Tender Value
₹4.6 L
EMD Value
₹5,000
Closing Date
5 Aug 2021, 12:00 pmClosed
Superintending Engineer
Electricity Transmission Circle Agra Kakraitha Road, Near Amar Ujala Press, Sikandara , Agra
Patrolling and Annual Maintenance of 132 KV Transmission Line Under ETSD-II Agra under ETD-I, Agra
2021_UPTCL_580445_2
ET_21_ETC_A_21_ 22
Open Tender
Electrical Works
Lump-sum
365 days
Agra
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE_ETD II Agra
₹5,000
21 Aug 2021
15 Jul 2021
6 Aug 2021
15 Jul 2021
5 Aug 2021
15 Jul 2021
Quartly basis tower to tower ground patrolling of 132 KV Transmission lines with the help of patrolling team consisting of skilled labour and 01 no. supervisor equipped with Binocular and other T&P and detection of defects like missing tower parts, hot point, punctured insulator disc, dislocation of vibration dampers, damaged conductor earthwire, checking of foundation & position of tree in the corridor of 27 Mtr and tree clearance of 4.0 meter of the line, lopping, chopping and cutting of tree branches & Clearing of bird nest, kites their string and all other related things from the tower. Submission of separate patrolling report for each line on prescribed computerized Performa In 2 Sets after each patrolling duly signed by contractor with in 15 days after completion of patrolling.
Tower top patrolling and tightening of jumpers
During Tripping and Break down of lines.
Emergency patrolling of line during tripping to detect the exact fault location & type of fault or as per direction of engineer in charge.
Replacement of damaged/punctured insulators string/disc and fixing new string/disc at fault/breakdown location including carriage of material from store to work site of the above line. All the manpower and T&P shall be provided by contractor.
Replacement of damaged jumpers at tension towers including carriage of material and T&P will be arrange by contractor.
Making & fixing of tower members including cartage of steel angles from S/S store, punching holes for proper placement, tightening of nuts & bolts punching & chamfering at different tower location of above transmission line.
Back filling of earth across the tower foundation wherever required including cost of material, labour, T&P etc and its transportation up to the site.
Repairing of foundation coping, wherever required including cost of material, labour, T&P etc and its transportation up to site.
Tightening / fixing of missing/displaced vibration dampers / arcing horn.
Strengthening of earthwire including replacement / tightening of suspension clamp/copper bond/bull dog clamp as per site requirement
Clearing of accumulated soil around tower legs above chimney, painting of towers legs of 300 mm above chimney of each leg by black rubber seal paint of standard quality to maintain the strength of leg by restricting the rusting of legs due to accumulation of soil and water lodging during rainy season.
S.S. TRANSMISSION AND CONSTRUCTION COMPANY
MS RK ERACTORS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .