| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.4 LRejected-Finance | ₹36.4 L | L1 | Rejected-Finance Due to Administrative reason Tender cancelled, Retender called on 02.01.2024 |
| 2 | L2₹36.7 L+₹28,744.21 (0.79%)Rejected-Finance | ₹36.7 L+₹28,744.21 (0.79%) | L2 | Rejected-Finance Due to Administrative reason Tender cancelled, Retender called on 02.01.2024 |
Tender Value
₹36.8 L
EMD Value
₹74,000
Closing Date
4 Aug 2023, 3:00 pmClosed
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Madurai District Renewal Of Block Topping the Road from Koodakoil to Kallanai Road ( L024) (0/0 - 2/225)in Kallikudi block Under PMGSY incentive Fund (2022-23)
2023_RDTN_126639_1
DIPR/3802/Tender/2023Dated 20.07.2023
Open Tender
Civil Works - Roads
Item Rate
120 days
KALLIKUDI
Refer Tender document
4 documents required · 4 mandatory
₹0
₹74,000
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
30 Dec 2023
24 Jul 2023
4 Aug 2023
24 Jul 2023
4 Aug 2023
27 Jul 2023
27 Jul 2023
Amount
Renewal Of Block Topping the Road from Koodakoil to Kallanai Road ( L024) (0/0 - 2/225) Panchayat ( Incentive Fund )
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal 0/0-1/0
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) plastic wastage Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0
Supply and fixing of KM stone SI No. 43 A.
Supply and fixing of HM stone SI No. 44 A
Provision for MS Name Board.
Renewal Of Block Topping the Road from Koodakoil to Kallanai Road ( L024) (0/0 - 2/225) Panchayat ( Incentive Fund )
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
T.Mohan
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .