Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹56,392
EMD Value
₹1,128
Closing Date
4 Jul 2023, 6:00 pmClosed
SDE(C)
Sub-Divisional Engineer (Civil) BSNL CIVIL SUB DIVISION Vivek Vihar, New Delhi-95
A/R and M/O to BSNL staff quarters at Vivek Bihar, New Delhi (SH- Repairing of damaged GT, damaged Manholes and replacement of damaged GI pipes in quarter at Vivek Vihar) A-07, Vivek Vihar and replacement of damaged CI pipe in bathroom in A-08, Vive
2023_BSNL_159150_1
25/EE/BCD-I/ND/2023-24
Open Tender
Civil Works
Item Rate
30 days
Vivek Vihar, New Delhi
Please refer Tender documents.
4 documents required · 4 mandatory
₹177
AO (Cash)
₹1,128
6 Jul 2023
28 Jun 2023
6 Jul 2023
28 Jun 2023
4 Jul 2023
28 Jun 2023
Repairing of damaged GT of Size 100x100mm by cement plaster (1Cement: 6 Coarse sand) including finishing with floating of neat cement punning all complete as per direction of Engineer in Charge.
Repairing of damaged Manhole of Size 90x80x45CM by cement plaster (1Cement: 6 Coarse sand) including finishing with floating of neat cement punning all complete as per direction of Engineer in Charge.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall (a) 20 mm nominal dia Pipes
(a) 25 mm nominal dia Pipes
Providing and fixing in position pre-cast R.C.C. manhole cover and frame of required shape and approved quality (a) Rectangular shape 600x450 mm internal dimensions
12 mm cement plaster of mix : (a) 1:6 (1 cement: 6 fine sand)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for (a) Suspended floors, roofs, landings, balconies and access platform
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (a) Thermo-Mechanically Treated bars of grade Fe-500D or more.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .