| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹56.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹56.8 L+₹4,291.85 (0.08%)Admitted-Fee/PreQual/Technical/Finance | ₹56.8 L+₹4,291.85 (0.08%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹57.0 L+₹21,907.73 (0.39%)Admitted-Fee/PreQual/Technical/Finance | ₹57.0 L+₹21,907.73 (0.39%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M/S SAIKHOM LOKENDRO SINGH L3 | M/S THOUNAOJAM SANA SINGH L1 | M/S Y SOMORJIT SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00Reinforcement for R.C.C. work including straightening, cutting, bending,placing in position and binding all complete. Above Plinth level | ||||||
| 1.10 | Thermo-Mechanically Treated bars | 3,082.44 | kg | 125 ₹3,85,305 | 126 ₹3,88,387.44 | 124 ₹3,82,222.56 Lowest |
| 2.00Centering and shuttering including strutting, propping etc. and removal of form for: | ||||||
| 2.10 | Columns, Pillars, Piers, Abutments, Posts and Struts | 151.2 | sqm | 1,079 ₹1,63,144.8 | 1,077 ₹1,62,842.4 | 1,075 ₹1,62,540 Lowest |
| 2.20 | Suspended floors, roofs, landings, balconies and access platform | 17.75 | sqm | 843 ₹14,963.25 | 845 ₹14,998.75 | 840 ₹14,910 Lowest |
| 2.30 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 52.97 | sqm | 690 ₹36,549.3 | 695 ₹36,814.15 | 685 ₹36,284.45 Lowest |
| 3.00Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level upto floor five level excluding cost of centering,shuttering, finishing and reinforcement : | ||||||
| 3.10 | 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 10.53 | cum | 15,730 ₹1,65,636.9 | 15,729 ₹1,65,626.37 | 15,728 ₹1,65,615.84 Lowest |
| 4.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering,shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 6.63 | cum | 16,330 ₹1,08,267.9 | 16,331 ₹1,08,274.53 | 16,329 ₹1,08,261.27 Lowest |
| 5.00Steel work in built up tubular (round, square or rectangular tubes etc.) trusses etc., including cutting, hoisting fixing in position and applying a priming coat of approved steel primer, including welding and bolted including special shaped washers etc. complete. | ||||||
Tender Value
₹56.7 L
EMD Value
₹1.1 L
Closing Date
14 Jul 2026, 3:00 pmClosed
Executive Engineer (Civil), RIMS.
Regional Institutes of Medical Sciences, Imphal.
Vertical Expansion of PMR Modular OT building which include seminar room, Nursing room, washing area i/c cloth drying area, male/ female washroom,RIMS, Imphal
2026_RIMS_915831_1
27/2026-27/RIMS/Imphal
Open Tender
Civil Works
Supply
365 days
As Per Tender Document
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Director RIMS.
₹1.1 L
15 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reinforcement for R.C.C. work including straightening, cutting, bending,placing in position and binding all complete. Above Plinth level | |||||
| 1.1 | Thermo-Mechanically Treated bars | 3,082.44 | kg | 1 | ₹3,082.44 |
| 2Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 2.1 | Columns, Pillars, Piers, Abutments, Posts and Struts | 151.2 | sqm | 1 | ₹151.2 |
| 2.2 | Suspended floors, roofs, landings, balconies and access platform | 17.75 | sqm | 1 | ₹17.75 |
| 2.3 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 52.97 | sqm | 1 | ₹52.97 |
| 3Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level upto floor five level excluding cost of centering,shuttering, finishing and reinforcement : | |||||
| 3.1 | 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 10.53 | cum | 1 | ₹10.53 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering,shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 6.63 | cum | 1 | ₹6.63 |
| 5Steel work in built up tubular (round, square or rectangular tubes etc.) trusses etc., including cutting, hoisting fixing in position and applying a priming coat of approved steel primer, including welding and bolted including special shaped washers etc. complete. | |||||
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.14 MB
BOQ_962459.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .