| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l-1₹15.0 LAccepted-AOC | l-1 | Accepted-AOC Lowest bidder for the subject work. | |
| 2 | L-2₹17.5 L+₹1.6 L (10.0%)Rejected-Finance | L-2 | Rejected-Finance other than the lowest bidder |
| Sl No | Description | Qty | Unit | KIRTIMAN ENTERPRISES L1 | KIRTIMAN TRADERS L2 |
|---|---|---|---|---|---|
| 1.00 | Disconnecting, opening of transformer of capacity 100 kVA to 800 kVA, 11 kV /415 volts, indoor/outdoor type of any make after unscrewing nuts & bolts, screws and connected, dismantling carefully connected accessories and removing primary and secondary terminals, top cover, conservator tank, temp gauge, breather, neutral earth strips and draining out transformer oil to the required level and storing carefully in cleaned containers (to be arranged by contractor) etc. for replacement of defective parts such as replacement of leaking gaskets, replacement of worn out/burnt out studs, checking and cleaning of contacts of tap changer and re-assembling the transformer after replacing the defective parts, testing complete all as specified and as directed.
Note: - (a) Transformer oil shall be drained out by the contractor in suitable capacity mild steel drums to be arranged by the contractor. The said drained out transformer oil shall be refilled in the transformer duly dehydrated after repair and the cost thereof shall be included in unit rate quoted against the respective item of this schedule and paid separately.
(b) The spare parts excluding nuts, bolts, washer, gasket etc. shall be measured and paid for separately.
(c) Testing of transformer after repair shall be carried out as per IS 2026 (Part 1): 2011 and testing as specified and the cost of testing shall be deemed to be included in unit rate quoted against this item. | 10 | Each Job | 5,000 ₹50,000 Lowest | 6,000 ₹60,000 |
| 2.00 | S & F in repairs 12 kV or 17.5 kV/ 250 A bushing with copper stem including both porcelain parts and metal parts with accessories as per IS 3347 Part 3 (section 1 & 2) complete all as specified and as directed. | 9 | Each Set | 1,500 ₹13,500 Lowest | 2,000 ₹18,000 |
| 3.00 | S & F in repairs upto and including 1.1 kV/ 630 A bushing with copper stem including both porcelain parts and metal parts with accessories as per IS 3347 Part 1 (section 1 & 2) complete all as specified and as directed. | 12 | Each Set | 1,500 ₹18,000 Lowest | 2,000 ₹24,000 |
| 4.00 | S & F in repairs 25 mm dia gunmetal drain valve of transformer as per existing one along with brass/ gun metal dummy cap complete all as specified and as directed. | 2 | Each | 700 ₹1,400 Lowest | 1,000 ₹2,000 |
| 5.00 | S & F in repairs 50 mm dia gunmetal drain valve of transformer as per existing one along with brass/ gun metal dummy cap complete all as specified and as directed. | 2 | Each | 1,500 ₹3,000 Lowest | 2,000 ₹4,000 |
| 6.00 | S & F Silica gel breather containing 250 gms silica gel, indicating type, 4 to 6 mm standard size of the particle, blue colour silica, breather body made out of aluminium pressure die cast, shot blasted and powder coated, container and oil cup made out of 143R grade UV resistant polycarbonate, all gaskets made out of nitrile cork (RC 70C) rubber, flanged type. breather piping doesn’t include any valve between conservator and breather, removable type mounted at suitable height from ground level, tested for 0.35 kg / cm for all joints complete all as specified and as directed. | 3 | Each | 400 ₹1,200 Lowest | 500 ₹1,500 |
| 7.00 | S & F Silica gel breather containing 500 gms silica gel, indicating type, 4 to 6 mm standard size of the particle, blue colour silica, breather body made out of aluminium pressure die cast, shot blasted and powder coated, container and oil cup made out of 143R grade UV resistant polycarbonate, all gaskets made out of nitrile cork (RC 70C) rubber, flanged type. breather piping doesn’t include any valve between conservator and breather, removable type mounted at suitable height from ground level, tested for 0.35 kg / cm for all joints complete all as specified and as directed. | 5 | Each | 1,000 ₹5,000 Lowest | 1,200 ₹6,000 |
| 8.00 | Taking out old unserviceable off load tap changer from 11 kV / 433 V Transformer & Supply and fix new off load tap changer suitable for 11 kV/ 433 V Transformer and as per the existing one complete all as specified and as directed. | 4 | Each | 1,500 ₹6,000 | 1,000 ₹4,000 Lowest |
| 9.00 | Removing the existing burnt out complete (HT/LT side) winding without damaging the core and rewinding both primary and secondary windings with appropriate gauge of annealled and super enameled copper/aluminum wire conductor and number of turns as per manufacturer recommendation including insulation materials as required complete all as specified and directed.
Note:- Rewinding of both HT & LT coils shall be measured and paid separately under respective item of this schedule. | 5 | Each Job | 2,500 ₹12,500 Lowest | 3,000 ₹15,000 |
| 10.00 | M & L for HT/LT coils, 11 KV/ 440 Volts fabricated out of new aluminium wire/strip of suitable gauge with proper insulation, varnish etc. suitable for indoor/outdoor type transformer complete all as specified and directed. | 200 | Kg | 550 ₹1,10,000 Lowest | 600 ₹1,20,000 |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
2 Oct 2025, 6:00 pmClosed
Col Pawan Kumar, CWE
Headquarters, Commander Works Engineer, Bhopal, Military Engineer Services, SI Line, Bhopal, Pin Code - 462001 (Madhya Pradesh)
MAINTENANCE AND UPKEEP OF HT DISTRIBUTION SYSTEM TRANSFORMER AND ALLIED WORKS NASIRABAD AND AJMER MIL STATION UNDER GE NAISRABAD
2025_MES_728676_1
84074/E8
Open Tender
Civil Works
Item Rate
180 days
Nasirabad
AS PER NIT CONDITION
7 documents required · 7 mandatory
₹500
Yes
GE Nasirabad
₹30,000
Yes
3 Nov 2025
1 Sept 2025
4 Oct 2025
1 Sept 2025
2 Oct 2025
15 Sept 2025
1 Sept 2025 - 15 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .