Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 CrAccepted-Finance LAHAR | ₹9.6 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹10.3 Cr+₹67.2 L (7.00%)Rejected-Finance | ₹10.3 Cr+₹67.2 L (7.00%) | L2 | Rejected-Finance L2 |
| 3 | L3₹10.6 Cr+₹96.0 L (10.0%)Rejected-Finance | ₹10.6 Cr+₹96.0 L (10.0%) | L3 | Rejected-Finance L3 |
Tender Value
₹9.6 Cr
EMD Value
₹9.6 L
Closing Date
7 Jun 2026, 5:30 pmClosed
Addl.C.E.O
Z.P.LATUR
Construction Of Government Quarters Type I, II, III, IV At P. S. Ausa Dist. Latur
2026_LATUR_1302622_1
ZPL/W/E-T/83/2025-26
Open Tender
Civil Works
Percentage
365 days
TQ AUSA
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,540
₹9.6 L
8 Sept 2026
13 May 2026
9 Jun 2026
13 May 2026
7 Jun 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means. Bd.A.1 Page No. 259 Lift upto 1.50m -TYPE-1 QUARTERS | 702.83 | Cum | 215.28 | ₹1,51,305.24 |
| 2 | TYPE-2 QUARTERS | 780.14 | Cum | 215.28 | ₹1,67,948.54 |
| 3 | TYPE-3 QUARTERS | 517.65 | Cum | 215.28 | ₹1,11,439.69 |
| 4 | TYPE-4 QUARTERS | 691.8 | Cum | 215.28 | ₹1,48,930.7 |
| 5 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means TYPE-1 QUARTERS TYPE-1 QUARTERS | 59.53 | Cum | 295.36 | ₹17,582.78 |
| 6 | TYPE-2 QUARTERS | 52.65 | Cum | 295.36 | ₹15,550.7 |
| 7 | TYPE-3 QUARTERS | 38.51 | Cum | 295.36 | ₹11,374.31 |
| 8 | TYPE-4 QUARTERS | 47.13 | Cum | 295.36 | ₹13,920.32 |
| 9 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means TYPE-1 QUARTERS TYPE-1 QUARTERS | 59.53 | Cum | 324.48 | ₹19,316.29 |
| 10 | TYPE-2 QUARTERS | 52.65 | Cum | 324.48 | ₹17,083.87 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.16 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.58 MB
Tendernotice_2.pdf
PDF • 1.01 MB
DDBELOW.pdf
Other Document • 0.08 MB
BOQ_2236512.xls
BOQ • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .