Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance VILLAGE HARRO P O ROURI TEHSIL DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹7.5 L+₹1.6 L (26.8%)Admitted-Finance | ₹7.5 L+₹1.6 L (26.8%) | L2 | Admitted-Finance |
| 3 | L3₹7.7 L+₹1.7 L (29.1%)Admitted-Finance VILL PO PADHAR TEHSIL PADHAR DISTT MANDI HP | ₹7.7 L+₹1.7 L (29.1%) | L3 | Admitted-Finance |
| 4 | L4₹7.7 L+₹1.8 L (30.4%)Admitted-Finance | ₹7.7 L+₹1.8 L (30.4%) | L4 | Admitted-Finance |
| 5 | L5₹8.0 L+₹2.0 L (34.4%)Admitted-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | ₹8.0 L+₹2.0 L (34.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Subhash Sharma L2 | RAJESH L5 | Parmod Kumar Sharma L1 | SUNIL SHARMA L6 | SANDEEP L4 | Arun Verma L3 | Surinder Kumar Sharma L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All the surplus excavated earth to be dumped at approved dumping site Bharyal. Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 41.14 | P.Cum | 498 ₹20,487.72 | 480 ₹19,747.2 | 200 ₹8,228 Lowest | 600 ₹24,684 | 600 ₹24,684 | 505 ₹20,775.7 | 500 ₹20,570 |
| 2.00 | Stone soling properly hand packed filling interstices with kharanja stone and consolidating with power road roller to the required gradient and comber including spreading, watering and rolling of binding materials moorum or earth etc. complete as per HPPWD specification. 100mm spread thickness (finished work including materials and labour)including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 5.25 | P.cum | 1,950.7 ₹10,241.18 | 1,800 ₹9,450 | 1,000 ₹5,250 Lowest | 2,000 ₹10,500 | 2,150 ₹11,287.5 | 2,000 ₹10,500 | 1,900 ₹9,975 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 14 | P.cum | 4,750 ₹66,504.75 | 4,600 ₹64,404.6 | 3,000 ₹42,003 Lowest | 4,800 ₹67,204.8 | 5,120 ₹71,685.12 | 4,900 ₹68,604.9 | 4,800 ₹67,204.8 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 337.5 | P.sqm | 408 ₹1,37,700 | 450 ₹1,51,875 | 150 ₹50,625 Lowest | 400 ₹1,35,000 | 417 ₹1,40,737.5 | 418 ₹1,41,075 | 500 ₹1,68,750 |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 2,095.6 | P.Kg | 87.7 ₹1,83,784.12 | 101 ₹2,11,655.6 | 88 ₹1,84,412.8 | 100 ₹2,09,560 | 79 ₹1,65,552.4 Lowest | 83 ₹1,73,934.8 | 110 ₹2,30,516 |
| 6.00 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 39.98 | P.cum | 7,430.5 ₹2,97,071.98 | 7,600 ₹3,03,848.61 | 6,800 ₹2,71,864.54 Lowest | 8,000 ₹3,19,840.64 | 7,960 ₹3,18,241.44 | 7,790 ₹3,11,444.82 | 8,000 ₹3,19,840.64 |
| 7.00 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 6.3 | P.Cum | 5,950.5 ₹37,488.15 | 5,900 ₹37,170 | 5,000 ₹31,500 Lowest | 6,000 ₹37,800 | 6,750.3 ₹42,526.89 | 6,390 ₹40,257 | 6,000 ₹37,800 |
Tender Value
₹7.6 L
EMD Value
₹15,200
Closing Date
11 Sept 2025, 5:00 pmClosed
Executive Engineer Road and Building Department
Executive Engineer Road and Building Department M C Shimla
Constrution of Nallah from Govt. Primary School near Bouri to Hand Pump Nalagarh Road in ward No 7 Majiath
2025_MC_113632_2
1868Dated27082025
Open Tender
Civil Works
Item Rate
90 days
Shimla
Please refer Tender Documents
7 documents required · 7 mandatory
₹413
Executive Engineer Road and Building
₹15,200
22 Sept 2025
2 Sept 2025
12 Sept 2025
2 Sept 2025
11 Sept 2025
2 Sept 2025
Amount
Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All the surplus excavated earth to be dumped at approved dumping site Bharyal. Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Stone soling properly hand packed filling interstices with kharanja stone and consolidating with power road roller to the required gradient and comber including spreading, watering and rolling of binding materials moorum or earth etc. complete as per HPPWD specification. 100mm spread thickness (finished work including materials and labour)including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Subhash Sharma (BID ID -554567)
Arun Verma (BID ID -554720)
SANDEEP (BID ID -554588)
RAJESH (BID ID -554642)
SUNIL SHARMA (BID ID -554772)
Surinder Kumar Sharma (BID ID -554757)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .