| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | ₹5.7 L | L1 | Accepted-AOC Low Level Quoted |
| 2 | L2₹5.7 LRejected-Finance | ₹5.7 L | L2 | Rejected-Finance High Level Quoted |
| Sl No | Description | Qty | Unit | V.GOPINATHAN L2 | SANKAR CONSTRUCTION WORK L1 |
|---|---|---|---|---|---|
| 1.00 | 1.Renovation of Two Class Room School Building PUPS Thalavarampoondi Village At Thalavarampoondi Panchayat : Clean removal of cement plaster from walls and Celling | 90.46 | Cum | 10 ₹904.60 | 9 ₹814.14 |
| 2.00 | Casurina Poles 8cm-10cm dia For Scaffolding | 41 | Cum | 19 ₹779 | 19 ₹779 |
| 3.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 90.46 | Cum | 308.8 ₹27,934.05 | 308.8 ₹27,934.05 |
| 4.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). | 90.5 | Cum | 205.8 ₹18,624.90 | 205.8 ₹18,624.90 |
| 5.00 | 2.Renovation of Two Class Room School Building PUPS Poonthandalam At Odanthangal Panchayat : Clean removal of cement plaster from walls and Celling | 90.46 | Cum | 10 ₹904.60 | 9 ₹814.14 |
| 6.00 | Casurina Poles 8cm-10cm dia For Scaffolding | 41 | Cum | 19 ₹779 | 19 ₹779 |
| 7.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 90.46 | Cum | 308.8 ₹27,934.05 | 308.8 ₹27,934.05 |
| 8.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). | 90.5 | Cum | 205.8 ₹18,624.90 | 205.8 ₹18,624.90 |
| 9.00 | 3.Renovation of Two Class Room School Building PUPS Vinobanagar At Thalavarampoondi Panchayat: Clean removal of cement plaster from walls and Celling | 90.46 | Cum | 10 ₹904.60 | 9 ₹814.14 |
| 10.00 | Casurina Poles 8cm-10cm dia For Scaffolding | 41 | Cum | 19 ₹779 | 19 ₹779 |
Tender Value
₹5.8 L
EMD Value
₹5,850
Closing Date
26 Feb 2026, 2:00 pmClosed
Block Development Officer,Uthiramerur
Block Development Officer,Uthiramerur
Renovation of Two Class Room School Building PUPS Thalavarampoondi Village PUPS Poonthandalam PUPS Vinobanagar At PUMS Agaramduli Village Arasanimnagalam Village Kavanurpuducheri Village PUPS Pattankulam PUMS Vadanallur Town PanchayatPUMS Vedapalaym
2026_RDTN_662953_1
R.C.No.229/20265 A17- Dt 14.02.2026
Open Tender
Civil Works
Uthiramerur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,850
5 May 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
1.Renovation of Two Class Room School Building PUPS Thalavarampoondi Village At Thalavarampoondi Panchayat : Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
2.Renovation of Two Class Room School Building PUPS Poonthandalam At Odanthangal Panchayat : Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
3.Renovation of Two Class Room School Building PUPS Vinobanagar At Thalavarampoondi Panchayat: Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
4.Renovation of Two Class Room School Building PUMS Agaramduli Village At Agaramduli Panchayat, : Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
5.Renovation of Two Class Room School Building PUPS Arasanimnagalam Village AT Arasanimangalam Panchayat: Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
6.Renovation of Two Class Room School Building Kavanurpuducheri Village At Kavanurpuduchery Panchayat,: Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
7.Renovation of Two Class Room School Building PUPS Pattankulam At ThalavarampoonduiPanchayat: Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
8.Renovation of Two Class Room School Building PUPS Vedapalayam Towwn Panchayat: Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
9.Renovation of Two Class Room School Building PUPS Annaipallam At Town Panchayat: Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
8. Renovation of Two Class Room School Building PUMS Vadanallur Town Panchayat : Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete cetc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_795870.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Schedule.pdf
Tender Documents • 0.43 MB
BOQ_795870.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid