Operation Preventive Maintenance of IIM new campus, Nayasarai, Ranchi supply at risk and cost from previous agency
NBCC/RAN/etender/2024/101
NBCC/RAN/etender/2024/101
Open Tender-Domestic
Civil Works - Buildings
Ranchi, Jharkhand
₹11,800
₹4.9 L
4 Aug 2026
19 Mar 2024
1 Apr 2024
1 Apr 2024
3 Apr 2024
GRAND TOTAL 48,737,796.28
BILL OF QUANTITIES (MEP O & M)
DSR- RATE IN RS. AMOUNT IN RS
S.No. Description of item of work Unit QTY
2021/ DSR NS DSR NS
COMPREHENSIVE MAINTENANCE
2ND YEAR OF OPERATION & ROUTINE MAINTENANCE
1 SUB HEAD-II : HVAC SYSTEM
Day to Day Operation of Chilled Water System & VRF System during working hours
i.e 8:00 am to 8:00 pm. As per scope of work and general terms and conditions and Per Month 10.50 177,604.89 - 1,864,851.37
as directed by engineer-in-charge.
Routine maintenance related to day to day operations of HVAC system,VRV/VRF air-
conditioning system as per good engineering practice, recommendation of the
manufacturer/OEM, instructions of Engineer-in-Charge and as per terms and
conditions specified.
270 TR x 4 Nos Water Cooled Chillers, cooling towers with primary, secondary &
condenser pumps with associated items viz AHU's & FCU's
748 HP VRF System with indoor units
20.5 TR HI - wall Split Unit
22 TR Ductable split unit
2ND Year Maintenance Per Month 10.50 422,916.67 4,440,625.04
SUB TOTAL - 6,305,476.41
2 SUB HEAD-III : DG SET
Day to Day Operation of DG Set on all days of year including Sundays & Holidays
and as per scope of work and general terms and conditions and as directed by Per Month 10.50 105,567.80 - 1,108,461.92
engineer-in-charge.
Running, Operation & AR & maintenance of - 1010 KVA,500 KVA DG sets, on
all the days including Sundays & Holidays complete with all materials i/c Diesel oil
etc as per good engineering practice, recommendation of the manufacturer/OEM,
instructions of Engineer-in-Charge and as per terms and conditions specified.
1010 KVA ,500 KVA DG set
2ND Year Maintenance Per Month 10.50 57,375.00 602,437.50
SUB TOTAL - 1,710,899.42
3 SUB HEAD-IV : BMS
Day to Day Operation of Building Management System on all days of year including
Sundays & Holidays as per scope of work and general terms and conditions and as
directed by engineer-in-charge.
Routine maintenance related to day to day operations of field devices, DDC
Controllers, Lighting management system, Mortised management system, Energy
management system, softwares, sensors duringr DLP of One year as provided under
the main contrac as per good engineering practice, recommendation of the
manufacturer/OEM, instructions of Engineer-in-Charge and as per terms and
conditions specified
2ND Year Maintenance Per Month 10.50 237,877.09 - 2,497,709.41
SUB TOTAL - 2,497,709.41
NON - COMPREHENSIVE MAINTENANCE
SUB HEAD-V : ARM OF WET RISER & SPRINKLER SYSTEM, FIRE ALARM,
FIRE DETECTION SYSTEM, PUMP SYSTEM, UG AND OVERHEAD TANK.
Routine maintenance related to day to day operations of fire-fighting system Internal
and External i.e. including providing services for operation of manual fire alarm
,detection system, Fire alarm panel, down comer system, Pumps intercom & Lift
NS intercom, 24x7 on all days of the during DLP of One year including Holidays as per
scope of work and general terms and conditions and as directed by engineer-in-
charge. i/c periodical fire testing, mock drill & obtaining fire clearance certificate as &
when becomes due.
All water lines, motor, pumps, electrical wiring, intake, any other Pump/ machinery
2ND Year Maintenance Per Month 10.50 196,827.67 2,066,690.54
SUB TOTAL - 2,066,690.54
SUB HEAD-VI : HT/LT PANEL & ELECTRIC EQUIPMENTS, ELECTRICAL
INSTALLATIONS, UPS
Routine maintenance related to day to day operations of sub station equipment's
including HT/LT panel during DLP of One year of all electrical external installations
& street light in the campus 24x7 for all days in a month i/c sundays and holidays
and As per scope of work and general terms and conditions and as directed by
engineer-in-charge.
Routine maintenance related to day to day operations of internal installations
including all associated accessories such as DB, switches ,socket, wiring ,lighting
control system (DALI), occupancy and day lighting sensor ,automatic sliding doors
etc.As per scope of work and general terms and conditions and as directed by
engineer-in-charge.
Routine maintenance related to day to day operations of photo voltaic Solar power
generation system 700KwP DLP of One year as provided under the main contract
including trouble shooting, preventive maintenance and breakdown maintenance
etc. as required as per good engineering practice, recommendation of the
manufacturer/OEM, instructions of Engineer-in-Charge and as per terms and
conditions specified
Weekly/periodically preventive maintenance shall be essentially carried out by
deploying full team on Tuesday to check each & every civil , electrical , pumps
items etc and maintained the record .
Routine maintance and day to day opreations
Transformer ( 02 Nos 1600 KVA )
LT Main Panel, LT main common service panel and DG automation system
LT common service panels
LT lighting panel
LT meter panels
LT rising mains with main adaptor switch
LT lifts panels at top
LT panels and starter panel for VRF/HVAC/submersible/firefighting
Firefighting Panel,
Submersible pump and all Pump panel,
700 Kwp Roof Solar system
Solar Water heater
Digitally signed by PRIYA
2ND Year Maintenance Per Month 10.50 295,081.54 3,098,356.15
SUB TOTAL - 3,098,356.15
6 NS SUB HEAD - VII: STP WORKS
To operate the entire STP under available load conditions for further period of 365
days round the clock.( Including Sunday and Holidays) As per scope of work and Per Month 10.50 170,794.77 1,793,345.10
general terms and conditions and as directed by engineer-in-charge.
SUB TOTAL 1,793,345.10
7 NS SUB HEAD - VIII: LV SYSTEM WORKS AND SERVER ROOM IN SERVICE BLOCK
Routine maintenance related to day to day operations of LV System, Audio System
Smart Class Room 50/80/130 Seater, sprinkler system, Audio Visual system in
Meeting & Board Room, Audio Visual system in Seminar Hall, Stage Lighting in
Seminar Hall, Wifi, CCTV,PA System, Data & Voice network,Fire wall, core switch,
NVR system, L1 and L2 switch, Distribution switch, floor switch, POE switch, CCTV
mounting system, AP controller and AP with EPABX system, Internal and external Per Month 10.50 295,884.18 3,106,783.85
OFC cable for all the building etc etc during DLP of One year as provided under the
main contract including trouble shooting, preventive maintenance and breakdown
maintenance etc. as required as per good engineering practice, recommendation of
the manufacturer/OEM, instructions of Engineer-in-Charge and as per scope of work
and general terms and conditions and as directed by engineer-in-charge..
SUB TOTAL 3,106,783.85
8 NS SUB HEAD -IX: OTHER SPECIAL REPAIR WORKS
Prime Cost of all Consumables/Running Bill/CAMC/Additional/upgradation works
including CP @15% required in Connection with the smooth operation &
maintenance work which not covered in the BOQ, but neet to be executed as per the
requirement of site/or instruction given by client/as per the direction of Engineer.
SUB TOTAL 20,579,260.87
GRAND TOTAL (II nd YEAR OF OPERATION & ROUTINE MAINTENANCE )
GRAND TOTAL (II nd YEAR OF OPERATION & ROUTINE MAINTENANCE )
9 SUB HEAD -X: Diesel Consumption
Tranportation, Supply and filling of fuel (Diesel) in DG set as per the
reqirement at site and direction of Engineer In-charge. The actual amount
incurred per month will be paid to the contractor on submission of invoice.
IInd Year Maintenance Per Month 10.50 250,000.00 2,625,000.00
SUB TOTAL 2,625,000.00
Digitally signed by PRIYA
NBCC (INDIA) LIMITED
1 Unit : IIM works, Ranchi
2 Name of Work : Operations and maintenance in the permanent campus of IIM Ranchi.
Operation & Preventive Maintenance of Civil Installation, HT & LT Electrical Installation, LMS, Roof solar system, Fire Fighting, Fire Alarm, Public Address System, Substation, DG
Set, STP & WTP, HVAC Plant, Water supply Pumps, BMS & CCTV System, IT & AV Services, EPABX, and Horticulture Works etc. for IIM Ranchi, Jharkhand
COST OF SUMMARY (Civil O & M)
S.No. DSR- Description of item of work RATE IN RS. AMOUNT
2021/ Unit BOQ QTY
DSR NS DSR NS
1 SUBHEAD - I: CIVIL, PLUMBING , WATER SUPPLY &
1.0 NS Day to Day Maintenance of Civil, Plumbing, Water
Supply & Sewerage System on all days of year
including Sundays & Holidays by carrying out
activities as defined in scope of work and general
terms and conditions and as directed by engineer-in-
1.1 NS Day to day operations of WTP plant for One year as
required as per good engineering practice,
recommendation of the manufacturer, instructions of
Engineer-in-Charge and as per scope of work and
general terms and conditio in
Nacl for regenration of water softening plants and
1.2 normal wear and tear for motor/pump/panel/pipe line Per Month 10.50 705,097.20 - 7,403,520.60
Sampling of water per month (pH value, Hardness of
product water and Total suspended solids.)
1.3 All water lines, motor, pumps, electrical wiring, intake,
any other Pump/ machinery installed etc. - -
1.4 Any other works in connection with the smooth
operation & maintenance work not mentioned above,
but required to be carried out with in the cost and/ or - -
also as per direction of the Engineer -in - charge .
a. 2ND Year Maintainenace - -
SH V SUB HEAD-V : CLEANING OF WATER TANK (AT
EVERY THREE MONTHS)
5 14.78 Cleaning of under ground sump, Over Head R.C.C. Tank (
independent staging) including disposal of slit and rubbish, all
as per direction of Engineer-in-Charge.(At every three month
The cleaning shall consist of following minium operations:-
(i) Tank shall be emptied of water by pumping & bottom shall
be cleaned of silt and other deposits.
(ii) Entire surface area of the sump shall then scrubbed
thoroughly with wire brush etc. and pressure washed with sqm 6,280 71.30 447,764.00 -
(iii) Chlorination of RCC internal surface by liquid chlorine.
(iv) The treated surface shall be dried using air jetting and all
loose particles shall be removal from the surface.
(v) Finally the surface shall be treated with ultraviolet radiation
etc. as per direction of Engineer-in-Charge
SUB TOTAL 447,764.00
SUB HEAD-VII: DISPOSAL OF GARBAGE ETC.
"Disposal of moorum/ building rubbish/ malba/ similar
unserviceable, dismantled or waste material by
mechanical transport including loading, transporting,
unloading to approved municipal dumping ground for
lead upto 10 km for all lifts, complete as per
directions of Engineer-in-Charge.
SUB TOTAL. 150,124.50
SUB HEAD-VIII: HORTICULTURE WORK - -
7 NS Complete maintenance of the entire garden features
i/c lawn, ,shrubs, hedge, potted plants, flower beds,
creepers etc. and other garden features including
watering, hoeing, making of plants basin, manuring,
trimming and cleaning of hedges/ plants beds,
spraying of insecticides, fungicides, weeding, mowing
and top dressing of lawn with good earth and
manure and hedge clipping and removal of the
garden waste as per direction and satisfaction of the
officer-in- charge (including the cost of manure and
good earth) to maintain the plants, hedge and
lawns in good and healthy conditions at all the time
during the maintenance period as mentioned in
scope of work and general terms and conditions.
SUB TOTAL 2,832,344.55
8.00 NS SUB HEAD - IX: OTHER SPECIAL REPAIR WORKS - -
Digitally signed by PRIYA
Any other special repair work/urgent work required in
Connection with the smooth operation & maintenance
work which is not covered in the BOQ,will be
executed as per the instruction/approval given by
client or as per the direction of Engineer in charge.
(Any saving happens in 1st year, it may be added
in the 2nd year SR work head)
SUB TOTAL - 1,250,000.00
9.00 NS SUB HEAD - XI: Façade - -
Mechanized Cleaning of the entire campus Outer
Façade , cleaning of Aluminum louver, cleaning of
External and internal Signages, cleaning ACP of the
building by applying chemicals and other materials
etc. at any height, during DLP of One year as
required as per good engineering practice,
recommendation of the manufacturer, instructions of
Engineer-in-Charge etc. (Regular interval of 03
SUB TOTAL 3,960,000.00
10.00 Providing technical manpower such as Technical
supervisor (3 Nos. for three shift) and safety officer
(1 Nos in 1 shift) for supervision of the entire O&M Per Month 10.50 104728.3994 - 1,099,648.19
works. (Shift timing will be decided by Engineer-In-
SUB TOTAL 1,099,648.19
Grand total 25,533,535.41
Grand total 25,533,535.41
Digitally signed by PRIYA
stage.html
html • 0.05 MB
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
1 NIT.pdf
Tender Document
2 BOQ.pdf
Tender Document
3 SCC.pdf
Tender Document
4 GCC Contracting 2022.pdf
Tender Document
5 SCOPE OF WORK AND GENERAL TC.pdf
Tender Document
corrigendum-2424-Corri-4 101.pdf
pdf • 0.10 MB
corrigendum-2410-Corri-3 101.pdf
pdf • 0.12 MB
corrigendum-2364-Corri-2 101.pdf
pdf • 0.12 MB
corrigendum-2349-Corri-1 101.pdf
pdf • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .