| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | -48.05% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.2 LAdmitted-Finance | -45.10% | ₹3.2 L | L2 | Admitted-Finance |
| 3 | L3₹3.4 LAdmitted-Finance | -40.15% | ₹3.4 L | L3 | Admitted-Finance |
| 4 | L4₹3.8 LAdmitted-Finance | -33.99% | ₹3.8 L | L4 | Admitted-Finance |
| 5 | L5₹3.9 LAdmitted-Finance | -33.07% | ₹3.9 L | L5 | Admitted-Finance |
Tender Value
₹5.8 L
EMD Value
₹17,250
Closing Date
2 Jan 2026, 11:00 amClosed
DIVISIONAL FOREST OFFICER BATOTEDIVISIONAL FOREST
DIVISIONAL FOREST OFFICER BATOTE
BOQ
2025_FD_299092_1
TENDER NO 26 OF 2025-26
Open Tender
Agricultural or Forestry
CO 20 BATOTE
SBD
2 documents required · 2 mandatory
₹300
Yes
DIVISIONAL FOREST OFFICER BATOTE
₹17,250
19 Jan 2026
24 Dec 2025
2 Jan 2026
24 Dec 2025
2 Jan 2026
24 Dec 2025
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1 m from cutting edge Hard Soil
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1 m from cutting edge Ordinary Rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size)
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah
Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah
Filling of Stones including Dumping of stones.Supply of stones over conty lever as passage
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand :6 graded stone aggregate 40 mm nominal size)
Providing and laying damp-proof course 5Crnm thick with cement concrete 1:2:4 (1 cement : 2 co.:Hse sand 4 graded stone aggregate 20mm nominal size i Nallah
Providing hoisting and fixing trusses/purlins /rafters/posts/ post-plates or like components including cost of screws etc. complete Second class Deodar wood Engage 10 Labour for 8 days for above work
Providing hoisting and fixing trusses/purlins /rafters/posts/ post-plates or like components including cost of screws etc. complete Second class Deodar wood
Strctural steel work in single section fixed without connecting plate including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Carriage of Sand
Carriage of Bajri
Carriage of Stone
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_969939.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid