Loading…
Loading…
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
4 Jul 2026, 4:00 pm6d left
Similar tender results from the same govt authority in the past 3 years.
CCE NH Circle Kendujhar
O/o the CCE NH Circle Kendujhar
Construction of 2 Nos of D Type Twin Type N.H. Staff Quarter at Deogarh for the Year 2025-26
2026_CENH_132444_1
CCE NHC KJR-03/2026-27
Open Tender
Civil Works - Buildings
300 days
Deogarh
Please refer Tender Documents
4 documents required · 4 mandatory
₹10,000
₹1.7 L
Yes
20 Jun 2026
20 Jun 2026
6 Jul 2026
20 Jun 2026
4 Jul 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Ground floor :Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the works site within 50m initial lead &1.5m initial lift. complete as directed by the E.I.C. | 468.87 | cum | 282.88 | ₹1,32,633.95 | BI01010001010000000000000515BI0100001112 |
| 2 | Supplying ,filling and backfilling of foundation with coarse sand well watered and rammed including cost,cost of all labour ,carriage,royalty complete in all respect. | 430.31 | cum | 1,859.33 | ₹8,00,088.29 | BI01010001010000000000000515BI0100001113 |
| 3 | Cement concrete (1:3:6) using 40mm size hard granite C.B. metal approved quary including cost,carriage,royalty, cost of all labour.etc complete and as directed by E.I.C. | 42.18 | Cum | 6,323.67 | ₹2,66,732.4 | BI01010001010000000000000515BI0100001114 |
| 4 | Plain cement concrete (1:2:4) using 12mm size hard granite C.B. chips approved quality from approved quarry including cost,carriage,royalty,cost of all labour.etc complete and as directed by E.I.C. | 26.77 | Cum | 7,874.04 | ₹2,10,788.05 | BI01010001010000000000000515BI0100001115 |
| 5 | R.C.C. M-20 grade with 20mm and down grade C.B.chips of approved quality from approved quarry including hoisting,laying. hire charges of concrete mixture ,vibrator,watering, curing and cost of all materials and labour, etc complete but excluding cost of reinforcement. | 169.16 | Cum | 6,303.05 | ₹10,66,223.94 | BI01010001010000000000000515BI0100001116 |
| 6 | Straightening , cutting, bending bent up or coiled rods, including cranking, hooking, welding or jointing the M.S. Rods or tor confirming to I.S 432(Plain) and 1785(Tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for R.C.C Works including cost,conveyance and taxes of M.S. rods or tor steel and binding wires of 18 to 20 gauge and cost of all labour etc.complete in all respect. | 179.75 | Qtl | 9,555.32 | ₹17,17,568.77 | BI01010001010000000000000515BI0100001117 |
| 7 | Rigid and smooth centering & shuttering for R.C.C works including false works and dismantling them after casting including cost of all materials and labour etc complete.
Column base footing + Mat-1+ Plinth beam | 208.55 | Sqm | 249.82 | ₹52,099.96 | BI01010001010000000000000515BI0100001118 |
| 8 | Floor beam + Landing beam + Column | 411.94 | Sqm | 1,218.89 | ₹5,02,109.55 | BI01010001010000000000000515BI0100001119 |
| 9 | Lintel beam + Landing beam | 10.1 | Sqm | 577.74 | ₹5,835.17 | BI01010001010000000000000515BI0100001120 |
| 10 | Chajja + Roof slab + Landing slab | 207.63 | Sqm | 769.18 | ₹1,59,704.84 | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_597104.xls
BOQ • 0.85 MB
DTCNQtrDeogarhFinal.pdf
Tender Documents • 9.40 MB
Download all tender documents and submit your bid