Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | -40.20% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.8 L+₹10,738.09 (6.17%)Admitted-Finance | -36.51% | ₹1.8 L+₹10,738.09 (6.17%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 L+₹36,812.17 (21.2%)Admitted-Finance NA | -27.55% | ₹2.1 L+₹36,812.17 (21.2%) | L3 | Admitted-Finance |
| 4 | L4₹4.3 L+₹2.5 L (145.0%)Admitted-Finance | +46.50% | ₹4.3 L+₹2.5 L (145.0%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.9 L
EMD Value
₹5,820
Closing Date
12 Sept 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW JAMMUOFFICE OF EX
OFFICE OF EXECUTIVE ENGINEER REW JAMMU
Construction of lane and drain from distributary sua to baddan rajinder ranja pyt manchak block khour AC Chhamb Distt Jammu Under the head CDS (2nd Call)
2026_RDPR_323213_3
e-NIT No. 523-REWJ of 2026-27 dated 03-09-2026
Open Tender
Civil Works - Others
Item Rate
JAMMU
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH0515
₹5,820
Yes
18 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
12 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches foundations, drains,pipes, cables etc(not exceeding 1.5m in width)including dressing of sides and ramming of bottom lifts upto 1.5m inc.getting out excavated earth & disposal of surplus excavated earth as directed:in all kinds of soil | 13.68 | cum. | 256.85 | ₹3,513.71 |
| 2 | P/L in position Cement conc. 1 cement:5fine sand:10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 2.7 | cum. | 4,826.5 | ₹13,031.55 |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 36.5 | cum. | 5,733.6 | ₹2,09,276.4 |
| 4 | Centring & shuttering including strutting, propping etc. and removal of the formwork. | 180 | sqm. | 286.35 | ₹51,543 |
| 5 | 06 KM by MT | 17 | cum. | 216.4 | ₹3,678.8 |
| 6 | 07 KM by MT | 30 | cum. | 232.06 | ₹6,961.8 |
| 7 | ADD COST OF SIGN BOARD= | 1 | job | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_1087143.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .