| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-AOC | ₹4.4 Cr | L1 | Accepted-AOC OK |
| 2 | Not Admitted-Fee/PreQual/Technical JIND JIND HARYANA | JIND | HARYANA | 126101 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical 858 SECTOR 23 127021 2021R109 | BHIWANI | HARYANA | 127021 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical HOUSE NO 953 SECTOR 23 HUDA BHIWANI TEHSIL AND DISTRICT BHIWANI | BHIWANI | BHIWANI | HARYANA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical NEAR WARD NO 15 CHHABRA COLONY NEAR NEW BYE PASS ASANDH 132039 HARYANA | KARNAL | HARYANA | 132039 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.2 Cr
EMD Value
₹8.5 L
Closing Date
4 Mar 2021, 1:00 pmClosed
XEN/Bond W.S Division, Bhiwani
XEN/Bond W.S Division, Bhiwani
Laying underground pipe line from RD 0 to 9000 in Chang DrainNo 2 out falling at RD 155700R Bhiwani Disty
2021_HRY_160843_1
1376-95/NIT dated 23/02/2021
Open Tender
Civil Works
Item-rate/Agreement basic
120 days
Bhiwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹8.5 L
Yes
XEN/Bond W.S Division, Bhiwani
1 Apr 2021
24 Feb 2021
5 Mar 2021
24 Feb 2021
4 Mar 2021
24 Feb 2021
26 Feb 2021
Amount
E/work Excavation F&T HSR 6.6 @ Rs 1108.10+425%=5817.53%cum
1st class Brick Masonry 1:3 in F&P (HSR 11.5) @ 461.40+650%= 3460.50/cum
1st class Brick Masonry 1:3 in Super structure HSR 11.10@ 482.40+650% = 3618.00
RCC M-25 with stone aggregate HSR 10..73 @797+450% = 4383.50/cum
Steel reinforcement for RCC work @ 927.05+500% = 5562.30/qtl
Centering & Shutring HSR 9.7 @ sides 57.80+400% = 289.00/ sqm
Filling Expansion Joints HSR item No. 24.34 @ Rs. 0.35+350% = 1.57
Dismanteling Pucca road HSR item No. 24.37 @ Rs. 296.70+370% = 1394.49
Restoration of road HSR item No. 24.38 @ Rs. 5247+350% = 23611.5
Dismanteling of Brick work HSR item No @ Rs. 35.60+550% = 231.40
Dismentalling of RCC Slab HSR 8.6 (f) @ 108.05 +550%= 702.33
E/work upto avarage laid 495 mtr HSR item No. 6.2 (b) (586.60+6x15+32x13.25+26x12)+425% = 7657.13
Supply of RCC Pipe Np3 900 mm dia HSR 29.96 (viii) @ 3922.00/mtr
Removal of RCC pipe NP3 900 mm dia HSR 8.35 @ 11.75 + 500% =70.5
Laying Brick on edge paving sand grouted HSR item No. 14.20 @ Rs. 38.70+600% = 270.90
Brick work laying in mud mortar F&P HSR item No. 11.35 @ Rs. 303.40+650% = 2275.50
Dismanteling dry Brick on Edge paving HSR item No. 8.5 (i) @ Rs. 7.65+550% = 49.73
Dismanteling of Brick work in mud mortar HSR item No 8.35(d) @ Rs. 13.30+550% = 86.45
E/work disposal up to lead of 30 mtr HSR item No. 6.2 (b) @ Rs. (586.60+2x22.65+425%) = 3317.48
Laying Dry Brick ballast under brick on edge pitching HSR 10.117 @ 121.20+450% = 666.60
Compaction with rollar@ (68.10+75-45.90) +425% +225+135% = 1039.05
CC 1:2:4 plan for bed plate HSR item No. 10.41 @ Rs. 615.60+450% = 3385.80
CC 1:3:6 Plain for Hodies & S. well HSR item No. 10.40 @ Rs. 516.90+450% = 2842.95
Cement pointing 1:2 deep varity HSR 15.60@ 9.90+600% = 69.30
12 mm thick Cement Plaster 1:3 with 1mm net cement rendering HSR item no 15.5@ 15.0+600% = 105 / sqm
Providing laying and supply of 1000 mm dia RCC NP3 RCC pipe HSR 29.96 (ix) @ 4851.25/mtr
Providing laying and supply of 400 mm dia RCC NP3 RCC pipe HSR 29.96 (ii) @/1364.00mtr
Laying of 100 Micron polythene under bed lining as per drawing design and as per approved designed section and PWD specifiction. (As per CADA)
Supply of 100 Micron polythene under bed lining as per drawing design and as per approved designed section and PWD specifiction. (As per CADA)
First class brick work laid in cement sand mortar 1:5 in foundation and plinth (Bed Lining) (HSR Item no 11.3) @ 407.60+650%=3057.00 x 0.0762= 232.94
First class Brick work laid in cement sand mortar 1:5 in foundation & plinth for side lining including Nakka and Culvert (HSR Item no 11.3) @ 407.60+650%= 3057.00
Plastering on walls 10 mm thick cement plaster 1:4 (Laying Fillet gola, culvert, silt Trap and Nakkas)(HSR Item no 15.5 derived) @ 12.70+600%= 88.90 x 10/12 = 74.08
Dressing of bed prepration of sub grade for lining.(As per Itom No. 2) (HSR Item no 19.1)@ 14.85
Providing Iron Steps
Conglomater floring HSR item no. 14.13 @ 74.50+400% = 372.50
Iron door and window HSR 18.31
Credit steel
Dismentalling brick work
RCC pipe 900mm
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .