Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC GOA GOA | ₹16.0 L | L1 | Accepted-AOC Accepted Being L1 Bidder |
| 2 | L2₹17.4 L+₹1.3 L (8.29%)Rejected-Finance GOA | ₹17.4 L+₹1.3 L (8.29%) | L2 | Rejected-Finance Rejected Being L2 Bidder |
Tender Value
₹16.6 L
EMD Value
₹33,245
Closing Date
21 May 2026, 9:30 amClosed
Executive Engineer DIV VIII ASW PWD Fatorda
Executive Engineer DIV VIII ASW PWD Fatorda
Land development and providing GI chain link fencing for compound wall at Monte Hill, Margao in Margao Constituency (Re-Tender).
2026_PWD_29268_1
PWD/Div8/ASW/2001/04/26-27/L1
Open Tender
Civil Works - Buildings
Percentage
60 days
Fatorda
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
₹33,245
Yes
21 May 2026
18 May 2026
21 May 2026
18 May 2026
21 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic exca vator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.;All kinds of soil | 3.65 | Cu.m | 291 | ₹1,062.15 |
| 2 | Earthwork in surface excavation not exceeding 30 cm depth(but exceeding 1.5 m width as well as 10 sq.m on plan) including disposal of excavated earth beyond work site for all leads lift disposed earth to be leveled and neatly dressed in: Hard Soil | 975 | Sq.m | 66 | ₹64,350 |
| 3 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 102 | Cu.m | 245 | ₹24,990 |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 195.61 | Cu.m | 2,211 | ₹4,32,493.71 |
| 5 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : All works upto plinth level | 100.54 | Cu.m | 6,635 | ₹6,67,082.9 |
| 6 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) (Square Hollow Section (SHS) IS4923 /Rectangular Hollow Section (RHS) IS4923/ Circular Hollow Section (CHS) IS1161 closed Structural Steel of (SAIL, TATA. VIZAG, JSW ,APOLLO Steel Ltd.) make (Min Yeild Stress 310 Mpa)) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. | 1,238.29 | kg | 184 | ₹2,27,845.36 |
| 7 | Steel work in single sections (SAIL, TATA. VIZAG & using electrodes of Ador or ES4B or Deh Secheron make only) including cutting, hoisting fixing in position and applying a priming coat of red lead paint. In R.S. joists, channels, angles, tees | 3.15 | qtl | 13,711 | ₹43,189.65 |
| 8 | Painting two or more coats (excluding priming coat) with superior quality ready mixed paint for steel work of approved brand & manufacture in all shades on new work to give an even shade. | 147.59 | Sq.m | 107 | ₹15,792.13 |
| 9 | Providing and fixing G.I. chain link mesh 6.35cm x 6.35 cm x 10 gauge (2.5” x 2.5” x 10 gauge) fixed with angle iron posts and struts by G.I. or M.S. staples at 20cms apart with welding with the iron posts (placed at 3 meters centre to centre) including providing barbed wire stiffeners (shall weigh 9.33 kg. per 100 meters minimum) at top and bottom with barbed wire stiffers by binding wires at 50cms centre to centre complete as per the direction of the Engineer – in – charge (angle iron posts struts, earthwork and concrete for fencing posts and struts to be paid separately) | 90 | Metre | 285 | ₹25,650 |
| 10 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 7.65 | Cu.m | 5,186 | ₹39,672.9 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
Tendernotice_2.pdf
PDF • 1.46 MB
BOQ_29695.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .