | - | - | Rejected-Technical Disqualified due to Non-compliance of Confirmatory Documents as per NIT. |
| Sl No | Description | Qty | Unit | MINTA ELECTRICALS L1 |
|---|---|---|---|---|
| 1.00 | Part A- (500KVA T/F) Cost of copper wire 8 S WG size Less scrap value 60% of item no -01 (1278.40 Orignal - 767.04 60% less) | 350 | Kg | 540 ₹1,89,000 Lowest |
| 2.00 | Cost of insulating material ( 15 % of
litem No. 1.) | 1 | Job | 70,875 ₹70,875 Lowest |
| 3.00 | Labour Charge (15 % of item No.1) | 1 | Job | 70,875 ₹70,875 Lowest |
| 4.00 | Cork sheet ( 8mm) | 1 | Each | 5,000 ₹5,000 Lowest |
| 5.00 | Part B (750KV T/F) Cost of copper wire 8SWG size Less scrap value 60% of item no -01 (1278.40 Orignal - 767.04 60% less) | 175 | Kg | 540 ₹94,500 Lowest |
| 6.00 | Cost of insulating material ( 15 % of item no. 1) | 1 | Job | 35,437.5 ₹35,437.5 Lowest |
| 7.00 | Labour Charge ( 15% of item No. 1) | 1 | Job | 35,437.5 ₹35,437.5 Lowest |
| 8.00 | Cork sheet (8mm) | 2 | Each | 5,000 ₹10,000 Lowest |
| 9.00 | Bushing LT side | 2 | Each | 8,000 ₹16,000 Lowest |
| 10.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
₹5.9 L
EMD Value
₹7,400
Closing Date
1 Apr 2026, 9:00 amClosed
Project Engineer (EnM), Ashok
Ashok OCP, Piparwar Area Chatra, Jharkhand-829201
Complete repairing/rewinding of 500 KVA 3.3 KV/440V transformer Sl No-45016 installed at Barwatola RR Site and (2) Part repairing of 750 KVA transformer 3.3kv/440 V installed at PLR Camp Site under Ashok OCP Piparwar Area.
2026_CCL_357295_1
PO(AK)/PE(EnM)/e-NIT/25-26/55
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Ashok OCP, Piparwar Area Chatra, Jharkhand-829201
2 documents required · 2 mandatory
₹7,400
28 Apr 2026
21 Mar 2026
2 Apr 2026
22 Mar 2026
1 Apr 2026
22 Mar 2026
22 Mar 2026 - 29 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A- (500KVA T/F) Cost of copper wire 8 S WG size Less scrap value 60% of item no -01 (1278.40 Orignal - 767.04 60% less) | 350 | Kg | - | - |
| 2 | Cost of insulating material ( 15 % of
litem No. 1.) | 1 | Job | - | - |
| 3 | Labour Charge (15 % of item No.1) | 1 | Job | - | - |
| 4 | Cork sheet ( 8mm) | 1 | Each | - | - |
| 5 | Part B (750KV T/F) Cost of copper wire 8SWG size Less scrap value 60% of item no -01 (1278.40 Orignal - 767.04 60% less) | 175 | Kg | - | - |
| 6 | Cost of insulating material ( 15 % of item no. 1) | 1 | Job | - | - |
| 7 | Labour Charge ( 15% of item No. 1) | 1 | Job | - | - |
| 8 | Cork sheet (8mm) | 2 | Each | - | - |
| 9 | Bushing LT side | 2 | Each | - | - |
| 10Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
BOQ_370152.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .