Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC | L1 | Accepted-AOC Admitted | |
| 2 | L2₹15.4 L+₹3,984.56 (0.26%)Rejected-AOC | L2 | Rejected-AOC Not Admitted |
Tender Value
₹15.5 L
EMD Value
₹16,000
Closing Date
14 Feb 2023, 3:00 pmClosed
The BDO Hosur
BDO Office Hosur
Krishnagiri DT HOsur Block Mine and Minerals 2020-21 Construction of 30000 Litre Capacity OHT at Deveerapalli Village in Baliganapalli Panchayat Package No TN HSR 16
2023_RDTN_286785_1
ROCNo_350_2021_A4_23_11_2022
Open Tender
Civil Works - Water Works
Item Rate
90 days
Hosur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹16,000
BDO Office Hosur
31 Mar 2023
7 Feb 2023
14 Feb 2023
7 Feb 2023
14 Feb 2023
7 Feb 2023
9 Feb 2023
Amount
01.Construction of 30000 Litre Capacity OHT @ Deveerapalli Village H/o Baliganapalli Rs. 15.50 /- lakhs
Earth Work Excavation for Foundation inall Soils and SubSoil as per SS20B for Foundations
Supplying and Filling foundation and Basement with Filling sand in Layers not morte then 15cm thick well Ramed , Watered and Compacted complete complying with standard Specifications.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for fooundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Board officers.
RCC 1:11/2:3 using 20mm HBG Metal excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing
Items 1.50m to 4.50m Below GL
Items 0 to 1.50m Below GL
Items 0 to 4.50m Above GL
Above 4.50m and upto 7.32m Ht from GL
Above 7.32m and upto 10.98m Ht from GL
Above 10.98m and upto 14.64m ht form GL
Above 14.64m and upto 18.30m ht form GL
Supplying and Erection centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC Column footing column plinth Beam, Beams, Roof slabs, Staircase steps, bed blocks, Critical.
For Plan Surface
Below GL
From 0 to 3.30 m
From 5.30 to 6.30
From 8.30 to 9.30 Above GL
From 11.30 to 12.30
Curved Surface
Upto 3.30m height
From 5.31 tp 6.30m Height
Square Column
Below GL
Painting two coats over new plastered using approved cement paint including cost and conveyance of all Materialsto site and all labour charges etc., complete.
Supply and Fabricating and placinf in position S Steel or Ribbed for steel for all reinforecd cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification
Supply and Fabricating and Delivery and Placing in position MS Steel Ladder wide 0.45m made out of 50X50X6mm MS angle for side and steps in 16mm MS Plain rods fixed at 30cm C/c Welded and Jointed etc., complete complying with standard specification
Providing and fixing of R C C inner acess ladder in R C C 1:1.5:3 USING 20MM hbg stone for OHT including cost of reinforcement , placing grill in position, centering shuttering , mixing concrete curing etc.,
Reinforced Cement concrete 1 : 1.5 : 3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Centering charges by using MS sheets and angles
Supplying and Fabrication of Steel including cost conveyance of Steel , Binding wire and labour charges for cutting ,bending ,tieing in position as required
Providing Manhole cover of size 0.60 X 0.60 m in RCC 1:1.5:3 Mix Suitable Reinforcement and 50 X 50 X 6mm MS Angle Fixed Along Edges and as Directed by Deparmental Officers
Provision for Pipe Connectoin arrangements
50mm Dia GI Pipe for Outlet and Inlet Scour Pipes
50mm Dia GM Gate Valve
50mm dia Flange Set
50mm Dia GI Coupling
50mm dia GI Elbow
63mm PVC pipe 4 KSC
63mm PVC Pipe
Earth Work Excavation for Foundation inall Soils and SubSoil as per SS20B for Foundations (63mm PVC Pipe)
Laying And Jointing (63mm PVC Pipe)
Refilling in Foundation and Basement with Excavation Earth in Layer of not more then 15cm Thick (63mm PVC Pipe)
Provision for PVC Ventilating Arrangements mosquito proof nylon net with 110mm PVC pipes and cowl as dirrected by deparmental officers 2 nos etc., all complete
Provision for Soakpit
Earth work Excavation and deposting on bank with initital lead of 10m and lift of 2m in hard stiff clay, stiff coton soil hard re earth shales, murrams and earth mixed with small size in verious classification of soil comfrim to ss 20 B refilling of Excavated the earth etc., complete
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for fooundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Board officers.
Brick Work in Cement mortor 1:5 mis using Country brick of size 22 X 11X7 cm Including cost and conveyance and all labour charges
Supply and filling of 40 mmHBG Metal (jelly) Including cost and conveyance and all labour charges etc., complete
Supply and filling of sand as per the Specifications Including cost and conveyance and all labour charges etc., complete
Plastering with CM 1:5 Mix to 12mm Thick Including cost and conveyance and all labour charges etc., complete
Provision For Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SA Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .