Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | Schedule 1 | VISON ENGINEERS | 2 | ₹16,000 |
| 2 | Schedule 2 | VISON ENGINEERS | 2 | ₹29,000 |
| 3 | Schedule 3 | VISON ENGINEERS | 2 | ₹11,000 |
| 4 | Schedule 4 | VISON ENGINEERS | 2 | ₹13,000 |
| 5 | Schedule 5 | VISON ENGINEERS | 2 | ₹13,000 |
Tender Value
₹2.4 L
EMD Value
Exempted
Closing Date
5 Jan 2022, 2:00 pmClosed
NOZZLE 200 KG/HR PE-DZ-1000 PART NO. NZ -200 MAKE- PANCHAL FOR BURNER ASSEMBLY FOR SOUTHERN BOILER (Q3)
BURNER ROD ASSEMBLY 710MM PART NO. NR-710 MAKE-PANCHAL FOR BURNER ASSEMBLY FOR SOUTHERN BOILER (Q3)
Y-TYPE STRAINER ASSBMLY WITH FILTER ELEMENT PART NO: YSTR -85 MAKE-PANCHAL FOR BURNER ASSEMBLY FO (Q3)
INLET PR. REGULATING VALVE 3/4'’ PART NO: IPRV-3/4 MAKE-PANCHAL FOR BURNER ASSEMBLY FOR SOUTHERN BOI (Q3)
BACK PR. REREGULATING VALVE3/8“ PART NO: BPRV-3/8 MAKE-PANCHAL FOR BURNER ASSEMBLY FOR SOUTHERN BOI (Q3)
MODULATION UNIT FOR OIL BURNER PART NO. ARU-WM MAKE-PANCHAL FOR BURNER ASSEMBLY FOR SOUTHERN BOILER (Q3)
FLAME TUBE PART NO. FT-25 MAKE-PANCHAL FOR BURNER ASSEMBLY PE-25 FOR SOUTHERN BOILER (Q3)
DIFFUSER PLATE PART NO. DP-25 MAKE-PANCHAL FOR BURNER ASSEMBLY PE-25 FOR SOUTHERN BOILER (Q3)
2942428
GEM/2021/B/1760980
NOZZLE 200 KG/HR PE-DZ-1000 PART NO. NZ -200 MAKE-PANCHAL FOR BURNER ASSEMBLY FOR SOUTHERN BOILER,B
90 days
Maharashtra; Jalgaon
Item wise evaluation
PRODUCT_CUSTOM
2 documents required · 2 mandatory
| Item | Delivery Location | Qty | Delivery | Spec |
|---|---|---|---|---|
| NOZZLE 200 KG/HR PE-DZ-1000 PART NO. NZ -200 MAKE- PANCHAL FOR BURNER ASSEMBLY FOR SOUTHERN BOILER (Q3) | JALGAON | 4 | 90 days | |
| BURNER ROD ASSEMBLY 710MM PART NO. NR-710 MAKE-PANCHAL FOR BURNER ASSEMBLY FOR SOUTHERN BOILER (Q3) | JALGAON | 2 | 90 days | |
| Y-TYPE STRAINER ASSBMLY WITH FILTER ELEMENT PART NO: YSTR -85 MAKE-PANCHAL FOR BURNER ASSEMBLY FO (Q3) | JALGAON | 2 | 90 days | |
| INLET PR. REGULATING VALVE 3/4'’ PART NO: IPRV-3/4 MAKE-PANCHAL FOR BURNER ASSEMBLY FOR SOUTHERN BOI (Q3) | JALGAON | 2 | 90 days | |
| BACK PR. REREGULATING VALVE3/8“ PART NO: BPRV-3/8 MAKE-PANCHAL FOR BURNER ASSEMBLY FOR SOUTHERN BOI (Q3) | JALGAON | 2 | 90 days | |
| MODULATION UNIT FOR OIL BURNER PART NO. ARU-WM MAKE-PANCHAL FOR BURNER ASSEMBLY FOR SOUTHERN BOILER (Q3) | JALGAON | 1 | 90 days | |
| FLAME TUBE PART NO. FT-25 MAKE-PANCHAL FOR BURNER ASSEMBLY PE-25 FOR SOUTHERN BOILER (Q3) | JALGAON | 2 | 90 days | - |
| DIFFUSER PLATE PART NO. DP-25 MAKE-PANCHAL FOR BURNER ASSEMBLY PE-25 FOR SOUTHERN BOILER (Q3) | JALGAON | 4 | 90 days |
Exempted
13 Jan 2022
15 Dec 2021
5 Jan 2022
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_2942428.pdf
GEM_BID
nozzle-200-kghr-pe-dz-1000_2021-12-08-15-51-04_59a717c34d05a11b5aee5c9949ef03c4.pdf
SPECIFICATION
burner-rod-assembly-710mm_2021-12-08-15-54-44_d7e0149d2b9fcb0a0e35522b5e7c910c.pdf
SPECIFICATION
y-type-strainer-assbmly-with-filter-element_2021-12-08-15-57-48_472037ae379c5208f535ce7f8050b96a.pdf
SPECIFICATION
inlet-pr-regulating-valve-34_2021-12-08-16-01-16_3225b07cf1d340c6856dd0af53c3a54c.pdf
SPECIFICATION
back-pr-reregulating-valve38_2021-12-08-16-03-11_b15aac61180245565dbd3f2262930da1.pdf
SPECIFICATION
modulation-unit-for-oil-burner_2021-12-08-16-05-20_eeb28a13f892e2e1317a7868417804f1.pdf
SPECIFICATION
flame-tube_2021-12-08-16-08-34_cfff3053fbbfc9858c78bd508d8affef.pdf
SPECIFICATION
diffuser-plate_2021-12-08-16-10-51_19c798125118e044875c893ca1b075e2.pdf
SPECIFICATION
1639544464.pdf
OTHER
termsCondition.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .