| 1 | L1₹10.5 CrAccepted-AOC NO 12 RAMVILAS NAGAR NGO B COLONY TIRUNELVELI 627 007 | TIRUNELVELI | TAMIL NADU | 627007 | ₹10.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹10.5 CrRejected-AOC 18 CORPORATION ROAD DEVAKOTTAI | SIVAGANGA | TAMIL NADU | 630001 | ₹10.5 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹10.8 CrRejected-AOC | ₹10.8 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹10.9 CrRejected-AOC 17 NETHAJI ROAD MADURAI 625001 | MADURAI | TAMIL NADU | 625001 | ₹10.9 Cr | L4 | Rejected-AOC L4 |
| 5 | L5₹11.4 CrRejected-AOC NO 6 885 A EV COLONY PARAMATHI ROAD NAMAKKAL 637 001 | NAMAKKAL | TAMIL NADU | 637001 | ₹11.4 Cr | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | vignesshandco L7 | KMC Associates, Theni L8 | M/s. Sindu Muruga Constructions Pvt. Ltd., L1 | Apex Civil Engineering L3 | SUN CONSTRUCTIONS L6 | KMR Projects Private Limited L5 | SHRI PRAKASH INFRA L4 | V MEENAL AND CO L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Road Work (Part-A) | |||||||||||
| 1.01 | Clearing Heavy Jungle.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness etc., complete complying with standrad specification and as directed by SIPCOT Officers. | 19,174 | Sqm | 8.58 ₹1.6 L | 8.84 ₹1.7 L | 29.77 ₹5.7 L | 5 ₹95,870 | 15 ₹2.9 L | 8.58 ₹1.6 L | 7 ₹1.3 L | 12.71 ₹2.4 L |
| 1.02 | Earth work excavation for cutting work in all class of soils such as hard stiff clay, stiff black cotton soil, etc., as per SS20-B ( HGS SS.20B) and deposting the same to the road side etc., complete complying with standrad specification and as directed by SIPCOT Officers. | 7,962 | Cum | 123.26 ₹9.8 L | 126.96 ₹10.1 L | 248.35 ₹19.8 L | 150 ₹11.9 L | 110 ₹8.8 L | 123.26 ₹9.8 L | 100 ₹8.0 L | 287.41 ₹22.9 L |
| 1.03 | Supplying and laying of 300 mm dia. RCC non pressure spun pipes with socket and spigot ends - NP 2 class as per IS 458/2003 manufactured with sulphate resistance cement with 12mm Hi - alumina lining with rubber rings including labour charges for laying at proper levels and locations, transportation cost, jointing materials etc complete complying with standard specification and as directed by SIPCOT Officers. | 280 | Rm | 1,041.53 ₹2.9 L | 1,072.78 ₹3.0 L | 836.73 ₹2.3 L | 2,000 ₹5.6 L | 1,265 ₹3.5 L | 1,041.53 ₹2.9 L | 850 ₹2.4 L | 1,310.11 ₹3.7 L |
| 1.04 | Forming embankment using excavated earth (2 Km internal lead) which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 250 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 95% proctor density for the soil below the top of 0.5 meter height of subgrade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 95% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete complying as per MORTH standard specification and as directed by SIPCOT Officers. (Forming Embankment at 95% Compaction) | 1,897 | Cum | 85.28 ₹1.6 L | 87.84 ₹1.7 L | 104.29 ₹2.0 L | 150 ₹2.8 L | 560 ₹10.6 L | 85.28 ₹1.6 L | 70 ₹1.3 L | 369 ₹7.0 L |
| 1.05 | Forming Subgrade using carted earth with a conveyance of 2 Km having CBR value not less then 8% which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 500 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 97% proctor density for the soil 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete complying as per MORTH standard specification and as directed by SIPCOT Officers. (Forming Subgrade at 97% Compaction) | 2,714 | Cum | 89.3 ₹2.4 L | 91.98 ₹2.5 L | 624.51 ₹16.9 L | 300 ₹8.1 L | 540 ₹14.7 L | 89.3 ₹2.4 L | 75 ₹2.0 L | 369 ₹10.0 L |
| 1.06 | Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- V of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers. | 4,429 | Cum | 2,533.05 ₹1.1 Cr | 2,609.04 ₹1.2 Cr | 2,680.09 ₹1.2 Cr | 2,000 ₹88.6 L | 2,470 ₹1.1 Cr | 2,400 ₹1.1 Cr | 2,100 ₹93.0 L | 1,558.74 ₹69.0 L |
| 1.07 | Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- III of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers. | 2,514 | Cum | 2,623.6 ₹66.0 L | 2,702.31 ₹67.9 L | 2,889.68 ₹72.6 L | 2,000 ₹50.3 L | 2,470 ₹62.1 L | 2,600 ₹65.4 L | 2,100 ₹52.8 L | 1,722.41 ₹43.3 L |
| 1.08 | Providing and laying, spreading and compacting graded stone aggreates to Wet Mix Macadam Base Course of 250mm compacted thickness specification in two layers of 150mm thick each or else as specified on the prepared sub base by providing approved Coarse graded material conforming to Table 400 - 13 and satisfying the physical requirement for material for WMM as per Table 400 - 12 of MORTH Rev.-5, including pre-mixing the materials with water at OMC in mechanical mix plant carriage of mixed matrerial by tipper to site laying in uniform layers with favours in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev.-5 and as directed by SIPCOT Officers. | 4,638 | Cum | 2,365.95 ₹1.1 Cr | 2,436.93 ₹1.1 Cr | 2,663.89 ₹1.2 Cr | 2,100 ₹97.4 L | 2,500 ₹1.2 Cr | 2,300 ₹1.1 Cr | 2,000 ₹92.8 L | 1,927.41 ₹89.4 L |
| 1.09 | Providing and laying Prime coat over wet mix macadam surface using 7.00 Kg of Emulsion bitumen (SS1) for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc., complete as per clause 502 of MORT & H specifications and as directed by SIPCOT Officers. | 18,552 | Sqm | 81.71 ₹15.2 L | 84.16 ₹15.6 L | 73.79 ₹13.7 L | 80 ₹14.8 L | 90 ₹16.7 L | 81.71 ₹15.2 L | 70 ₹13.0 L | 67 ₹12.4 L |
Tender Value
₹12.8 Cr
EMD Value
₹6.5 L
Closing Date
16 Dec 2024, 3:30 pmClosed
Managing director
SIPCOT Head office Egmore Chennai
Formation of Internal roads, Construction of RCC Box culvert and Construction of RCC storm water drain at SIPCOT Industrial Park, Melur, Madurai District
2024_SIPCT_501747_1
NIT.No.29/CD/T.No.29/2024-25
Open Tender
Civil Works
SIPCOT Industrial Park, Melur
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹6.5 L
SIPCOT Head office chennai
12 Dec 2025
16 Nov 2024
17 Dec 2024
16 Nov 2024
16 Dec 2024
16 Nov 2024
25 Nov 2024
Amount
Road Work (Part-A)
Clearing Heavy Jungle. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness etc., complete complying with standrad specification and as directed by SIPCOT Officers.
Earth work excavation for cutting work in all class of soils such as hard stiff clay, stiff black cotton soil, etc., as per SS20-B ( HGS SS.20B) and deposting the same to the road side etc., complete complying with standrad specification and as directed by SIPCOT Officers.
Supplying and laying of 300 mm dia. RCC non pressure spun pipes with socket and spigot ends - NP 2 class as per IS 458/2003 manufactured with sulphate resistance cement with 12mm Hi - alumina lining with rubber rings including labour charges for laying at proper levels and locations, transportation cost, jointing materials etc complete complying with standard specification and as directed by SIPCOT Officers.
Forming embankment using excavated earth (2 Km internal lead) which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 250 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 95% proctor density for the soil below the top of 0.5 meter height of subgrade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 95% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete complying as per MORTH standard specification and as directed by SIPCOT Officers. (Forming Embankment at 95% Compaction)
Forming Subgrade using carted earth with a conveyance of 2 Km having CBR value not less then 8% which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 500 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 97% proctor density for the soil 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete complying as per MORTH standard specification and as directed by SIPCOT Officers. (Forming Subgrade at 97% Compaction)
Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- V of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers.
Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- III of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers.
Providing and laying, spreading and compacting graded stone aggreates to Wet Mix Macadam Base Course of 250mm compacted thickness specification in two layers of 150mm thick each or else as specified on the prepared sub base by providing approved Coarse graded material conforming to Table 400 - 13 and satisfying the physical requirement for material for WMM as per Table 400 - 12 of MORTH Rev.-5, including pre-mixing the materials with water at OMC in mechanical mix plant carriage of mixed matrerial by tipper to site laying in uniform layers with favours in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev.-5 and as directed by SIPCOT Officers.
Providing and laying Prime coat over wet mix macadam surface using 7.00 Kg of Emulsion bitumen (SS1) for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc., complete as per clause 502 of MORT & H specifications and as directed by SIPCOT Officers.
Providing and laying Tack coat over treated wet mix macadam surface using 2.50 Kg bitumen emulsion (RS1) to cut back for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 503 of MORT & H specifications and as directed by SIPCOT Officers.
Providing and laying to 75 mm thickness Dense Bituminous macadam using 0.40 cum of 37.50 -13.20 mm IRC size graded metal 0.35 cum of 13.20 - 2.36mm IRC graded metal and 0.36 cum of 2.36mm and below IRC size HBG metal with 71.30 kg of VG30 bitumen for premixing for 10 Sq.meter includin cost and conveyance of all materials to CMP site including cost and conveyance of bitumen and other materilas to CMP site heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hoti mix plant 20-30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 75 mm with mechanical paver to the specified grades and cross sections and compaction by vibratory Pneumatic Roller to the required density etc., including labour charges for loading the bitumen in bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire,fuel charges for 20-30 tonnes capacity CMP unit bitumen boiler, tipper ttrucks, paver finisher/9 m paver finisher, vibratary/Pneumatic Roller, and al other tools & plants required including fuel and all other incidental charges etc., complete asper specification using CMP as per clause 505 MORTH REV. V Specification and as per directed SIPCOT Officers.(Grade I)
Providing and laying to 95 mm thickness Dense Bituminous macadam using 0.40 cum of 37.50 -13.20 mm IRC size graded metal 0.35 cum of 13.20 - 2.36mm IRC graded metal and 0.36 cum of 2.36mm and below IRC size HBG metal with 71.30 kg of VG40 bitumen for premixing for 10 Sq.meter including cost and conveyance of all materials to CMP site including of cost and conveyance of bitumen and other materilas to CMP site heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 95 mm with mechanical paver to the specified grades and cross sections and compaction by vibratory Pneumatic Roller to the required density etc., including labour charges for loading the bitumen in bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire,fuel charges for 20-30 tonnes capacity CMP unit bitumen boiler, tipper trucks, paver finisher/9 m paver finisher, vibratary/Pneumatic Roller, and all other tools & plants required including fuel and all other incidental charges etc., complete asper specification using CMP as per clause 505 MORTH REV. V Specification and as per directed SIPCOT Officers.(Grade I)
Providing and laying 40mm compacted thickness bituminous concrete using 0.13 cum of 19.0 - 9.5 mm graded IRC size HBG metal 0.17 cum of 9.5-2.36mm IRC graded metal and 0.26 Cum. of 2.36 mm and below size graded metal with 50.30 of bitumen grade VG 30 confirming to IS 73 for pre mixing for 10 Sq. meter and using materials as per table 500 - 17 and staifying the physical requirement for material for course aggregates for BC as per table 500 - 16 of MORTH REV-V including cost and conveyance of all materials to CMP site , heating the bitumen andaggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity, conveyin the mix by tipper trucks to paver site spreading the mix in required temperature for uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidation 80-100 kn vibratory/Pneumatic road roller to the required density etc., includinglabour charges for loading the bitumen in bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire, fuel charges for 20-30 tonnes capacity CMP unit bitumen boiler, tipper trucks, paver finaisher/9 m paver finisher /Vibratory/Pneumatice road roller , and all other tools and plants requried, including fuel and all other incidental charges etc., complete as per specification using CMPP as per clause 507 OF MORTH REV. specification and as directed by SIPCOT Officers. (Grade II)
Providing and laying 40mm compacted thickness bituminous concrete using 0.13 cum of 19.0 - 9.5 mm graded IRC size HBG metal 0.17 cum of 9.5-2.36mm IRC graded metal and 0.26 Cum. of 2.36 mm and below size graded metal with 50.30 of bitumen grade VG 40 confirming to IS 73 for pre mixing for 10 Sq. meter and using materials as per table 500 - 17 and staifying the physical requirement for material for course aggregates for BC as per table 500 - 16 of MORTH REV-V including cost and conveyance of all materials to CMP site , heating the bitumen andaggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity, conveyin the mix by tipper trucks to paver site spreading the mix in required temperature for uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidation 80-100 kn vibratory/Pneumatic road roller to the required density etc., includinglabour charges for loading the bitumen in bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire, fuel charges for 20-30 tonnes capacity CMP unit bitumen boiler, tipper trucks, paver finaisher/9 m paver finisher /Vibratory/Pneumatice road roller , and all other tools and plants requried, including fuel and all other incidental charges etc., complete as per specification using CMPP as per clause 507 OF MORTH REV. specification and as directed by SIPCOT Officers. (Grade II)
Providing Centre Median of 2.00 m wide with Cast - in - situ Barrier type Kerbs having bottom width of 165 mm and top width of 115 mm and to a height of 580 mm size (with 20 mm chamfered edges at top ) on both sides with Vibrated cement concrete of M 20 using 20 mm ISS metal and filling with excavated earth in between the kerbs including cost and conveyance of all materials to work site including labour charges for mixing, laying, curing etc including Form work charges for kerbs and including rendering smoothing the exposed surfaces with CM 1:3 without claiming extra including Painting two coats black and white over the CC surfaces with approved Synthetic Enamel Paint etc, including all labour charges ,hire and fuel charges for the tools and plants employed and as per the standard specification and in accordance with the drawings appended here with etc complete complying with standard specification and as directed by SIPCOT Officers.
Vibrated Cement concrete in CC M 15 using 20mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges shoring, strutting etc complete complying with standard specification and as directed by SIPCOT Officers. for FOOTPATH KERB WALLS.
Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- V of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers.
Supplying and Filling with Quarry Dust to the required thickness of 30 mm including cost and conveyance of all materials to site from any approved source satisfying the standard specifications and all labour charges for filling in layers compacting, ramming to obtain the maximum density by watering with all leads for water including all other incidental charges etc complete complying with standard specification and as directed by SIPCOT Officers for Bedding to Blocks.
Supplying and laying of 60mm thick TAMIN paver block interlocking over a stone dust cussion and pointed with nice M-sand with required design and size (should be got approved by the Engineer in charge before use on works) meeting their international standard with higher loading capacity, rate including cost and conveyance of all required materials at site (excluding cost of stone dust) and all labour charges for laying, compacting with paver vibrator etc., complete complying with standard specification and as directed by SIPCOT Officers.
Vibrated Cement concrete in CC M 15 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges shoring, strutting etc complete complying with standard specification and as directed by SIPCOT Officers. for CHUTE ALONG THE FOOTPATH.
Supplying and fixing PVC pipes of 100 mm dia for Drain Pipes including cost and conveyance of all materials to worksite to worksite and labour charges for fixing, etc complete complying with standard specification and as directed by SIPCOT Officers. for FOOTPATH
Construction of Single Cell Box Culverts (Ch 0+050) (Part B)
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per standard specification and as directed by SIPCOT Officers for dressing the bed up to sill level .
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc complete complying with standard specification and as directed by SIPCOT Officers. for foundation
Vibrated Cement concrete in CC M15 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per standard specification and as directed by SIPCOT Officers for foundation.
Vibrated Reinforced Cement concrete in M 25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per standard specification and as directed by SIPCOT Officers for CELL BOX.
Supply and fabrication of Fe – 500 steel with high strength corrosion resistant rebar (TMT Her Grade M) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete complying with standard specification and as directed by SIPCOT Officers.
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc., complete complying with standard specification and as directed by SIPCOT Officers.
Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 25mm, 11.2mm,6mm ISS Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, and incidental charges such as paling out water, etc., complete complying with standard specification and as directed by SIPCOT Officers, wearing coat of 75mm uniform thickness over deck slab and approach slab.
Vibrated cement concrete of grade M20 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing transporting, laying, and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting, etc., complete complying with standard specification and as directed by SIPCOT Officers for Wings walls, & parapet wall..
Construction of Single Cell Box Culvert (Ch 0+025).(Part C)
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, strutting, walling and forming protective bunds wherever necessary etc complete complying with standard specification and as directed by SIPCOT Officers. for dressing the bed up to sill level .
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete complying with standard specification and as directed by SIPCOT Officers for foundation.
Vibrated Cement concrete in M 15 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete complying with standard specification and as directed by SIPCOT Officers for foundation.
Vibrated Reinforced Cement concrete in M 25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete complying with standard specification and as directed by SIPCOT Officers for CELL BOX.
Supply and fabrication of Fe – 500 steel with high strength corrosion resistant rebar (TMT Her Grade M) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete complying with standard specification and as directed by SIPCOT Officers.
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc., complete complying with standard specification and as directed by SIPCOT Officers.
Vibrated Cement Concrete of grade M30 (Design Mix) using 25mm, 11.2mm,6mm IRC Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, and incidental charges such as paling out water, etc., complete complying with standard specification and as directed by SIPCOT Officers, wearing coat of 75mm uniform thickness over deck slab and approach slab.
Vibrated cement concrete of grade M20 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing transporting, laying, and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting, etc., complete complying with standard specification and as directed by SIPCOT Officers for Wings walls, & parapet wall..
Construction of Triple Cell Box Culvert (Ch 0+575).(Part D)
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, strutting, walling and forming protective bunds wherever necessary etc complete complying with standard specification and as directed by SIPCOT Officers. for dressing the bed up to sill level .
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete complying with standard specification and as directed by SIPCOT Officers for foundation.
Vibrated Cement concrete in M 15 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete complying with standard specification and as directed by SIPCOT Officers for foundation.
Vibrated Reinforced Cement concrete in M 25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete complying with standard specification and as directed by SIPCOT Officers for CELL BOX.
Supply and fabrication of Fe – 500 steel with high strength corrosion resistant rebar (TMT Her Grade M) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete complying with standard specification and as directed by SIPCOT Officers.
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc., complete complying with standard specification and as directed by SIPCOT Officers.
Vibrated Cement Concrete of grade M30 (Design Mix) using 25mm, 11.2mm,6mm IRC Graded HBGS Jelly including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, and incidental charges such as paling out water, etc., complete complying with standard specification and as directed by SIPCOT Officers, wearing coat of 75mm uniform thickness over deck slab and approach slab.
Vibrated cement concrete of grade M20 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing transporting, laying, and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting, etc., complete complying with standard specification and as directed by SIPCOT Officers for Wings walls, & parapet wall..
Construction of RCC Side Drain. (Part E)
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete complying with standard specification and as directed by SIPCOT Officers for foundation of Drain.
Vibrated Cement concrete in CC M15 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., etc., complete complying with standard specification and as directed by SIPCOT Officers for foundation.
Vibrated Reinforced Cement concrete in M25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete complying with standard specification and as directed by SIPCOT Officers for RCC Drain Base Slab, Walls.
Supply and fabrication of Fe – 500 steel with high strength corrosion resistant rebar (TMT Her Grade M) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete complying with standard specification and as directed by SIPCOT Officers.
Sub Total of Total Amount in Column BA (ie. Qty x Unit Rate)
Added GST of 18%
V MEENAL AND CO (BID ID -1211275)
Apex Civil Engineering (BID ID -1209969)
SHRI PRAKASH INFRA (BID ID -1210703)
KMR Projects Private Limited (BID ID -1211415)
SUN CONSTRUCTIONS (BID ID -1211446)
vignesshandco (BID ID -1209124)
KMC Associates, Theni (BID ID -1209483)
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid