Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.7 LAccepted-AOC 3 IBRAHIM ROAD KHIDDERPORE KOLKATA 700023 | KOLKATA | WEST BENGAL | 700023 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹38.5 L+₹2.9 L (8.03%)Rejected-Finance | L2 | Rejected-Finance Being higher bid value | |
| 3 | L3₹40.5 L+₹4.8 L (13.6%)Rejected-Finance B 20 H 1 PANCHANANTALLA ROAD KOLKATA 700029 | KOLKATA | WEST BENGAL | 700029 | L3 | Rejected-Finance Being higher bid value | |
| 4 | L4₹41.4 L+₹5.7 L (16.0%)Rejected-Finance | L4 | Rejected-Finance Being higher bid value | |
| 5 | L5₹42.2 L+₹6.5 L (18.3%)Rejected-Finance 107 1F TOLLYGUNGE ROAD KOLKATA 700026 WB | KOLKATA | WEST BENGAL | 700026 | L5 | Rejected-Finance Being higher bid value |
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
29 Oct 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE ALIPORE KOLKATA
NO 1 NATIONAL LIBRARY AVENUE, ALIPORE, KOLKATA 700027
8987/E8
2021_MES_476126_2
GE/ALP (8987) OF KOLKATA 2021-22
Open Tender
Civil Works
Item Rate
334 days
GE ALIPORE KOLKATA
Class D and Category a (i)
8 documents required · 8 mandatory
₹500
GARRISON ENGINEER ALIPORE
₹72,000
Yes
12 Nov 2021
8 Oct 2021
30 Oct 2021
8 Oct 2021
29 Oct 2021
22 Oct 2021
60 days
Amount
Material and labour for one coat of white wash on old decorated surface of wall including preparation of surfaces and necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg).
All as per item No-1 above but on ceiling complete all as specified and directed
Material and labour for one coat of acrylic distemper (white or coloured as per site requirement) on old decorated surface of internal walls including preparation of surfaces and necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg). Note : No separate payment shall be made for colour of distemper where required or directed by Engineer-in-Charge. Cost is included in unit rate.
All as per item No 3 above but in ceiling complete all as specified and as directed.
Material and labour for one coat of synthetic enamelled paint on old decorated wooden surface exc 10cm width or girth including preparation of surfaces and necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg).
All as per item No-5 above but on old decorated steel surface complete all as specified and as directed.
Material and labour for one coat of cement base paint (white or coloured as per site requirement) on old decorated surface of external walls including preparation of surfaces to remove all foreign materials including necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg). Note : No separate payment shall be made for colour of distemper where required or directed by Engineer-in-Charge. Cost is included in unit rate.
Material and labour for one coat of weather proof exterior emulsion paint (anti fungal) (white or coloured as per site requirement) on old decorated surface of external walls including preparation of surfaces to remove all foreign materials and necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg). Note : No separate payment shall be made for colour of distemper where required or directed by Engineer-in-Charge. Cost is included in unit rate.
Material and labour for complete removal of existing treatment on walls including washing / rubbing down with water and applying two coats of acrylic distemper (white or coloured as per site requirement) over 3mm thick wall care putty in layer (each layer n. exc. 1mm thick) and a coat of primer including necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg). Note : No separate payment shall be made for colour of distemper where required or directed by Engineer-in-Charge. Cost is included in unit rate.
Taking down cement plaster of any description, including racking out joints, hacking for key, scrubbing down with water etc including necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg).
Material and labour for 15mm thick rendering in cement mortar (1:6) on other than fair faces of brick work or concrete surfaces finished even and fair without using extra cement including necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg).
Material and labour for 15mm thick rendering in cement mortar (1:4) on fair faces of brick work or concrete surfaces finished even and fair without using extra cement including necessary scaffolding complete all as specified and directed. (upto 12 storey bldg).
Material and labour for rendering 10mm thick in cement mortar (1:3) in ceiling including necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg).
Material and labour for applying 3mm thick wall care putty in layer (each layer n.exc 1mm thick) on new plastered surfaces including necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg).
Material and labour for two coats cement base paint (white or coloured as per site requirement) over a coat of primer on newly plastered surface including preparation of surface and including necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg). Note : No separate payment shall be made for colour of distemper where required or directed by Engineer-in-Charge. Cost is included in unit rate.
Material and labour for two coat acrylic distemper (white or coloured as per site requirement) over one coat of priming chalk whiting on new or previously untreated plastered surfaces including preparation of surface and including necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg). Note : No separate payment shall be made for colour of distemper where required or directed by Engineer-in-Charge. Cost is included in unit rate.
Material and labour for preparation of new or previously un treated surfaces of wall and applying two coat of white wash including necessary arrangement for working platform complete all as specified and directed (upto 12 storey bldg).
All as per item No-17 but on ceiling complete all as specified and as directed.
Grubbing up and uprootinng of trees / plants of any girth and height from external walls of bldgs upto 12 storyed height pouring muratic acid for burning risidual roots if any, racking out the dead roots from plants / concrete joints upto its penetrated portion and filling with PCC (1:2:4), type B0 (using 12.5 mm graded stone aggregate) and finishing the surface with 15mm thick rendering in cement mortar (1:4) including necessary hanging arrangement complete all as specified and as directed.
Chipping of unsound /weak concrete materials from slabs, beams, columns, lintel, chajja, fin, facia etc. by any means as directed by engr-in-charge including tapering all edges, making square shoulders of cavities air or sand blasting etc and cleaning of exposed concrete surface of lightly picking materials by air blasting or sand blasting including foreign matrials , loose concrete/aggregate etc including double layer steel scaffolding as working platform and disposal of all debris out of MOD land for 25mm average thickness for slabs/Chajja. Complete all as specified and as directed (upto 12 storey). Make : BASF/ SIKA/ Maruti/ Fosroc/ STP/ Choksey
All as per Item No 20 above but 50 mm average thickness for beams/Lintel.
All as per Item No 20 above but 60 mm average thickness for Column
All as per item No-20 above but to add for every 10 mm thickness extra for item No-20, 21 & 22.
Material and Labour for preparation of surfaces and providing single coat of epoxy bond adhesive on prepared non metallic surface (existing surface) and applying by brush all as per manufactures instruction/specification. The bonding agent shall have minimum compressive strength of 40 N/Sqmm including double layer steel scaffolding as working platform and complete all as specified and directed (upto 12 storey bldg). Make : BASF/ SIKA/ Maruti/ Fosroc/ STP/ Choksey
Supply, mixing and application two component structural grade polymer modified reinstatement morter to column/beam/ceiling/chajja surface etc where local spalling has taken place or shuttering is not possible . The morter can be applying in layers not exceeding 6mm thick in each layer in and upto any thickness in smaller vertical pockets and upto any thickness in horizontal applications. The mortar should have a minimium compressive strength 12N/mm2 in 1 day and 45N/mm2 in 28 days. Minimum flexural strength should be 8 N/mm2 in 28 days. A modified styrene butadience emulsion for use as a bonding aid and gauging liquid for cementious system to be mixed with cement slurry before the application of modified polymer mortar to be used @ 6 ltr/bag of cement. The bonding agent should have minimium compressive strength 24N/mm2. Minimum tensile strength 3.5N/mm2, minimium flexural strength 6.5N/mm2 including double layer steel scaffolding as working platform complete all as specified and directed for any thickness and upto 12 storey bldg . Make : BASF/ SIKA/ Maruti/ Fosroc/ STP/ Choksey
Material and Labour for applying curing compound over concrete surfaces as per manufactures instruction including double layer steel scaffolding as working platform complete all as specified and directed upto 12 storey bldg. Make : BASF/ SIKA/ Maruti/ Fosroc/ STP/ Choksey
Removing of concrete all around reinforcement including from behind the reinforcing bars to give an average 25mm (but not less than 15mm clear air gap)by manual methods (using wire brushing, chiselling etc) and applying alkaline rust removing chemical followed by removing rust including from behind the reinforcing bars by emery paper and cleaning the area throughly by water and allow it to dry all as per manufacturer,s instruction to give it a totally rust free finished steel surface including double layer steel scaffolding as working platform complete all as specified and directed upto 12 mm dia bar and above. ( upto 12 storey of building)
Supply and application of Epoxy Zinc rich primer on the prepared steel surface by brush the primer shall have a minimium specific gravity 1.75 minimum weight film thickness/coat 40 microns and minimum adhesive bond strength with steel is 1.5N/mm2 upto 12 mm dia bar and above including double layer steel scaffolding as working platform complete all as specified and directed upto 12 storey High. Make : BASF/ SIKA/ Maruti/ Fosroc/ STP/ Choksey
A S ENTERPRISE
RAY STANDARD ENGG CO.
R.R.ENTERPRISE
DEEPAK KHATTAR
S C ROY AND CO
PODDAR SALES CORPORATION
M/S AVIJEET INTERNATIONAL
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .