Loading…
Loading…
Tender Value
₹15.0 L
EMD Value
₹44,959
Closing Date
2 Oct 2026, 2:00 pm5d left
DFO kamraj Forest Div Zangli Kupwara
Office of the DFO kamraj Forest Div Zangli Kupwara
Additional work including paneling for newly constructed DFO Residence at Zangli Kupwara under UT CAPEX Budget 2026-27
2026_FD_325237_1
e-NIT No. 02 of 2026-27 Dated 18.09.2026
Open Tender
Civil Works
Item Rate
90 days
DFO Residence at Zangli
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Govt. treasury under Major Head 0406/Forest
₹44,959
Yes
19 Sept 2026
19 Sept 2026
3 Oct 2026
19 Sept 2026
2 Oct 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In cement mortar by using machine cut for door entry. | 2.13 | sqm | 1,740.45 | ₹3,707.16 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) | 2.04 | cum | 1,725.2 | ₹3,519.41 |
| 3 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 meters lead :Of area beyond 3 sqm. | 2 | cum | 145.75 | ₹291.5 |
| 4 | Dismantling wood work in frames, trusses, purlins and rafters upto 10 meters span and 5 meters height including stacking the material within 50 meters lead :Of sectional area 40 sqcm. and above. | 0.11 | cum | 3,488.65 | ₹383.75 |
| 5 | P/L of stone soling incl. ramming,hand packing and all carriages, complete job in room fill,trenches,foundation etc. | 0.58 | cum | 900 | ₹522 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Mud mat | 0.3 | cum | 5,202.9 | ₹1,560.87 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1.75 | cum | 6,591.25 | ₹11,534.69 |
| 8 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand) Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 2.35 | cum | 9,333.05 | ₹21,932.67 |
| 9 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Kd or equivalent | 0.24 | cum | 58,000 | ₹13,920 |
| 10 | Providing and fixing glazed shutters for doors, windows and clerestory windows using 4mm thick float glass panes including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws.KD Wood or Equivalent.35mm | 3.32 | sqm | 2,300 | ₹7,636 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_1098560.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .