Loading…
Loading…
Tender ID
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
20 Apr 2026, 3:00 pmClosed
SOHAN LAL
Hisar PHED No. 1
Choudhriwas DNIT for DI Pipeline in place of old AC PVC pipes and construction of HLT and Filter bed for water supply scheme Choudhriwas Distt. Hisar
2026_HRY_514358_1
20267B5DED69 BF09 4DDC 8BEE 951239F269FF564PUH
Open Tender
Civil Works
Works
365 days
CHAUDHRIWAS
Choudhriwas DNIT for DI Pipeline in place of old AC PVC pipes and construction of HLT and Filter bed for water supply scheme Choudhriwas Distt. Hisar
2 documents required · 2 mandatory
₹15,000
₹4.6 L
Yes
10 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
10 Apr 2026 - 20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | WTP 1 MLD: Design and construction of automated PLC controlled water treatment plant as per below mentioned capacity including interconnecting DI pipe from raw water pump to inlet box of WTP, CWT and Suction Well for CW , inlet channel, Alum dozing, Flash mixing, Clari floculator, filter box, over head Reservoir for back wash including pump sets and electric control panel, waste water tank including pump sets and electric control panel, DI pipes, DI specials, manhole covers, air scour equipment, chemical house including chlorination equipment and all other civil / mechanical / electric installations complete in all respects as per DNIT (Sluice valves of make IVC/VAG) | 1 | Per Job | - | - |
| 1.2 | Credit of old bricks bats 40% | - | Cum | - | - |
| 1.3 | Credit of old bricks 60% of brick… | - | No. | - | - |
| 1.4 | credit of bricks | - | No. | - | - |
| 1.5 | credit of old pumping machinery 800 LPM X35 M HEAD | - | No. | - | - |
| 1.6 | credit of steel...1 | - | Kg. | - | - |
| 1.7 | Operation and Maintenance of water Treatment plant of 1.00 MLD SCADA Based for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (Will be charged to the A/mtc estimate). Complete in all respects as per approved NIT.
1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only) | 1 | Job | - | - |
| 1.8 | 1st year Operation and maintenance after defect liability period | 1 | Job | - | - |
| 0.0 | 2nd year Operation and maintenance | 1 | Job | - | - |
| 0.0 | 3rd year Operation and maintenance | 1 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_593185.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .