Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-Finance | L1 | Accepted-Finance Lowest Bidder | |
| 2 | L2₹4.0 L+₹14,402.51 (3.77%)Rejected-Finance | L2 | Rejected-Finance Higher Bid | |
| 3 | L3₹4.0 L+₹14,596.62 (3.82%)Rejected-Finance HOCKERS MARKET STALL NO 3 STATION CHOWPATHI DIST COOCH BEHAR PIN CODE 736101 | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736101 | L3 | Rejected-Finance Higher Bid | |
| 4 | Rejected-Technical NETAJI ROAD PO DIST ALIPURDUAR | ALIPURDUAR | ALIPURDUAR | WEST BENGAL | 736121 | - | Rejected-Technical Required documents not submitted |
Tender Value
₹3.9 L
EMD Value
₹7,764
Closing Date
14 Nov 2026, 3:50 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
A.E., Cob. Hwy. Sub Divn III
OFFICE OF THE ASSISTANT ENGINEER COOCH BEHAR HIGHWAY SUB-DIVISION-III, COOCH BEHAR
Mending of embankment and shoulder damages due to heavy rainfall at different stretches from Ch. 8.00 km to 10.36 km of Pundibari-Baneswar Road under Coochbehar Highway Division in the district of Cooch Behar.
2026_WBPWD_5085234_3
NIT06/AE/CHSD-III/2026-27/PWRD
Open Tender
CIVIL WORKS
Percentage
10 days
Cooch Behar
Please refer Tender documents.
5 documents required · 5 mandatory
₹7,764
Yes
23 Nov 2026
7 Nov 2026
16 Nov 2026
7 Nov 2026
14 Nov 2026
7 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness.(Reference to Morth & H's specification clause 201) By Manual Means in area of light jungle | 0.28 | hect | 87,607.46 | ₹24,792.91 |
| 2 | Construction of Embankment with Material obtained from Borrow pits, Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).Compensation for earth will vary from place to place and will have to be assessed realistically as per particular ground situation. In case earth is available from Govt. land, compensation for earth i.e. 43.00/m3 to be deducted from the Rate in Col. 4. The position is required to be clearly stated in the cost estimate.From borrowpit | 472 | cum | 168.17 | ₹79,376.24 |
| 3 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer or by suitable implements handled manually to restore the original alignment, levels & slopes as per the requirement of Morth&H's specification 3002. | 708 | cum | 140.54 | ₹99,502.32 |
| 4 | Maintenance of Earthen shoulder (filling with fresh soil), Making up irregularities/loss of materials on shoulders to the design level by adding fresh approved selected soil and compacting with appropriate equipment as per the requirement of MORTH&H's pecification 3003. | 1,416 | sqm | 47.78 | ₹67,656.48 |
| 5 | By Mix in Place Method
Construction of granular sub-base by providing graded materials such as natural sand/crushed gravel/crushed stone/combination depending upon the required grading , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator and compacting with vibratory roller to achieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8), complete as per clause 401 desired density, complete as per clause 401.with Rate per cum for grading-III Material | 42.48 | cum | 1,357.41 | ₹57,662.78 |
| 6 | Total =A | - | % | 18 | - |
| 7 | Add GST @18% on A=(B) | - | % | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 2.22 MB
BOQ_5208123.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .