Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹74.3 LAccepted-AOC | 1 | Accepted-AOC The bidder quotes the value lower than put to tender value | |
| 2 | 2₹74.9 L+₹64,198 (0.86%)Rejected-AOC | 2 | Rejected-AOC The bidder quotes the value higher than put to tender value |
Tender Value
₹74.7 L
EMD Value
₹47,500
Closing Date
5 Sept 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive officer
Arulmigu thirukameshwarar temple ,madavilagam village,cheyyur taluk,chengalpattu district
Repair and restoration of Arulmigu thirukameshwarar temple at madavilagam village,cheyyur taluk,chengalpattu district
2023_HRCE_361493_1
60688/2022/Q1
Open Tender
Civil Works - Others
Lump-sum
270 days
A/m thirukameshwarar temple, madavilagam village
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹47,500
Yes
20 Feb 2024
21 Aug 2023
5 Sept 2023
21 Aug 2023
5 Sept 2023
21 Aug 2023
Amount
Scraping the decayed lime plaster from the surface of Walls, carefully including isolated bricks or brickwork without demaging the vari vargams, racking out the joints, cleaning the surface with water, includinng all working in heights, hire charges for special tooks, brushes complete superficial area including all folds
For Vimanam Upto 25'00"
For Kalakaram
Providing Vargapoochu over the corewalls of Vimanams/Gopurams, with lime Mortor 1:1.5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with lime Mortor 1:1.5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft.superficial area
For Vimanam Upto 25'00"
For Kalakaram
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with non flammable shaded coverings. providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work Vimanam Upto 15'00"
Painting with two coats of water bond emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., over one coat of primer complete as per specification. (S.I. No358)
Clean Removal old paint from the surface of wooden door and painting old wood work with two coats of enamel paint of approved quality.over one coat of primer
Painting old iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing red oxide primer in all floor etc, complete complying with standard specifications.
Removal of Existing Damaged Weathering Course in the temple including all cost of Labour and cost of tranportation, complete etc.. as per standard Specifications
Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications
Finishing the top of roof with one course of machine pressed tiles 20cmx 20cmx20mm of approved quality laid in cm 1:3,12mm thick mixed with water proofing compound 2% by weight of cement used etc, complete with standard specifications
Thorough scrapping of old Stone surface and washing the old Stone surface with the soap. soda and water (or with soda lime, brush and water)
Pointing with lime mortar 1:1.5 the old Stone surface including cost of labour, Material etc., Complete As per Standard Specification.
Earthwork excavation for foundation in all soils and sub soils except hard rock not requiring blasting and filling the sides of foundation with same soil including well consolidation etc complete as per standard specification
Supplying and filling the foundation and basement with filling river sand in layer of roof more than 15cm thick including cost of all charges etc complete as per standard specification.
Cement Concrete 1:5:10 Using 40mm Size HBG Jelly for foundation and flooring concrete including cost of all charges etc complete as per specification.
Supplying errecting and centering for sides and soffits of all R.C.C items of works including cost of all charges etc complete as per standard specification.
columns and sun shades
Plinth beam sides
R.C.C. Standardised M-20 Grade Concrete in all R.C.C. items of works including cost of materials but excluding cost of steel and also including cost of labour charges etc complete as per standard specification.
For Foundation and Basement
For Groundfloor
Supplying, Fabricating and placing in position MS/RTS For all RCC works including cost of steel and GI binding wire an all floors etc. complete complying with standard specification
Brick work in cm 1:5 using country Bricks of size 83/4" x 41/4" x 23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specification.
For basement in Cement mortar 1:5
For superstructure in Cement mortar 1:5
Plastering with cemet mortar 1:5,12mm thick including cost and conveyance of all materials and all labour charges,curing etc,complete complying with standard specifications.
Supplying and Fixing Country Wood Rafters for mangalore tiles including cost of materials labour complete compyling as per standard Specification and as directed by departmental officers.
Roofing with mangalore tiles including cost of materials labour complete compyling as per standard Specification and as directed by departmental officers.
Supplying & fixing Country wood type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications.
Granolythic Floor Finish 25 mm thick its cc 1:2:4 using 10mm to 12mm metal including cot of all material and labour charges and complete.
Supplying & fixing Country wood Window including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Sub Total
V.RAJAVELU
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_430946.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .