| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.8 LAccepted-AOC | ₹24.8 L | L1 | Accepted-AOC Lowest value |
| Sl No | Description | Qty | Unit | Vino Industry L1 |
|---|---|---|---|---|
| 1.00Excavation of Pole/Stay Pit | ||||
| 2.00 | Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual | 300 | Each | 390 ₹1,17,000 |
| 3.00 | Stay pit 4.5' to 5' depth by using JCB or manual | 120 | Each | 390 ₹46,800 |
| 4.00 | Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual | 150 | Each | 475 ₹71,250 |
| 5.00 | Hard rock without blasting (where houses are located) | 20 | Each | 1,200 ₹24,000 |
| 6.00Erection of poles. | ||||
| 7.00 | PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual | 300 | Each | 475 ₹1,42,500 |
| 8.00 | PSC/ RCC poles/Metal poles above 8.00m by using JCB or manual | 170 | Each | 550 ₹93,500 |
| 9.00 | Erection of stay set complete | 120 | Each | 210 ₹25,200 |
| 10.00Fixing of Cross Arms | ||||
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
22 Sept 2025, 2:30 pmClosed
SE/SEDC/Udayapatty/Salem
O/o The SE/SEDC/SALEM
Works contract for Maravaneri Sub Division in East Division
2025_EB_601627_1
SE/SEDC/WC025/25-26dt.21.08.25
Open Tender
Electrical and Maintenance Works
365 days
Maravaneri
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
28 Jan 2026
8 Sept 2025
23 Sept 2025
9 Sept 2025
22 Sept 2025
9 Sept 2025
Amount
Excavation of Pole/Stay Pit
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Stay pit 4.5' to 5' depth by using JCB or manual
Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual
Hard rock without blasting (where houses are located)
Erection of poles.
PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
PSC/ RCC poles/Metal poles above 8.00m by using JCB or manual
Erection of stay set complete
Fixing of Cross Arms
HT "V" cross arms (all types) / Channel cross arms/ Guarding Cross arms
LT 3 phase cross arms
LT Single phase cross arms
HT/LT TI Fittings
Fixing of HT pin Insulators 22 KV
Fixing of HT 11 KV strain disc.
Fixing of HT 22 KV strain disc
Fixing of LT pin Insulator
Fixing of LT shackle
Fixing of Aluminium Knob
Earthing of pole with coil earthing including burying looping and binding
Paving of Conductor, stringing etc., complete with ACSR/ AAAC for both HT/LT lines.
ACSR 7/4.09 mm Raccoon conductor
ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm Conductor
DT/ DP erection
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)
Below 8 Kms (Plains)
Above 8 Kms. For additional Km (Irrespective of weight in tonnage)
Transport of Poles road side to pole pit including loading and unloading
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100m
Loading and unloading of poles:
Loading of poles upto 8.0 M/ 27
Loading of poles above 8.0 M
Loading of metal poles (All sizes)
Unloading of poles upto 8.0 M/27
Unloading of Poles above 8.0 M
Unloading of metal poles (All sizes)
Loading of materials
Unloading of materials
Leading and stacking of materials
Guarding arrangements:
Flat guarding including fixing of 2 Nos. cross arms
HT Guarding
Service Erected:
Releasing of single phase service and re-fixing.
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Erection of street light including fixure fitting
Concreting of poles:
Mass concreting including materials (Cement + River sand/ M sand and Blue metals and watering)
Sleeve concreting including materials (Cement + River Sand/ M sand and Blue metals and watering)
Dismantling of Line Materials
Dismantling of Transformer structure Complete
Dismantling of Single pole Transformer Structure complete
Dismantling of pole (9.0m and above)
Dismantling of pole (7.5mtr & 8mtr)
Dismantling of pole from pole pit (9.0m and above)
Dismantling of pole from pole pit (7.5mtr & 8mtr)
Dismantling of HT 22 KV Pin Insulator
Dismantling of HT TI Fitting
Dismantling of11 KV disc
Dismantling of 3 PH X arm
Dismantling of Tapping X arm, V X arm & Guarding X arm
Dismantling of 1 PH X arm
Dismantling of Alu Knob
Dismantling of LT pin Insulator
Dismantling of LT Shackle Insulator
Stay set complete Dismantling
Dismantling of 7/4.09 mm ACSR conductor
Dismantling of 7/3.35 mm ACSR conductor
Dismantling of 7/2.59 & 7/2.11 mmACSR conductor
Dismantling of St light fitting
Erection of Transformer
Loading or unloading of Transformer upto 100 KVA
Loading of Transformer above 100 upto 200 KVA
Unloading of Transformer above 100 upto 200 KVA
Loading/ unloading of HT Metering set
Erection of New Transformer all capacities (with jumpering)
Erection of HT Metrering Set
Replacement of failed Transformers all capacities (with jumpering)
Miscellaneous works
Fencing of Distribution Transformer structure at Road side- Fabrication and Erection
Erection of new earth pipe by replacing the corroded earth pipe
Releasing of grills from RCC Poles
Re-sagging of HT/LT lines
Re-sagging ACSR 7/4.09 mm Raccoon conductor
Re-sagging ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
Re-sagging ACSR 7/2.59 mm / AAAC 2.50 mm Weasel and ACSR 7/2.11 mm conductor
GENERAL
Engaging of JCB/ Crane
for first 2 Hrs
For every additional Hrs
Tree cutting works
Cutting of coconut leaves (per tree)
Clearing of branches of trees
Lathe Works
Drilling of hole in channel only 3/4" & 1"
Cutting of channel
T.I.Fitting welding with clamps
Labour charges for alteration of Back Clamps/ Stay Clamps to suit for the works
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid