Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-Finance DHEERAHEDI POST BHOPA DISTRICT MUZAFFARNAGAR | BHOPA | MUZAFFARNAGAR | UTTAR PRADESH | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.5 Cr+₹8.3 L (6.02%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.6 Cr+₹18.9 L (13.8%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical VINOD VIHAR COLONY HATHRAS | HATHRAS | UTTAR PRADESH | 202139 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S PUSHPENDER KUMAR SHARMA L2 | VIKUL KUMAR L1 | M/S VIPIN KUMAR CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in clearance of internal section of canal in all type of soil, with all lift & lead ,the earth from clearance to be disposed in strengthening of canal banks & Dowla with its proper compaction, ramming & dressing complete i/c all cost of labour ,T&P etc. | 4,321.45 | cum | 23 ₹99,393.35 Lowest | 36 ₹1,55,572.2 | 35 ₹1,51,250.75 |
| 2.00 | Earth work in embankment and daula of canal by power transported earth with a lead beyond 200 m and up to 1.0 km including excavation, loading, unloading, manual compaction in 20 cm layers, ramming and dressing the surface to the required levels and slopes and all lifts complete with all applicable taxes i/c all cost of labour, T&P etc. as per directed by engineer-in-charge. | 4,024.55 | cum | 100 ₹4,02,455 Lowest | 140 ₹5,63,437 | 110 ₹4,42,700.5 |
| 3.00 | Extra for daula (size 0.50mx1.50mx0.50m) dressing in proper size and shape excluding cost of earth work i/c cost of all labour , T&P etc complete as per directed by engineer-in-charge. | 15,580 | sqm | 1 ₹15,580 Lowest | 4 ₹62,320 | 3 ₹46,740 |
| 4.00 | Bricks on edge soling with straight over brunt bricks on canal service road i/c joints filled with local sand, preparation of base to proper slope , ramming , dressing and i/c supply of bricks and all material , labour , T&P etc. required for proper completion of work . | 25,200 | sqm | 400 ₹1,00,80,000 | 367 ₹92,48,400 Lowest | 440 ₹1,10,88,000 |
| 5.00 | Scrapping Internal section of canal i.e. Bed & Slope & Bank Top with silt upto 5 cm. i/c all cost of all labour, T&P etc complete. as directed by engineer-in-charge. | 58,622.31 | sqm | 1 ₹58,622.31 Lowest | 4.4 ₹2,57,938.16 | 3.6 ₹2,11,040.32 |
| 6.00 | Earthwork in Excavation in foundation including lead upto 30 m and lift upto 1.50m also i/c backfilling into the trenches labour ,T&P etc.complete | 412.58 | cum | 50 ₹20,629 | 80 ₹33,006.4 | 8 ₹3,300.64 Lowest |
| 7.00 | Providing and Laying cement concrete A20,M10 (1 Cement : 3 Coarse sand: 6 graded stone aggregate) in foundation or flooring including all cost of material, labour, T&P etc complete as required for proper completion of work. | 80.42 | cum | 4,500 ₹3,61,890 | 3,731 ₹3,00,047.02 Lowest | 4,400 ₹3,53,848 |
| 8.00 | Brickwork(M-150) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete. | 292.7 | cum | 5,600 ₹16,39,120 | 4,350 ₹12,73,245 Lowest | 5,000 ₹14,63,500 |
| 9.00 | Providing Centering & Shuttering for R.C.C. work with all cost of
material, labour & T.& P. etc. complete. | 690 | sqm | 200 ₹1,38,000 Lowest | 920 ₹6,34,800 | 350 ₹2,41,500 |
| 10.00 | Providing and Laying RCC A20,M20 (1 Cement : 1.5 Coarse sand: 3 graded stone aggregate) in foundation or slab or column or beam or wall including all cost of material, labour, T&P etc complete as required for proper completion of work. | 218.65 | cum | 6,500 ₹14,21,225 | 4,825 ₹10,54,986.25 Lowest | 6,000 ₹13,11,900 |
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
22 Aug 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE 1st IWC Meerut
Office of SE 1st IWC Meerut
As per the NIT
2026_UPIDC_1176932_2
09/SE-1/2026-27
Open Tender
Civil Works
Piece-work
150 days
Muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.5 L
Office of SE 1st IWC Meerut
22 Sept 2026
14 Aug 2026
22 Aug 2026
14 Aug 2026
22 Aug 2026
14 Aug 2026
18 Aug 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in clearance of internal section of canal in all type of soil, with all lift & lead ,the earth from clearance to be disposed in strengthening of canal banks & Dowla with its proper compaction, ramming & dressing complete i/c all cost of labour ,T&P etc. | 4,321.45 | cum | - | - |
| 2 | Earth work in embankment and daula of canal by power transported earth with a lead beyond 200 m and up to 1.0 km including excavation, loading, unloading, manual compaction in 20 cm layers, ramming and dressing the surface to the required levels and slopes and all lifts complete with all applicable taxes i/c all cost of labour, T&P etc. as per directed by engineer-in-charge. | 4,024.55 | cum | - | - |
| 3 | Extra for daula (size 0.50mx1.50mx0.50m) dressing in proper size and shape excluding cost of earth work i/c cost of all labour , T&P etc complete as per directed by engineer-in-charge. | 15,580 | sqm | - | - |
| 4 | Bricks on edge soling with straight over brunt bricks on canal service road i/c joints filled with local sand, preparation of base to proper slope , ramming , dressing and i/c supply of bricks and all material , labour , T&P etc. required for proper completion of work . | 25,200 | sqm | - | - |
| 5 | Scrapping Internal section of canal i.e. Bed & Slope & Bank Top with silt upto 5 cm. i/c all cost of all labour, T&P etc complete. as directed by engineer-in-charge. | 58,622.31 | sqm | - | - |
| 6 | Earthwork in Excavation in foundation including lead upto 30 m and lift upto 1.50m also i/c backfilling into the trenches labour ,T&P etc.complete | 412.58 | cum | - | - |
| 7 | Providing and Laying cement concrete A20,M10 (1 Cement : 3 Coarse sand: 6 graded stone aggregate) in foundation or flooring including all cost of material, labour, T&P etc complete as required for proper completion of work. | 80.42 | cum | - | - |
| 8 | Brickwork(M-150) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete. | 292.7 | cum | - | - |
| 9 | Providing Centering & Shuttering for R.C.C. work with all cost of
material, labour & T.& P. etc. complete. | 690 | sqm | - | - |
| 10 | Providing and Laying RCC A20,M20 (1 Cement : 1.5 Coarse sand: 3 graded stone aggregate) in foundation or slab or column or beam or wall including all cost of material, labour, T&P etc complete as required for proper completion of work. | 218.65 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.87 MB
TDUpload.pdf
Tender Documents • 6.61 MB
BOQ_2211685.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .