Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.3 CrAdmitted-Finance | ₹2.3 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Bhawani Electricals L2 | ISHIKA ENTERPRISES L1 | ELECTECH SWITCHGEAR PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00 | Providing & fixing of A Set of Nut bolts & washer ( 04 Nos. in Each) for refoundation of octagonal poles (Specification of nut bolts- 750mm long 20mm thickness, J Type). The bolts, nuts, and washers shall be hot-dip galvanized as per relevant IS galvanization standards to ensure corrosion resistance for outdoor installation : the material shall be purchased by a pole manufacturing company. The bidder shall submit a valid GST tax invoice along with proof of purchase/procurement and packaging records at the time of supply confirming that the material has been purchased from original manufacturer packaging and has not been repacked or altered. The item shall be new, unused, and approved by the engineer-in-charge prior to acceptance. | 218 | Each | 800 ₹1.7 L | 500 ₹1.1 L | 750 ₹1.6 L |
| 2.00 | Shifting and fixing of Existing Octagonal poles to nearby on new foundation | 218 | Each | 1,000 ₹2.2 L | 500 ₹1.1 L | 500 ₹1.1 L |
| 3.00 | Decorative Single Arm overhang of 1 mtr - Supply and Fixing of Pole OEM fabricated hot dipped galvanised M.S. Overhang with cap over the existing poles. Design will be given by Engineer Incharge | 20 | Each | 1,000 ₹20,000 | 500 ₹10,000 | 2,200 ₹44,000 |
| 4.00 | Safety & Security, operation and maintenance of the street light system during DLP with O&M of 3 yrs of the whole system( This comprises newly installed infrastructure and the existing system which will be handover to you from O&M firm).if failed, the fixture must be repaired within 3 days of fault, failing which penalty i.e. two times of the maintenance charges estimated by the department for each fixture for the month shall be deducted & recovered from the agency. (Note- Min. Rs.100/- per job will be held on account of O&M).Here 1 JOB is defined as per point per month | 28,800 | Job | 95 ₹27.4 L | 100 ₹28.8 L | 75 ₹21.6 L |
Tender Value
₹2.8 Cr
EMD Value
₹5.5 L
Closing Date
22 Apr 2026, 6:00 pmClosed
Unit Head
RIICO KISHANGARH
Upgradation of street light system at Kishangarh Phase IV, amounting to Rs. 276.72 lakh
2026_RIICO_549670_1
2025-26/KISHANGARH/29
Open Tender
Electrical Works
365 days
Kishangarh
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹5,900
Through SSO ID of Contractor
₹5.5 L
15 May 2026
2 Apr 2026
23 Apr 2026
2 Apr 2026
22 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & fixing of A Set of Nut bolts & washer ( 04 Nos. in Each) for refoundation of octagonal poles (Specification of nut bolts- 750mm long 20mm thickness, J Type). The bolts, nuts, and washers shall be hot-dip galvanized as per relevant IS galvanization standards to ensure corrosion resistance for outdoor installation : the material shall be purchased by a pole manufacturing company. The bidder shall submit a valid GST tax invoice along with proof of purchase/procurement and packaging records at the time of supply confirming that the material has been purchased from original manufacturer packaging and has not been repacked or altered. The item shall be new, unused, and approved by the engineer-in-charge prior to acceptance. | - | Each | - | - |
| 2 | Shifting and fixing of Existing Octagonal poles to nearby on new foundation | - | Each | - | - |
| 3 | Decorative Single Arm overhang of 1 mtr - Supply and Fixing of Pole OEM fabricated hot dipped galvanised M.S. Overhang with cap over the existing poles. Design will be given by Engineer Incharge | - | Each | - | - |
| 4 | Safety & Security, operation and maintenance of the street light system during DLP with O&M of 3 yrs of the whole system( This comprises newly installed infrastructure and the existing system which will be handover to you from O&M firm).if failed, the fixture must be repaired within 3 days of fault, failing which penalty i.e. two times of the maintenance charges estimated by the department for each fixture for the month shall be deducted & recovered from the agency. (Note- Min. Rs.100/- per job will be held on account of O&M).Here 1 JOB is defined as per point per month | - | Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
TDstreetlight.pdf
Tender Documents • 0.51 MB
BOQ_979948.xls
BOQ • 0.62 MB
Download all tender documents and submit your bid