Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.8 LAccepted-AOC KHALARI BAZAR KHALARI DISTT RANCHI 829205 JHARKHAND | KHALARI | RANCHI | JHARKHAND | 829205 | ₹3.8 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹3.9 L+₹10,880.02 (2.85%)Rejected-Finance | ₹3.9 L+₹10,880.02 (2.85%) | L-2 | Rejected-Finance L-2 |
| 3 | Rejected-Technical KHALARI RANCHI RANCHI JHARKHAND 829205 INDIA | RANCHI | JHARKHAND | 829205 | - | - | Rejected-Technical Invalid work experience |
| Sl No | Description | Qty | Unit | M/S Sri Ram Electricals and Co L1 | MINTA ELECTRICALS L2 |
|---|---|---|---|---|---|
| 1.00 | Primary and secondary winding of copper wire (14 Swg) | 270 | kg. | 1,248 ₹3,36,960 Lowest | 1,505 ₹4,06,350 |
| 2.00 | Cost of insulating material @ 15 % of item no. 1 . | 1 | job | 50,544 ₹50,544 Lowest | 61,005 ₹61,005 |
| 3.00 | Cost of labour charged @ 15 % of item no. 1. | 1 | job | 50,544 ₹50,544 Lowest | 61,005 ₹61,005 |
| 4.00 | Replacing of Bushing stud withnut bolt washer for 300 KVA, 11 KV /415 V transformer (H.T Side) . | 3 | No. | 7,878 ₹23,634 Lowest | 9,400 ₹28,200 |
| 5.00 | Replacing of Bushing stud withnut bolt washer for 300 KVA, 11 KV /415 V transformer (L.T Side). | 3 | No. | 8,720 ₹26,160 Lowest | 10,500 ₹31,500 |
| 6.00 | Oil filtration of the transformer oil to maintain the required BDV value of oil (225 ltr. X 2 times) | 550 | lit. | 16 ₹8,800 Lowest | 24 ₹13,200 |
| 7.00 | Cost of high pressure test with certificate from NABL | 1 | AU | 23,495 ₹23,495 Lowest | 28,555 ₹28,555 |
| 8.00 | Spray painting of body,radiator and coservator of 300 KVA transformer with 1 coat of primer and 2 coat of enamal paint (grey colour) | 1 | job | 5,450 ₹5,450 Lowest | 6,500 ₹6,500 |
| 9.00 | Less scrap value @ 60 % of item no. 1. | 1 | no. | -2,02,176 ₹-2,02,176 | -2,43,810 ₹-2,43,810 |
| 10.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 58,213.98 ₹58,213.98 Lowest | - |
Tender Value
₹3.5 L
EMD Value
₹4,500
Closing Date
6 May 2025, 5:00 pmClosed
PE(Electrical)
OFFICE OF PO CHP-CPP, Piparwar Area, CCL, PO - Bachra, Dist - Chatra, Jharkhand - 829201 CHP-CPP,PIPARWAR
Repairing/ rewinding of 300 KVA, 11 KV/ 415 V transformer Sr. No. 302/982 make Gandhi Industries (P) Ltd. installed at Billari village under CHP-CPP, Piparwar
2025_CCL_334621_1
PE/Elec/CHP/PPR/e-NIT/25-26/02
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
OFFICE OF PO CHP-CPP, Piparwar Area, CCL
2 documents required · 2 mandatory
₹4,500
14 Jul 2026
26 Apr 2025
7 May 2025
26 Apr 2025
6 May 2025
26 Apr 2025
26 Apr 2025 - 3 May 2025
Amount
Primary and secondary winding of copper wire (14 Swg)
Cost of insulating material @ 15 % of item no. 1 .
Cost of labour charged @ 15 % of item no. 1.
Replacing of Bushing stud withnut bolt washer for 300 KVA, 11 KV /415 V transformer (H.T Side) .
Replacing of Bushing stud withnut bolt washer for 300 KVA, 11 KV /415 V transformer (L.T Side).
Oil filtration of the transformer oil to maintain the required BDV value of oil (225 ltr. X 2 times)
Cost of high pressure test with certificate from NABL
Spray painting of body,radiator and coservator of 300 KVA transformer with 1 coat of primer and 2 coat of enamal paint (grey colour)
Less scrap value @ 60 % of item no. 1.
Total impact of GST for the purpose of CTC
MINTA ELECTRICALS (BID ID -1151495)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .