Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC AL GIDDI A ARGADA PO ARGADA DISTT RAMGARH PIN 829108 | ARGADA | RAMGARH | JHARKHAND | 829108 | ₹16.0 L | L1 | Accepted-AOC As Per AOC |
| 2 | L2₹16.4 LRejected-Finance AR NEW FRIENDS COLONY GOSALA ROAD RAMGARH DISTT RAMGARH JHARKHAND POSTAL CODE 829122 | RAMGARH | RAMGARH | JHARKHAND | 829122 | ₹16.4 L | L2 | Rejected-Finance As per TCR |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | RAJESH KUMAR SHARMA L2 | HARIOM CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Fabrication of iron and MS angle structure of pontoon with column, bracing,housing etc | 7.82 | MT | 42,840 ₹3.4 L | 41,690 ₹3.3 L |
| 2.00 | Supply of MS angle ,MS Sheet, MS channel | 7.82 | MT | 96,880 ₹7.6 L | 94,285 ₹7.4 L |
| 3.00 | Cost of making hole and cost of jointing of structure alonwith welding, gas , cuttting. | 1 | Job | 48,888 ₹48,888 | 47,575 ₹47,575 |
| 4.00 | Cost of making 6mm MS plate on top of structure | 1 | Job | 20,272 ₹20,272 | 19,730 ₹19,730 |
| 5.00 | Beldar/coolie for transporting of materialmaking pontoon, base of pump, installation of pumps and its suction delivery | 60 | Head | 585 ₹35,100 | 570 ₹34,200 |
| 6.00 | Cost of painting pontoon structure alongwith priming (all material included). | 1 | Job | 27,440 ₹27,440 | 26,705 ₹26,705 |
| 7.00 | Cost of painting of 66 nos of drum alongwith priming(all material included) | 1 | Job | 39,785 ₹39,785 | 38,715 ₹38,715 |
| 8.00 | Other Overhead and expenses | 1 | No. | 1,26,407 ₹1.3 L | 1,23,000 ₹1.2 L |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos. | - | - |
Tender Value
₹14.6 L
EMD Value
₹18,400
Closing Date
28 Jun 2025, 3:00 pmClosed
Project Engineer (EnM),Urimari OCP
Office of The Project Engineer (EnM),Urimari OCP, Barka Sayal Area, Pin 825311
Fabrication and erection of Pontoon for installation of Pump 2000/1000 GPM discharge at Old Potanga Quarry for dewatering purpose under Urimari OCP.
2025_CCL_337819_1
PE(EnM)/Urimari/e Tender/25-26/15
Open Tender
Electrical and Maintenance Works
20 days
Urimari OCP
As per NIT
2 documents required · 2 mandatory
₹18,400
29 Dec 2025
18 Jun 2025
30 Jun 2025
19 Jun 2025
28 Jun 2025
19 Jun 2025
19 Jun 2025 - 26 Jun 2025
Amount
Fabrication of iron and MS angle structure of pontoon with column, bracing,housing etc
Supply of MS angle ,MS Sheet, MS channel
Cost of making hole and cost of jointing of structure alonwith welding, gas , cuttting.
Cost of making 6mm MS plate on top of structure
Beldar/coolie for transporting of materialmaking pontoon, base of pump, installation of pumps and its suction delivery
Cost of painting pontoon structure alongwith priming (all material included).
Cost of painting of 66 nos of drum alongwith priming(all material included)
Other Overhead and expenses
Total impact of GST for the purpose of CTC
RAJESH KUMAR SHARMA (BID ID -1163457)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid