SE EDC MAHOBA
OFFICE OF SE EDC MAHOBA
INCREASING OF CAPACITY OF DISTRIBUTION TRANSFORMER UNDER EDC MAHOBA UNDER BUSINESS PLAN ADDITIONAL 2023-24
2023_DVVNL_838932_1
39/SE/EDCM/2023-24
Open Tender
Electrical Works
Item Rate
180 days
Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
www.dvvnl.org
₹21,000
10 Oct 2023
16 Sept 2023
27 Sept 2023
16 Sept 2023
27 Sept 2023
16 Sept 2023
Amount
Erection of following material against work for increasing capacity of distribution Transformer under EDD I / II Mahoba as per RESSPO Drawings/Estimate and as per direction of Engineer Incharge. Work includes all cartage/carriage, cost of labour,T&P, fitting and fixing of material, commissioning and any other work which is required for completion of work.
PCC Pole 8.5mt. Long
Supply and Erection of Stone Pad.
Laying of CABLE L.T ABC 3X50+1X35+1X16SQMM
M.S. DROPPER CHANNEL 100X50X5X2028 MM
M.S. TOP CHANNEL 100X50X5X2240 MM
M.S. T-off Channel
Supply and Erection of Clamp with Nut & Bolt
11 KV disc insulator with disc fitting
11 KV Pin Insulator with Pin with nut
11 kV T.P.M.O.
ACSR Weasel cundocter
Supply and Erection of Danger board with Clamp
T/F BASE ANGLE 65X65X6X2028 MM
Installation of 25 KVA T/F Complete
Stay Complete
Earthing Complete
LT PIERCING CONNECTOR FOR SIZE 95/50/35
DEAD END CLAMP WITH EYE HOOK
DISTRIBUTION BOX 3 PHASE
SUSPENSION CLAMP
Dismounting and safe Cartage of 10/16 KVA Transformer Complete form site to ESC Mahoba Through the Kachcha Pakkca road including the work loading and Unloading at the respective Site including the work of dragging etc. also including the cost of labour, T&P and Carrier etc. required for proper completion of work.
Erection of 25 KVA Transformer Complete on the Pole Structure in proper alignment and as per instruction of superving engineer RESSPO manual it includes the cost of labour, T&P carrier etc. required proper completion of work.
Maa Electricals Energy
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .